A new clamped mechanical splice system was proposed to develop structural performance and constructability for precast concrete connections. The proposed mechanical splice resists external loading immediately after the engagement. The mechanical splices applicable for both large-scale rebars for plants and small-scale rebars for buildings were developed with the same design concept. Quasi-static lateral cyclic loading tests were conducted with reinforced and precast concrete members to verify the seismic performance. Also, shaking table tests with three types of seismic wave excitation, 1) random wave with white noise, 2) the 2016 Gyeongju earthquake, and 3) the 1999 Chi-Chi earthquake, were conducted to confirm the dynamic performance. All tests were performed with real-scale concrete specimens. Sensors measured the lateral load, acceleration, displacement, crack pattern, and secant system stiffness, and energy dissipation was determined by lateral load-displacement relation. As a result, the precast specimen provided the emulative performance with RC. In the shaking table tests, PC frames’ maximum acceleration and displacement response were amplified 1.57 - 2.85 and 2.20 - 2.92 times compared to the ground motions. The precast specimens utilizing clamped mechanical splice showed ductile behavior with energy dissipation capacity against strong motion earthquakes.
최근 현장작업을 최소화할 수 있는 PC(Precast Concrete) 건축공법의 적용이 급속하게 활성화되고 있다. 그러나 PC 공법은 시공 중, 특히 부재간 일체화 이전에 구조적 성능을 발휘하기 어렵고 완공 후에도 접합부의 일체성을 확보하기 어려워 연쇄붕괴에 취약하다. PC 건축물에서는 다양한 PC 부재간 접합 상세가 존재하며, 국내외 구조/시공 상세가 현격히 다르다. 그러나 국내 PC 시스템의 시스템 과 상세 특성을 반영한 연쇄붕괴에 대한 연구는 매우 미비하다. 따라서, 본 연구에서는 국내에서 주로 사용하는 PC 구조시스템과 접 합부 구조/시공 상세를 조사 분석하였다. 이를 기반으로 국내에서 사용되는 전형적인 PC 시스템의 유형을 설정하고 상기 PC 시스템 의 연쇄붕괴방지성능을 평가하기 위하여 비선형 유한요소해석을 수행하였다. 해석결과를 바탕으로 국내에서 주로 사용된 PC 구조시 스템의 연쇄붕괴방지 성능을 평가하고 구조설계시 고려사항을 제안하였다.
본 논문에서는 지반경계조건의 설정이 프리캐스트 아치구조물의 폭발저항성능 평가에 미치는 영향을 수치해석적 기법을 사용하여 파악하고자 하였다. 지반경계조건은 고정조건과 PML(perfectly matcher layer)을 이용한 경계조건의 두 가지로 적용하였으며, 폭발하중은 대상 구조물의 설계하중보다 큰 하중을 사용하여 경계조건의 영향을 명확히 비교할 수 있도록 하였다. 폭발압력의 분포 및 경로, 구조물에 발생하는 변위, 콘크리트의 파쇄여부, 콘크리트 및 철근의 응력을 비교․분석하였으며, PML을 적용하였을 때 지반 경계면에서 발생하는 반사파를 효과적으로 제거할 수 있음을 확인하였다. 또한, 이로 인해 구조물 기초부의 변위가 감소하는 것으로 나타났다. 하지만, 콘크리트의 파쇄여부, 콘크리트 및 철근에 발생하는 응력을 포함한 전반적인 구조물의 거동에는 뚜렷한 차이가 발생하지 않았다. 따라서 방호시설의 설계를 목적으로 폭발시뮬레이션을 수행하는 경우에는 지반경계조건에 고정조건을 적용하였을 때 안전측의 결과를 얻을 수 있으며, 해석시간이 단축되는 이점도 있으므로 이러한 면을 종합적으로 고려하여 지반경계조건을 고정조건으로 적용하는 것이 합리적이라고 판단된다.
