검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 360

        242.
        2016.10 서비스 종료(열람 제한)
        Precise Inspection for Safety Diagnosis on 6 dams have been conducted by KISTEC. Spillway is the main structure of dam facilities especially in discharging water. Crack, leakage, and other defects have been inspected and analyzed depending on the purpose of spillway such as water gate or gate of intake.
        243.
        2016.10 서비스 종료(열람 제한)
        The purpose of this study is to present a suitable maintenance guide or plan for future small scale vulnerable facilities by analyzing the investigation data collected through the safety inspection. For this, we examined about 3,301 buildings. From a number of defects, damages associated with the safety and durability of building were preferentially analyzed.
        244.
        2016.10 서비스 종료(열람 제한)
        By amending of the special law on the safety management of the facility, coastal structures(breakwaters) have been incorporated into kinds of facilities. In this paper, an inspection manual for the coastal structures(breakwaters) will be introduced.
        245.
        2016.10 서비스 종료(열람 제한)
        By amending of the special law on the safety management of the facility, underground structure have been incorporated into kinds of facilities. In this paper, an inspection manual for the underground structure will be introduced.
        246.
        2016.10 서비스 종료(열람 제한)
        This study aims to establish complementary relationship among designer, builder, and maintenance manager by combining BIM(Building Information Modeling) technology with bridge safety diagnosis and maintenance to secure its effectiveness and systematization. To establish and maintain database by organizing quantities of data about existing case of safety diagnosis and maintenance, and develop the system to be used by practitioners.
        247.
        2016.09 KCI 등재 서비스 종료(열람 제한)
        최근 이슈가 되고 있는 도심지 지반함몰로 인하여 주기적인 하수관로 조사의 필요성이 강조되고 있다. 일반적으로 수행되는 조사 방법 중 하나인 하수관로 CCTV조사는 상당한 시간과 노력이 소요된다. 기존 연구들은 주로 하수관로 조사에 소요되는 노력을 줄이기 위한 H/W 및 S/W의 개발에 관한 연구가 주를 이루고 있다. 그러나 기존 CCTV 탐사장치를 이용하여 관리담당자가 보관하고 있는 수많은 조사영상 를 활용하기 위한 연구는 진행되지 않았다. 본 연구는 cross-correlation기법 기반의 이미지프로세싱 방법을 적용하여 CCTV 조사영상의 자막 으로부터 장치의 위치정보를 추출하였다. CCTV 장치의 시간-거리 관계를 분석한 결과 탐사 장치가 정지시간과 하수관로의 손상 사이의 강한 상관관계를 확인하였다. 제안된 CCTV영상의 분석법을 활용하는 경우 CCTV조사 보고서 작성 및 관리에 소요되는 노력을 줄임으로써 하수관 로 유지관리의 효율성과 신뢰도를 높일 수 있을 것으로 기대된다.
        248.
        2016.09 KCI 등재 서비스 종료(열람 제한)
        교량의 안전은 점검에 의해 보장된다. 그리고 교량의 유지관리는 점검결과를 토대로 시작된다. 따라서 점검결과는 ‘교량의 안전’과 ‘효율적인 유지관리’를 위한 가장 중요한 정보이다. 따라서 본 논문에서는 교량의 점검신뢰도를 평가하고 이를 제고 할 수 있는 방안을 제시하 고자 한다. 이를 위해 본 논문에서는 교량의 점검신뢰도를 평가 할 수 있는 세 가지 점검신뢰도를 제시하였다: 명목점검신뢰도, 실질점검신뢰 도, DS명목점검신뢰도. 교량의 점검신뢰도 분석 방법은 정밀안전진단결과를 참값으로 간주하고 당해년도 정밀(정기)점검과 차년도 정밀안전 진단결과를 비교하였다. 인적오류를 고려한 DS명목신뢰도를 기준으로 현재 고속도로교량의 점검신뢰도 85%로 양호한 편으로 평가 된다. 이 는 현재 고속도로 교량의 평균공용연수가 13년으로 대부분의 교량이 ‘A’와 ‘B’등급에 집중적으로 분포되어 상태변화가 크지 않기 때문인 것 으로 판단된다. 점검신뢰도를 제고하기 위해서는 점검자의 역량을 강화하고 전문점검인력 육성이 필요하며 점검결과에 대해 QC(Quality Control, 품질관리)를 실시하여 점검결과의 신뢰도 향상이 필요하다.
