        21.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users’ rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI’s long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.
        4,000원
        22.
        2016.06 구독 인증기관·개인회원 무료
        도로 포장 및 교면 포장의 노후화로 인해 이에 대한 보수는 지속적으로 이루어지고 있고 매년 증가하고 있다. 도로 및 교량의 유지보수는 교통량이 많은 낮 시간보다는 교통량이 상대적으로 적은 야간에 주로 수행되고, 교통량이 다시 많아지는 시간 이전에 신속히 마무리하고 교통개방을 해야 하기 때문에 노무자 의 인력관리 및 안전관리를 체계적으로 수행하기가 쉽지 않다. 본 연구는 주로 야간에 주어진 시간 내에 신속히 작업을 수행해야하는 유지보수공정에 대하여 노무자 의 업무 및 안전을 체계적으로 관리하기 위해 실시간 위치정보 시스템을 구축하고, 현장에 시범 적용하여 그 가능성을 살펴보았다. 유지보수 현장에 총 8개의 고정식 노드를 설치하고 작업자의 안전모에 이동식 노드를 설치하여 현장에서 노무자의 작업 패턴을 충분히 확인할 수 있었다. 그리고 시스템 상에서 현장을 1m 격자로 구분하고 위험지역을 시스템 상에서 부여하여 노무자가 위험지역을 진입할 경우 이를 실시간 으로 확인하고 위험여부를 통보 가능함을 확인하였다.
        23.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The incidents related to transporting hazardous materials may cause serious impacts on neighborhood and surrounding areas. It is essential to have a real-time safe management system for incidents prevention of transporting hazardous materials. Currently, the system is not integrated into one channel, which makes it difficult to control an incidents response. Another problem is that event status is not appropriately shared among authorities having responsibilities taking down the incidents. This paper investigates previous studies covering the real-time safety management system for hazard material transports and suggests an integrated management system that helps communicate effectively and promptly.
        4,000원
        24.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Depending on the growth of the construction industry, size of construction sites are becoming enlarged, and construction work is becoming diversified as well. However, this increases risks of safety accidents. In order to alleviate this problem, some large construction companies have implemented a Safety Patrol Management System (SPMS) in order to reduce accidents on construction sites. Aimed at the construction sites where SPMS has been applied, the purpose of this research is to calculate the proper number of SPMS safety mangers by comparing and contrasting the number of safety managers per person for each site with different sizes and the converted accident ratio. In addition, we also aim to calculate the adequate amount of SPMS safety management costs compared to the total amount of construction expenses required once SPMS is introduced.
        4,000원
        27.
        2015.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Continued efforts to build up Safety Management System(SMS) and to improve its efficiency in airports, to which customers have direct access, are taken for granted due to continuous development of the aviation industry in both quantity and quality and rapid growth of air transportation market. This thesis proposed efficient operation methods of SMS for domestic airport organizations including Incheon International Airport(IIA), the largest airport in South Korea, aiming at strengthening aviation safety from the perspective of airport operators who play a pivotal role in service provider SMS. Those are consolidation of the existing safety management organizations and various improvements to promote voluntary incident reporting system. To draw a proposal for the improvements, conducted a research on domestic safety management status, carried out an analysis on operating conditions and did a research on ICAO regulations, domestic legal system as well as statistics data. Relevant studies and researches were also gathered and analyzed. A search for further improvements can also help increase operational efficiency and promoting a higher-level of safety awareness among operators can establish mature safety culture at airports.
        4,000원
        28.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        While Korea had achieved radical growth of construction industry, it also had accumulated problems in material, human and economical loss due to its low quality of safety level. Therefore, not only enterprises but also the nation is putting in a great deal of efforts for construction safety. However, its effect is not satisfiable. This research aims for change of construction cite by introduction of professional Safety Patrol Management System(SPMS) and consideration of its necessity. To consideration of its necessity, we compared and anaylzed average numbers of indicated dangers and safety accident incidences in each construction cites and we researched changes in worker's safety sense. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.
        4,000원
        31.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        A research was conducted on Seoul regional elementary, middle, and high school nutritionists to study about their perception of HACCP control standards & performance conditions and sanitation & safety inspection, to seek for more efficient methods of school meals' sanitation system settlement. All surveys were distributed and collected via email. A total of 305 survey papers were collected, and out of these, 300 school results were analyzed. As for CCP 1 performance conditions, 43.3% of the nutritionist put emphasis on temperature control for cooking duration and 71.0% said that they manage both temperature and PHF food control. In CCP 2 stage, 65.8% of the nutritionists maintained the food's temperature, and 56.7% documented the recordings after cooking. A total of 79.3% of the schools scored above 90 points on school meal sanitation & safety inspection, 3.72 points on necessity for revisions, 3.38 points on objectivity, and 3.34 points on reliability. As for these results, a clear CCP control criteria as well as training must be set. Also, because the necessity of revision for sanitation & safety inspection is higher than reliability and objectivity, appropriate complementary measures must be taken.
        4,200원
        32.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The disaster and safety accidents in any construction site occur inevitably. Since the on-site disaster and accident occurrence became one of major concerning factors in construction site, architects & building executers have been flooded with safety management advices. The purpose of this paper is to survey and analyze the effect of the application of Safety Patrol Management System(SPMS) upon the reduction of disaster & accident occurrences in construction site. In order to estimate and reduce the disaster and accident ratio in construction site, various surveyed data has been analysed. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.