In this paper, a study on noise reduction characteristics of the precast floating track system, being developed as measures to mitigate noise and vibration of existing as well as constructing elevated railroad stations, is presented using numerical analysis. One of the most prominent sound analysis program, Virtual Lab., is utilized in investigating noise reduction performance of the precast floating track system, and structural velocity data, obtained from vibration analysis on a model-updated elevated railroad station considering vehicle-track-structure interaction, are used for the input of the sound analysis. The sound analysis is performed using the finite element method, and noise reduction performance before and after installing the precast floating track system is compared at three enclosed areas in the Daecheon Station, selected as a representative of elevated railroad stations in this nation. From the comparison result, it is seen that the precast floating track system can decrease noise by average of 5dB∼8dB when the Saemaeul train passing through the station and 10dB∼15dB when the KTX train passing through. Also, the noise reduction characteristics is different depending on the type of train and the distance from the track.
When reinforcing an existing reinforced concrete beam-column building with a precast concrete panel, special connection between the PC member and the RC member is required to solve the time dependent deformation of the RC member and to receive the large shear forces. The aim of this study is to obtain the shear strength of upper connection between the existing RC beam-column and infilled PC wall panels in experimentally and theoretically.
Thus, the static shear loading tests were conducted on the 6 specimens with the plate connection. Shear failure was resulted from the weakest portion of interior PC panel, exterior RC, and the connection, when the PC portion which located at the center of specimen was pulled upward from the bottom. T
he experimental result was compared with analytical result from ACI 318M-14 Chapter 17 for the shear strength of post-installed anchor and PCI Handbook 7th edition 6.8 Structural Steel Corbel (PCI Design Handbook 7th edition, 2010) for the strength of cast-in H-beam. The analytical and experimental results show final failure at the same location. The failure loading of experiment showed larger than average 6% to that of the analysis.
As a preparation of a design standard regarding road facilities, such as cantilever columns for traffic lights, optimum design and risk assessment for foundation of street lights on highways are proposed. The preliminary evaluation of optimization with reliability assessment resultantly makes it possible to reduce not only the duration of construction but the cost of construction as well. Ultimate limit states and constraints functions are selected for the sliding, overturning and settlement of the foundation under external loads from super and sub-structures itself. An example foundation under the super structure of height 12m, is optimized as 30% decreased embedded depth of foundation, in which as increasing the depth of embedded connection parts, the necessary depth of foundation is deceased. However, the optimum depths and the reliability indices are sensitively dependent with earth properties and dimensions of foundation.
The purpose of this study is to develop a new seismic resistant method by using precast concrete wall panels for existing low-rise, reinforced concrete beam-column buildings such as school buildings. Three quasi-static hysteresis loading tests were experimentally performed on one unreinforced beam-column specimen and two reinforced specimens with L-type precast wall panels. The results were analyzed to find that the specimen with anchored connection experienced shear failure, while the other specimen with steel plate connection principally manifested flexural failure. The ultimate strength of the specimens was determined to be the weaker of the shear strength of top connection and flexural strength at the critical section of precast panel. In this setup of L-type panel specimens, if a push loading is applied to the reinforced concrete column on one side and push the precast concrete panel, a pull loading from upper shear connection is to be applied to the other side of the top shear connection of precast panel. Since the composite flexural behavior of the two members govern the total behavior during the push loading process, the ultimate horizontal resistance of this specimen was not directly influenced by shear strength at the top connection of precast panel. However, the RC column and PC wall panel member mainly exhibited non-composite behavior during the pull loading process. The ultimate horizontal resistance was directly influenced by the shear strength of top connection because the pull loading from the beam applied directly to the upper shear connection. The analytical result for the internal shear resistance at the connection pursuant to the anchor shear design of ACI 318M-11 Appendix-D except for the equation to predict the concrete breakout failure strength at the concrete side, principally agreed with the experimental result based on the elastic analysis of Midas-Zen by using the largest loading from experiment.