        249.
        2016.06 KCI 등재 서비스 종료(열람 제한)
        Recently, interests for maintenance of transmission tower are increasing to extend life of structures and reduce maintenance cost. However, existing classical diagnosis method of corrosion deteriorated degree on the transmission tower steel members, visual inspection, has a problem that error often due to difference of inspector’s individual knowledge and experience. In order to solve the problem, this study carried out to develop the corrosion deterioration inspection tool for transmission tower steel members. This tool is composed of camera equipment and computer-aided diagnosis system. We standardized the photographing method by camera equipment to obtain suitable pictures for image processing. Diagnosis system was designed to evaluate automatically degree of corrosion deterioration for member of transmission tower on the basis of the RGB color image processing techniques. It is anticipated that developed the corrosion deterioration inspection tool will be very helpful in decision of optimal maintenance time for transmission tower corrosion.
        250.
        2016.04 서비스 종료(열람 제한)
        Inspection of bridges in the United States has been regulated by the federal government since 1968, when a national bridge inspection program was established that recognized the need for periodic and consistent bridge inspections. The first National Bridge Inspection Standards (NBIS) were developed in 1971. Since then, inspection standards, policies, and procedures have continued to evolve. This paper describes some of the recent changes and trends with bridge inspection practices in the United States.
        251.
        2016.04 서비스 종료(열람 제한)
        This paper was written to introduce one of US inspection practice using mobile devices such as iPad or Android tablets and other wearable computing devices. Application of mobile device for bridge inspection is to collect all required asset information without filed notes and complete bridge inspection quickly. This provides time-saved input and customized input from the office and on the web. This paper talks about how much this technology is efficiency and useful to give benefit subsequent projects through several US bridge inspection projects performed by Burgess & Niple.
        252.
        2016.04 서비스 종료(열람 제한)
        In this study, Levee Visual Inspection and Water Level Detection System was developed to handle visual inspection information on the levee effectively by using mobile/intelligent CCTV system. This system will be used to manage levee reasonably, in order to prevent disaster in the riparian areas preemptively on the base of management task.
        253.
        2016.04 서비스 종료(열람 제한)
        There are currently using widly and universally underwater inspection of based on SONAR around world. Understand the principles od SONAR’s ultrasonic for disaster prevention of underwater structures and though indoor test it could try consideration with respect to the characteristics of the ultrasonic frequency.
        254.
        2016.04 서비스 종료(열람 제한)
        This study carried out an investigation about damage characteristic of substructure such as pier and abutment of highway bridge. The applied methodology was the average damage analysis according to service life. By using above methodology, damage characteristic of substructure penetrated water included de-icing salt was investigated. It was found that the area where was under heavy snow exhibited higher amount of average damage than that of the area where was under much less snow.
        255.
        2016.04 서비스 종료(열람 제한)
        Using a servo acceleration sensor applied to the inertial navigation system for various weapons system, We developed a sensor which can measure the safety of structure and earthquake. To verify the performance of the sensor, we analyzed the building structure frequency domain, low frequency domain, El-centro sesmic wave for response characteristic. We also tested the sensor whether it can measure angular displacement or not.
        256.
        2016.04 서비스 종료(열람 제한)
        Tried to photographing of aerial Image using unmanned aerial vehicle for applied to safety inspection on a large area or inaccessible. In result, 3D Spatial Information data were acquired, understand the overall terrain and coastline to based on data, compared to traditional aerial images and analyzed. Finally, identified the regions to requiring continuous monitoring by assessment of a disaster risk. We hoping to help build to continues data for identified the changing shape over time.
        257.
