검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 19

        5.
        2023.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This paper proposes an artificial neural network (ANN)-based real-time traffic signal time design model using real-time field data available at intersections equipped with smart intersections. The proposed model generates suitable traffic signal timings for the next cycle, which are assumed to be near the optimal values based on a set of counted directional real-time traffic volumes. METHODS : A training dataset of optimal traffic signal timing data was prepared through the CORSIM Optimal Signal Timing program developed for this study to find the best signal timings, minimizing intersection control delays estimated with CORSIM and a heuristic searching method. The proposed traffic signal timing design model was developed using a training dataset and an ANN learning process. To determine the difference between the traditional pre-time model primarily used in practice and the proposed model, a comparison test was conducted with historical data obtained for a month at a specific intersection in Uiwang, Korea. RESULTS : The test results revealed that the proposed method could reduce control delays for most of the day compared to the existing methods, excluding the peak hour periods when control delays were similar. This is because existing methods focus only on peak times in practice. CONCLUSIONS : The results indicate that the proposed method enhances the performance of traffic signal systems because it rapidly provides alternatives for all-day cycle periods. This would also reduce the management cost (repeated field data collection) required to increase the performance to that level. A robust traffic-signal timing design model (e.g., ANN) is required to handle various combinations of directional demands.
        4,000원
        6.
        2023.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        기상불량으로 인해 발생하고 있는 해양사고 중 해무 발생에 따른 시계제한은 선박의 좌초, 선저 파손 등의 사고를 유발하는 것과 동시에 사고에 따른 인명피해를 동시에 수반하고 있으며 이는 매년 지속적으로 발생하고 있다. 또한 해상에서의 저시정은 지역간 국소적으로 차이가 존재하는 경우에도 일괄적으로 여객선에 대한 운항 지연 및 통제 조치를 하고 있어 섬주민들의 교통수단 이용에 상당 한 불편을 초래하는 등의 사회적 문제로 대두되고 있다. 더욱이 이와 같은 조치는 지역적 편차나 사람마다 관측의 판단 기준이 상이하여 이를 객관적으로 정량화하지 못하고 있어 더욱 문제가 심화되고 있는 실정이다. 현재 각 항만의 VTS에서는 시정거리가 1km 미만인 경우 선박의 운항을 통제하고 있으며, 이 경우 저시정에 따른 해무 가시거리를 시정계 혹은 육안에 의한 목측(目測)에 의존하고 있을 정도로 객관적인 데이터 수집을 통한 평가에 있어서는 한계가 있다. 정부에서는 이와 같은 해양교통안전 저해요소를 해결하기 위한 일환으로 해 무 탐지 및 예측을 위한 해양기상신호표지 및 해상안개관측망을 구축하여 운용하고 있으나, 국지적으로 발생하는 해무를 관측하기 위한 시스템은 매우 부족한 현실적 어려움에 놓여있다. 이에 따라 본 논문에서는 해상에서의 저시정으로 인해 발생하고 있는 여러 사회적 문 제를 해결하기 위한 국내․외 정책동향에 대해 살펴보고, 이와 관련한 일반국민 및 현장 이해관계자의 인식 정도를 조사․분석하여 해무 에 따른 해상교통안전을 확보하기 위한 정부지원(해무 탐지 및 예측 기술을 기반으로 한 해상교통운영 체계 개발 등)의 필요성에 대한 기 초자료를 제공하고자 한다. 또한 이는 궁극적으로 해무로 인해 발생할 수 있는 해상안전 위험요소를 사전에 차단함으로써 보다 안정된 해상교통운영체계를 마련하는데 그 목적을 두고 있다.
        4,000원
        9.