This study aims at developing a new seismic resistant method by using precast concrete wall panels for existing low-rise, reinforced concrete beam-column buildings such as school buildings. Three quasi-static hysteresis loading tests were performed on one unreinforced beam-column specimen and two reinforced specimens with U-type precast wall panels. Top shear connection of the PC panel was required to show the composite strength of RC column and PC wall panel. However, the strength of the connection did not influence directly on the ultimate loading capacities of the specimens in the positive loading because the loaded RC column push the side of PC wall panel and it moved horizontally before the shear connector receive the concentrated shear force in the positive loading process. Under the positive loading sequence(push loading), the reinforced concrete column and PC panel showed flexural strength which is larger than 97% of the composite section because of the rigid binding at the top of precast panel. Similar load-deformation relationship and ultimated horizontal load capacities were shown in the test of PR1-LA and PR1-LP specimens because they have same section dimension and detail at the flexural critical section. An average of 4.7 times increase in the positive maximum loading(average 967kN) and 2.7 times increase in the negative maximum loading(average 592.5kN) had resulted from the test of seismic resistant specimens with anchored and welded steel plate connections than that of unreinforced beam-column specimen. The maximum drift ratios were also shown between 1.0% and 1.4%.
프리캐스트 콘크리트(P.C) 대형판 구조물은 일체식 현장타설 철근콘크리트 구조물에 비하여 보통 접합부에서 약한 강성을 가지고 있다. 그러나 일반적으로 실무에서 이러한 P.C대형판 구조물의 특성이 고려되지 않고 있으며 일체식 구조물에서와 동일한 해석모델을 사용하고 있는 실정이다. 따라서 이러한 모델을 사용하요 얻은 해석결과는 실제 P.C구조물에서의 발생하는 것들과 매우 상이할 수 있다. 본 연구에서는 이P.C구조물의 해석에 적합한 몇가지 유한요소모델을 시도해 봄으로써 수직접합부에 실제의 낮은 전단강성을 적용함으로 인해 발생하는 구조물에서의 힘과 응력분포 및 처짐의 변화를 관찰하여 보았다. 마지막으로 실부자들을 위해 수직접합부 전단강성의 영향을 감안한 단순화된 모델이 오차범위에 대한 이해를 전제로 하여 제안되고 있다.
현재 이루어지는 구조물의 안전진단과 성능에 대한 정밀검사는 기술자에 의해 수행되어 측정된 데이터가 경험적 판단에 의해 변화될 수 있는 수준에 머물러 있는 실정으로 본 연구에서는 프리캐스트 콘크리트 구조물을 실제 현장에서 이루어지는 설치방법과 동일하게 설치 후 기존 동적센서와 3축(3측(X, Y, Z축) 가속도 측정 센서 부착하여 손상정도에 따른 가속도 응답과 FFT분석 결과를 비교하여 P.C구조물의 안전진단에 대한 데이터의 불확실성에 대한 개선과 교체시기, 손상예측 등에 대한 기초자료로 활용하기 위함이다.
When reinforcing an existing reinforced concrete beam-column building with a precast concrete panel, special connection between the PC member and the RC member is required to solve the time dependent deformation of the RC member and to receive the large shear forces. The aim of this study is to obtain the shear strength of upper connection between the existing RC beam-column and infilled PC wall panels in experimentally and theoretically. Thus, the static shear loading tests were conducted on the 6 specimens with the plate connection. Shear failure was resulted from the weakest portion of interior PC panel, exterior RC, and the connection, when the PC portion which located at the center of specimen was pulled upward from the bottom. The experimental result was compared with analytical result from ACI 318M-14 Chapter 17 for the shear strength of post-installed anchor and PCI Handbook 7th edition 6.8 Structural Steel Corbel (PCI Design Handbook 7th edition, 2010) for the strength of cast-in H-beam. The analytical and experimental results show final failure at the same location. The failure loading of experiment showed larger than average 6% to that of the analysis.
When reinforcing an existing reinforced concrete beam-column building with a precast concrete panel, special connection between the PC member and the RC member is required to solve the time dependent deformation of the RC member and to receive the large shear forces. The aim of this study is to obtain the shear strength of upper connection between the existing RC beam-column and infilled PC wall panels in experimentally and theoretically. Thus, the static shear loading tests were conducted on the 6 specimens with the plate connection. Shear failure was resulted from the weakest portion of interior PC panel, exterior RC, and the connection, when the PC portion which located at the center of specimen was pulled upward from the bottom. The experimental result was compared with analytical result from ACI 318M-14 Chapter 17 for the shear strength of post-installed anchor and PCI Handbook 7th edition 6.8 Structural Steel Corbel (PCI Design Handbook 7th edition, 2010) for the strength of cast-in H-beam. The analytical and experimental results show final failure at the same location. The failure loading of experiment showed larger than average 6% to that of the analysis.
