검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 13

        1.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
        4,000원
        2.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        국내의 공공공사는 국가・지방자치단체・정부 기관이 건축주가 되어 시행하거 나 지방자치단체의 보조로 시행하는 공공 토목건축 공사를 말한다. 이러한 공 공공사는 「국가를 당사자로 하는 계약에 관한 법률」로써 계약에 관한 기본적 인 사항을 정하여 원활한 계약업무를 수행할 수 있도록 하고 있다. 한편 공공 공사 수행을 위해서는 용지가 필요한 바 「공익사업을 위한 토지 등의 취득 및 보상에 관한 법률」에 공사용지 확보는 사업시행자가 하도록 명시하고 있고, 공 사계약일반조건에서도 공사용지 확보와 관련하여 발주기관은 계약상대자가 공사의 수행에 필요로 하는 날까지 공사용지를 확보하여 계약상대자에게 인도 하도록 규정하고 있다 그러나 실제 고속도로 공사현장에서는 공사용지 확보가 공사수행을 위해 필요 한 날까지 제대로 이루어지지 않는 경우가 많아 준공기한 준수를 위해 돌관공 사가 빈번하게 이루어지는 등 현실적인 어려움이 자주 발생하고 있다. 따라서, 본고에서는 관계법령 및 공사계약일반조건에서 규정한 공사용지 확보 관련규정에 대한 문제점을 제시하고 이에 대한 개선안을 제시함으로써 향후 공공공사를 시행함에 있어 공사용지 확보와 관련하여 발주기관 및 계약상대자 가 겪는 어려움을 해소하는데 일조하고자 한다.
        7,800원
        4.
        2022.06 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        일반적으로 과거 건설공사는 그동안 축적된 기술기준과 경험 그리고 성과를 바탕으로 한 설계와 시공단계에서부터 준공단계까지의 사업관리를 통해 그 품질 향상을 도모해왔다. 그러나 최근 제4차 산업혁명 등 환경변화의 바람은 건설 산업에 있어 기술적 측면은 물론 관리적 측면에 대해서도 많은 영향을 미치고 있다. 이러한 상황에서 건설산업의 각 분야에서 요구되는 생산성 향상, 공정거래 구현 등에 대한 사회적 기대는 건설산업에 대한 변화의 모티브로 작용하고 있다. 정부도 역시 이와 같은 시대적 변화에 대응코자 관계법령 등 제반 규정을 정비 하는데 지속적인 노력을 기울이고 있는 상황에서, 본 연구는 건설사업관리와 관련한 법률규정을 기준으로 품질제고, 비용절감, 공기단축 등을 효율적으로 관리하는 방안에 대해 검토하였다. 여러가지 관리방안 중에 본 논문은 발주자와 관련업계 등에게 가장 민감하게 작용하고 있고 상호간 이해의 충돌이 빈번한 공공부문측면에서 공동주택 건설사업관리 용역대가산정에 대한 제반문제 등을 살펴보고 이에 대한 개선방안을 도출하고자 연구를 진행하였다.
        9,900원
        5.
        2022.06 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        대한민국은 선진국이지만, 건설공사현장에서는 여전히 대형건설사고가 끊임없이 발생하고 있다. 이에 본연구는 건설안전의 예방을 기술적 접근보다는 법사회 학적(철학적) 사유 방식을 선택하여 ‘법사회학 이론적 차원’과 ‘방법론적 차원’ 으로 나누어 접근하였다. 법사회학 이론적 접근 방법에는 ‘한나 아렌트’, ‘라깡’, ‘바우만’, ‘동형화 이론’, ‘지젝’이 주장하는 이론을 적용하였고, 방법론적 차원 으로는 법사회학적 이론 차원에서 초래된 위험유형사례를 상호 대비하여 법사 회학적 이론과 사례, 판례, 통계분석을 참고하여 건설대형 사고가 법사회학 이론과 밀접한 연관성이 있는 것을 입증하였다.
        8,600원
        6.
        2018.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS: This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT’s five regional offices. RESULTS: This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: “the preparation of electronic design documents output delivery system improvement measures including inspection and delivery,”“preparation of guidelines, systems, etc., concerning electronic design documents,”“preparation of improvement measures for the construction project management system and electronic design document support tools”, and “linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments.” CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.
        4,200원
        7.