        2020.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : In this paper, pedestrian-oriented time assured traffic operation (POTATO), adopted in Korea at a single crossing pedestrianoriented operating area, is explored and applied to a simulation experiment and test site to verify the operation efficiency. METHODS : Three candidate plans are presented as a method to operate pedestrian-oriented signal operations that can overcome the restrictions on signal controllers in Korea. The selected POTATO and TOD signal operations were compared and analyzed. The delay and pedestrian queues, present length, and number of times were used as comparative indices. RESULTS : Scenario-specific simulations confirmed that the delay, compared to TOD signal operation, was reduced by up to 5 s/ped depending on the vehicle traffic volume and the number of pedestrians. For the vehicle delay, the results increased up to 8.99 s/veh, depending on the traffic volume of the vehicles and pedestrians. As a result of the test site operation, POTATO operation improved by 5.12 s/ped (approximately 46.69% improvement) compared to TOD operation in the hours commuting to school and by 2.84 s/ped in the hours commuting from school (approximately 51.13% improvement). In case of vehicle delay, the delay increased by 2.35 s/veh (approximately 64.39%) in the hours commuting to school and 1.20 s/veh (approximately 21.11%) in the hours commuting from school compared to the TOD operation. CONCLUSIONS : Through simulations and test site pilot operation verifications, the effects of pedestrian delay improvement were more positive if POTATO proposed in this study was low in vehicle traffic.
        4,000원
        10.
        2020.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES: This paper presents the development and evaluation of the smart hardware-in-the-loop systems (SMART-HILS) that evaluate traffic signal operations of a new real-time traffic signal control system called SMART SIGNAL at the traffic management center (TMC) level. METHODS: The layouts of the hardware and software components of the SMART-HILS were introduced in this study and its performance was tested using real-time traffic signal operation algorithms embedded in the SMART SIGNAL control server by utilizing the VISSIM simulation model. In this study, the SMART-HILS management software was developed using .NET programming language. Fewer random seed numbers were used for the test scenarios by conducting statistical tests to address the shortcomings of a longer time due to the adoption of the simulation time as the real-time by the TMC server. RESULTS : It was determined that SMART-HILS can communicate with TMC and VISSIM for both upload and download directions within acceptable time constraints and evaluate new design algorithms for traffic signal timing. CONCLUSIONS : In practice, traffic engineers can utilize SMART-HILS for testing the traffic signal operation alternatives before their selection and implementation. This application could increase the productivity of traffic signal operation.
        4,000원
        12.
        2016.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        광양만 교통안전특정해역은 3개 항로(입항항로, 출항항로, 깊은수심항로)로 구분되어 있으나 입항항로에 삼여 암초와 인공어초의 부설로 선박들이 이 항로를 이용하지 못하고 있다. 삼여 암초와 인공어초 제거에 대한 문제점은 선박운항자뿐만 아니라 항만관계자를 통해 지속적으로 제기되어 왔다. 이 연구는 특정해역 내에 있는 삼여 암초를 제거 전과 후에 대한 안전성 평가 및 항로운영방안에 대한 것으로 선박운항자 위험도 기반 모델을 이용한 해상교통류 시뮬레이션을 수행하였다. 실험결과, 장래의 선박교통량이 현재와 같고 2개 항로를 3개 항로로 운영한다고 가정할 때, 46.4 %(50,000 DWT 이상 선박은 깊은수심항로를 이용)와 57.1 %(10,000 DWT 이상 선박은 깊은수심항로를 이용) 위험 감소 효과가 있는 것으로 나타났다. 또한 교통량이 현재와 같은 상황에서는 50,000 DWT 이상 선박을 깊은수심항로로 통항하게 하는 것이 위험도 분산 측면에서 효과적임을 알 수 있었다. 한편 선박교통량이 현재보다 1.5배 증가한 상황에서는 10,000 DWT 이상 선박을 깊은수심항로로 유도하는 것이 더 효과적이었다. 이 연구는 선박운항자 위험도 기반 모델을 이용한 분석 결과로, 삼여 암초와 인공어초 제거 등에 필요한 비용 대비 효과를 검토한 것이 아님을 밟혀둔다. 본 연구의 결과는 삼여 암초 제거 후 항로 설정과 항로 운영 방안(특히 깊은수심항로 통항선박 제한) 등에 활용이 가능할 것으로 기대된다.
        4,000원
        15.