이 연구의 목표는 학교 건물과 같은 저층 보-기둥 철근콘크리트 구조 건물에서 프리캐스트 벽패널을 사용한 새로운 내진보강 방법 을 개발하는데 있다. 1개의 무 보강 보-기둥 실험체와 U형 PC 패널로 보강한 2개의 보강 보-기둥 실험체에 대한 정적 이력 하중실험을 진행하 였다. 앵커 접합부 실험체는 전단 파괴될 것으로 해석되었고 철판 용접 접합부 실험체는 휨 파괴할 것으로 예측되었다. 실험체의 종국 내력은 상부 접합부의 전단 내력과 PC 패널 절곡 부 휨 위험단면에서 휨 내력 중 약한 것으로 결정되었다. 이 실험체에서, 한쪽 RC기둥이 가 하중(미는 실험 하중)을 받아 PC 패널 부재를 밀게 된다면, 다른 쪽 내부 수직부재는 상부 전단 접합부로부터 부 하중(당기는 실험 하중)을 받게 되어있었 다. 가 하중을 받는 2개의 부재는 합성 휨 거동이 지배적이므로 합성단면의 휨 내력이 실험체의 최종 내력을 결정하게 되지만, 이 경우 최종 내 력에 대하여 상부 전단 접합부 강도의 직접적인 영향은 없다고 볼 수 있다. 그러나 부 하중(당기는 하중)을 받는 RC 기둥과 PC 패널 부재는 비 합성 거동이 지배적이고 실험체의 최종 내력은 상부 전단 접합부 전단내력의 크기에서 직접 영향을 받는 것으로 파악되었다. ACI 318M-11 Appendix-D 앵커 전단설계에 기초한 전단내력 그리고 실험에서 얻은 최대하중을 적용하여 마이다스 젠 탄성설계에 의하여 계산한 전단 외력 에 대한 비교 해석결과는 실험결과와 일치하는 해석결과를 보여주었다.
이 연구의 목표는 학교 건물과 같은 저층 보-기둥 철근콘크리트 구조 건물에서 프리캐스트 벽패널을 사용한 새로운 내진보강 방법을 개발하는 것이다. 1개의 무 보강 보-기둥 실험체와 U형 PC 벽패널로 보강한 2개의 보강 보-기둥 실험체에 대한 정적 이력 하중실험을 진행하였다.
앵커접합 PR1-UA 실험체와 철판접합 PR1-UP 실험체는 무 보강 실험체보다 평균 2.8배(평균 591.8 kN)의 강도 증가를 보여 주었다. 최대 변위비도 1.4%에서 2.7%사이 값을 보여주었다. RC 골조 우측 상단에서 좌측방향으로 가력 할 때 우측에 있는 RC 기둥과 보강 PC 패널의 수직 요소는 완전 합성상태로 가정하였고, 좌측에 있는 RC 기둥과 PC 패널은 완전 비 합성 거동하는 것으로 가정하여 해석한 결과 전체적인 휨 거동은 실험 결과와 대체적으로 부합하는 것으로 판단되었다.
This paper introduce a calculation method for the length of steel and rebar due to load onto the member in large scale structure using precast composite structure system. As result, cost effectiveness of members in large scale structure is procurable by utilizing steel and rebar economically.
프리캐스트 콘크리트 모듈 단위로 시공되는 플로팅 구조물의 거동은 콘크리트 모듈 접합부의 거동과 밀접한 연관성을 갖는다. 극한하중조건에서의 플로팅 구조물의 구조적 거동을 정확히 예측하기 위해서 모듈 접합부의 구조거동 실험연구를 수행하였다. 모듈 접합부 전단키의 전단거동, 전단강도 및 균열 패턴을 파악하였다. 실험결과는 전단키의 경사각도가 증가함에 따라 전단강도가 증가하는 것을 나타낸다. 또한, 구속응력이 증가함에 따라 전단키의 전단강도가 증가한다. 실험결과와 AASHTO 제안식에 의한 예측값을 비교하였으며, AASHTO 제안식은 실험값을 과소평가하고 있다.