        2016.01 KCI 등재 서비스 종료(열람 제한)
        CT 조영검사 예약환자의 원활한 검사 진행과 조영검사로 인한 부작용을 줄일 수 있는 전처치 프로세스 시스템을 개발 및 적용하여 CT 조영검사 예약환자의 검사 만족도를 높이고자 하였다. 2014년 1월부터 201 4년 2월까지 CT 조영검사를 예약하여 추적검사를 시행했던 2,846명의 환자들 중 예약시간에 검사를 시행 하지 못하고 지연된 214명의 환자들을 대상으로 지연사유를 분석한 후 전처치 프로세스 시스템을 구상 및 개발하여 2015년 1월부터 2015년 2월까지 전처치 프로세스 시스템을 이용하여 전처치가 필요한 644명을 대상으로 SMS 전송 시행율, SMS 전송내역, 예약시간 준수율, 예약시간 지연 사유, 예약 시간보다 지연된 시간 등을 분석하였다. 2014년 1~2월 외래 CT 조영검사 예약환자는 2,846명이었고, 그 중 예약시간에 검사 를 시행하지 못한 환자는 214건으로, 약 7.52%의 비중을 차지하고 있었다. 예약시간보다 지연된 세부적인 사례는 creatinine 미확인이 98건(46%), creatinine 1.3 이상이 40건(19%), 과거조영제부작용이 34건(16%), 금 식 등 전처치 미흡이 25건(11%), 메트포민제제 당뇨약 복용이 4건(2%), 기타 이유가 13건(6%)으로 나타났 으며, 평균 지연시간은 creatinine 미확인이 120분, creatinine 1.3이상이 30분, 과거조영제부작용이 40분, 금식 등 전처치 미흡이 120분, 메트포민제제 당뇨약 복용이 30분, 기타 사유가 60분으로 나타났다. 2015년 1월~2 월 전처치 프로세스 시스템을 적용하여 전처치가 필요한 대상자 644명중 SMS 전송시행율은 515건(80%)으 로 나타났으며, SMS 전송내역을 분석한 결과 당일 검사가 283건(44%), 진료과 방문이 185건(29%), 전처치 불필요가 47건(7%), 외래과에서 전처치 프로세스 시스템 미확인으로 SMS 전송이 안 된 건수가 129(20%)건 으로 나타났다. CT 조영검사 예약시간 준수율은 전체 644건 중 560건(87%)이 예약시간 안에 검사를 시행 하였으며, 예약시간보다 지연된 세부적인 사례는 creatinine 미확인이 23건(28%), creatinine 1.3이상이 11건(1 3%), 과거조영제부작용이 7건(8%), 금식 등 전처치 미흡이 30건(36%), 메트포민제제 당뇨약 복용이 6건( 7%), 기타 이유가 7건(8%) 이었다. 예약시간보다 평균 지연된 시간은 creatinine 미확인이 90분, creatinine 1. 3이상이 20분, 과거조영제부작용이 30분, 금식 등 전처치 미흡이 120분, 메트포민제제 당뇨약 복용이 30분, 기타 사유가 60분으로 나타났다. 조영제 부작용의 효율적인 관리적 측면과 CT 조영검사 예약시간에 검사가 원활하게 진행될 수 있도록 전처치 프로세스 시스템을 적용해본 결과 적용 전에 비해 전처치 준비 시간이 줄어들고 CT실, 진료실, 채 혈실, 주사처치실 등의 방문횟수 및 동선이 줄어들어 CT실을 찾는 고객들의 검사만족도와 의료서비스 향 상에 기여가 될 것으로 사료된다.
        258.
        2015.10 서비스 종료(열람 제한)
        This study was performed to analyze the deterioration items of jointed rock slope using the Precision Inspection Results. As a result of study, the deterioration items of jointed rock slope was found out. The results can be utilized for the efficient management.
        259.
        2015.10 서비스 종료(열람 제한)
        This paper aims at developing a methodology for estimating the bridge life based on a deterioration model associated with inspection accuracy. This study used condition rating results of bridges and developed a non-linear regression model taking into account the IRI (Inspection Reliability Index).
        260.
        2015.10 서비스 종료(열람 제한)
        Pumping Station is amended ('15.1.6) a special law (hereinafter siteukbeop) on the safety management of the facility has been incorporated into kinds of facilities. This study aims to introduce siteukbeop drainage pumping stations as part of condition assessment techniques detailed guidelines established for drainage pumping stations being incorporated into the new facility as amended.