        2017.06 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        공공 건설공사 수행 중 계약기간내 공사를 완성하지 못하고 공사기간이 연장된 경우 그 지 연 사유에 대한 귀책과 추가비용 발생의 부담주체를 놓고 계약당사자간에 논란과 분쟁이 심화되고 있다. 건설공사에 있어서 공기지연에 따른 전체 공사기간이 연장된 경우 그 원인 제공을 누가 했 는지에 대한 책임을 분명히 할 필요가 있다. 공기지연 원인의 책임구분의 결과는 분명 일 방의 권리와 타방의 손해로 직결되고 명확한 책임구분이 되지 않는 경우 분쟁이 발생하게 되며 결과적으로 어느 일방은 정당하지 않은 손해를 입게 된다. 계약법상 공사기간의 연장은 계약상대자에게 책임이 있는 사유로 인해 약정한 계약기간 내 에 공사를 완성할 수 없는 경우와, 발주기관의 사정에 의해서 공사가 연장되는 경우가 대 부분을 차지하고 있다. 일반적으로 공기지연 사건이 발생한 경우 클레임을 제기하는 주체에 그 입증책임이 있는데 보통 계약상대자인 건설사가 주장·입증을 하게 된다. 이때 이를 증명 입증시 공식적인 문서 즉, 채무자에게 채무가 있고 이를 이행하지 않는 사실과 채무자에게 귀책사유가 있는 사실, 그로 인해 일정한 손해가 발생한 사실에 대한 근거를 함께 제시하여 명확히 밝혀야 한다. 또한 그 입증 결과에 따른 손해배상으로서 계약상대자인 시공사의 책임없는 사유로 인한 계약기간의 연장이 입증되면 발주기관에 연장기간 동안 발생된 ‘실비’ 보상 요구와 계약금 액 증액 청구 등의 행위가 가능함을 명심해야 한다. 하지만, 공기 연장으로 인해 발생한 손 실에 대한 보상이 가능한지의 여부는 계약당사자가 계약 문서를 통해 어떻게 합의 하였는 지에 따라 결정될 것이지만, 공기지연에 대한 귀책이 발주자나 시공자 모두에게 없는 경우 라면 원칙적으로 공기 연장은 가능하나 이에 대한 보상은 가능하지 않은 것으로 이해하여 야 한다
        5,700원
        8.
        2013.12 구독 인증기관 무료, 개인회원 유료
        The Ministry of National Defense designated Gangjeong Village located on the southern shores of Jeju Island as the site for the construction of a naval base in 2007. Since then, the decision has brought about severe confict among the people concerned, Navy and Jeju local government. This paper examines the issue of public interest judgment in case of public confict such as Jeju naval base construction. The fundamentals of the conflict in the case come from the justification on the part of the government’s decision. In the case of the navy, through the construction of its base, it purports the abstract concept of national security as its goal. On the other hand, it proceeded with its goal without suffcient evidence and justifcation as to why there is a need for a naval base in Jeju and why the ideal site has to be Gangjeong Village. The government (navy) is looking at the construction of the base from a national project point of view as a policy while the residents are approaching the problem from the matter of principle of community interest as a whole. This forms the fundamentals of confict and ultimately has resulted in a practical failure and postponement in the execution of the government policy. Following the Flathman’s argument, this paper has the perspective that securing justification in a public confict is the fundamental element in judging whether it is for the public interest or not. In order to do this, this paper focuses on the evidence and validity of various arguments surrounding the naval base construction and through them, look closely into the cause and effect of public confict and ultimately the alternative meaning of public interest. In addition, it seeks to point out the limits of policy approaches and conficts that appear due to differences in opinions regarding public interest when dealing with public issues that are lacking in values.
        4,600원
        9.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.
        4,000원
        10.
        2012.03 구독 인증기관 무료, 개인회원 유료
        Recent projects for transferring Public Office buildings and estimation of appropriate construction expense are highly important for both government and construction firms. Moreover, estimation and management of construction expense can be regarded as extremely important duties for effective execution of a national budget as nation’s finance is invested in the Public office building projects progressed by the government. To progress one project for Public office building, not only the organization demanding the project but also an investment screening organization, a budget-managing organization, a feasibility assessment institution and many other related organizations participate in the project and a lot of decisions arisen from the project operation are made on the basis of construction expenses calculated for relevant stages. And estimation of rational construction expense is also critical for designers in order to create design within the fixed budget simultaneously with securing the quality and efficiency of structures to the maximum. Therefore this research suggested an improvement process to analyze problems in current construction expense management process and to administer the construction expenses effectively.
        4,000원
        11.
        2011.07 구독 인증기관 무료, 개인회원 유료
        민간업체의 기술개발의욕을 고취시킴으로써 국내 건설기술의 발전을 도모하고 국가 경쟁력을 제고하기 위하여 건설기술관리법에 의하여 건설신기술지정제도를 운영하고 있다. 해당 법에서는 신기술로 지정받은 기술에 대하여는 일정기간동안의 해당기술을 보호할 수 있도록 하고 있으며, 해당 기술의 사용자에게 기술사용료를 요구할 수 있도록 규정하고 있다. 이처럼 건설 신기술 지정제도는 특허제도와 유사한 형태로 기술을 보호, 활용할 수 있는 제도로 운영되고, 해당 기술의 설계 반영시에는 그 기술의 사용료를 일정 요율로 책정하여 운영토록하고 있다. 본 연구에서는 건설신기술 지정제도와 특허제도와의 차이점을 살펴보고, 표준 설정에서 활용되고 있는 RAND 조건과 전통적 경제학에서의 가격차별 유형을 고려하여, 건설신기술지정제도의 운영 취지에 맞는 운영 방안을 제시하고자 한다.
        4,600원
        12.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        13.
        2018.04 서비스 종료(열람 제한)
        This study is the result of the survey on perception and anxiety of high - rise buildings in the general public. As a result of the survey, there was insufficient change in awareness before the construction of high - rise buildings such as landmarks was insufficient (before 2015). However, half of the citizens who felt uneasy that high-rise buildings were likely to collapse due to external influences were close. The anxiety was mainly due to the information of the press or the Internet. It is thought that the cause of anxiety comes from touching negative opinions about the high-rise buildings.