        2012.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        회전교차로(roundabout)는 용량 이하의 상태에서 접근로별 교통류가 균등할 경우 기존 신호교차로에 비해 운영효율성이 증대되나 토지이용변화로 교통량이 증가하면서 접근로별 교통류가 불균등 해질 경우(차로 당 450대/시 이상) 주접근로에서 회전교차로 내부로의 진입이 어려워져 효율성이 떨어지게 된다. 본 연구에서는 1차로형 4지 회전교차로를 대상으로 회전교차로 설치이후 교통량 증가로 신호교차로 설치에 대한 재검토를 하기 전에 회전교차로를 효율적으로 운영할 수 있는 Signal Metering 전환기준 및 운영방법을 제시하고 효과분석(지체 및 대기행렬)은 SIDRA를 활용하였다. 본 연구결과 총 진입교통량이 1,800~2,000pcu/시 이고 주접근로의 진입교통량비가 60~70%일 때 지체는 30~40% 그리고 대기행렬은 30~60% 감소하였다. 또한 주접근로에 가장 인접한 부접근로에 Metered Approach를 설치하고 한 쌍(pair)으로 묶어서 운영하는 것이 효과적인 것으로 분석되었다.
        4,000원
        17.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        1996년 천호대로 중앙버스전용차로가 시행된 이후 2008년 까지 8개 구간이 운영되고 있다. 그러나 중앙버스전용차로의 시행에 따른 직 간접적 영향권 내의 도로교통량 변화는 보고되지 않고 있다. 따라서 본 연구에서는 2004년 7월에 동시 개통된 3개 구간에 대한 사전 사후 도로교통량 변화를 분석하였다. 분석결과, 중앙버스전용차로 구간의 교통량은 중앙버스전용차로 개통 후(2004년 11월) 24.7%로 급격히 감소한 후, 개통 후 1년(2005년 11월) 1.4%로 안정화 된 것으로 분석되었다. 인접 우회도로 교통량은 개통 후(2004년 11월) 2.9% 감소한 후, 개통 후 1년(2005년 11월) 0.3%로 미비하게 증가하였다. 측정오차(±5%)를 고려하면 중앙버스전용차로 교통수요는 안정화 단계에 들어섰으며, 자동차 수요가 인접지역으로 우회하기 보다는 타 수단으로 전환된 것으로 판단된다.
        4,000원
        18.
        2007.12 KCI 등재 서비스 종료(열람 제한)
        이 연구는 해상교통안전시설에 관한 운영효과를 분석한다. 해상교통안전시설의 운영효과는 크게 안전편익, 수송편익 그리고 기타편익으로 나눌 수 있다. 안전편익은 해상교통안전시설을 설치 및 운영함으로써 해양사고가 감소됨에 따른 해상교통의 손실회피비용으로 산출된다. 이를 위하여 각 해당 시설에 대한 해양사고 감소율을 산정하고, 손실회피비용의 세부 모델을 구축한다. 또한 이에 대한 각 변수를 정의하고 계산식을 제시한다. 이 모델을 목포청의 항로표지집약관리시스템에 적용하여 안전편익을 산출하였다.
        19.
        2005.02 KCI 등재 서비스 종료(열람 제한)
        인천항의 송도 신도시와 영종도 인천국제공항을 이어주는 제2연륙교 건설사업이 1999년 민간제안사업으로 정부에 제안되어 3차례에 걸친 통항 안전성 연구에도 불구하고 적정 교각폭이 결정되지 못하고 있다. 따라서 본 연구에서는 인천항의 제2연륙교 설치시 왕복통항이가능한 교각폭으로 설계한 경우를 대비하여 10,000G/T이상 선박이 일방통항으로 항로폭을 설계할 경우의 항만운용효율 변화 및 경제성을 분석 하고자 한다. 연구결과, 제2연륙교 항로의 왕복통항대비 10,000G/T 이상 일방통항시 제2연륙교 주경간 항로에서의 총대기시간은 2011년도에 20,362시간, 2020년에는 24,544시간으로 평가되었다. 따라서 10,000G/T이상 선박의 일방통항에 따른 체선·체화비용으로 2011년에 약 197억원, 2020년에는 약 233억원이 될 것으로 추정되므로 제2연륙교가 완공될 2008년부터 2040년까지의 33년간의 총 체선·체화비용은 약 7,689억원으로 평가되었다.