        4,000원
        33.
        2014.06 구독 인증기관 무료, 개인회원 유료
        우이산호와 같이 특수 해양시설물인 유류터미널과 선박 간의 해양사고는 대규모 해양오염 발생으로 이어져 해당 기업에 심각한 손실을 끼치며 대형 환경오염을 수반한다. 본 연구는 대상선박을 실시간 모니터링하고 사고위험을 사전에 식별하여 항만시설물을 포함한 단계별 비상 대응이 가능한 유류부두 안전관리 종합정보시스템 개발을 제안한다. 해당 시스템은 선체, 선박운항자 및 유류터미널 시설물까지 유기적으로 통합된 능동적인 안전감시시스템으로 해상교통 모니터링과..
        3,000원
        34.
        2013.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Workers are avoiding production/manufacturing sites due to the poor working environment and concern over safety. Small and medium-sized businesses introduce new equipment to secure safety in the production site or ensure effective process management by introducing the real-time monitoring technique for existing equipment. The importance of real-time monitoring of equipment and process in the production site can also be found in the ANSI/ISA-195 model. Note, however, that most production sites still use paper-based work slip as a process management technique. Data reliability may deteriorate because information on the present condition of the production site cannot be collected/analyzed properly due to manual data writing by the worker. This paper introduces the monitoring and process management technique based on a direct facility interface to secure safety in the field by improving the poor working environment and enhance there liability and real-time characteristics of the production data. Since the data is collected from equipment in real-time directly through the SIB-based interface and PLC-based interface, problems associated with workers’ manual data input are expected to be solved; safety can also be improved by enhancing workers’ attention to work by minimizing workers’ injuries and disruption.
        4,000원
        37.
        2013.11 구독 인증기관 무료, 개인회원 유료
        오늘날 기술의 발전으로 시스템들은 점차 대형화 복잡화 되어가고 있다. 이처럼 점차 대형화 복잡화 되어가고 있는 시스템들은 더욱 커진 사고 및 고장에 대한 위험을 내재하게 된다. 또한 대형 복합 시스템에서 발생하는 사고 및 고장은 바로 큰 재산피해나 인명피해와 직결 될 수 있다. 따라서 체계적인 안전관리의 필요성이 점차 커지고 있다. 이에 대응하여 철도, 항공, 해양 등의 산업에서는 각 산업에 적합한 안전관리체계를 수립하려 노력하고 있으며, 표준 및 매뉴얼을 제정하여 보급에 앞장서고 있다. 또한 시스템에서 전장품 및 소프트웨어가 차지하는 비중이 커지면서 기능안전이 안전분야의 이슈가 되고 있다. 이에 따라 IEC 61508, ISO 26262, IEC 61511 등 기능안전 관련 표준들이 제정되어 기능안전을 달성하기 위한 기반을 제공하고 있다. 한편 국내 철도산업에서도 철도안전법의 재정을 기점을 철도 산업전반에 걸쳐 많은 환경변화가 이뤄지고 있고 이에 대응하기 위해 철도 안전시스템을 바탕으로 한 안전관리체계를 구축하였다. 한편 다양한 운영체계를 갖고 있는 철도시설 및 운영기관이 존재하는 국가 철도 안전관리체계의 안전규제를 체계화하기 위해서는 체계적인 요구사항의 분석에 따른 시스템 아키텍처의 설정이 요구되고 있다. 이러한 아키텍처의 설정은 현재에 대한 분석과 미래의 철도안전시스템의 특성을 구조화하여 향후 비전을 프레임워크로 표현함으로서 구현이 가능해진다. 본 논문에서는 현재의 안전관리체계의 도입 배경 및 도입 현황에 대해서 분석하고, 최근 기존의 안전관리체계와 더불어 최근에 안전분야에서 이슈가 되고 있는 기능안전 표준을 반영한 안전관리체계의 구축을 위해 안전관리체계에 대한 아키텍처를 구현하고자 하며 이때, 모델링을 바탕으로 한 접근을 제시한다.
        4,000원
        39.
        2013.04 구독 인증기관 무료, 개인회원 유료
        오늘날 기술의 발전으로 시스템들은 점차 대형화 복잡화 되어가고 있다. 이처럼 점차 대형화 복잡화 되어가고 있는 시스템들은 더욱 커진 사고 및 고장에 대한 위험을 내재하게 된다. 또한 대형 복합 시스템에서 발생하는 사고 및 고장은 바로 큰 재산피해나 인명피해와 직결 될 수 있다. 따라서 체계적인 안전관리의 필요성이 점차 커지고 있다[1]. 이에 대응하여 철도, 항공, 해양 등의 산업에서는 각 산업에 적합한 안전관리체계를 수립하려 노력하고 있으며, 표준 및 매뉴얼을 제정하여 보급에 앞장서고 있다. 국내 철도산업에서도 철도안전법의 재정을 기점을 철도 산업전반에 걸쳐 많은 환경변화가 이뤄지고 있고 이에 대응하기 위해 철도 안전시스템을 바탕으로 한 안전관리체계를 구축하였다. 한편 다양한 운영체계를 갖고 있는 철도시설 및 운영기관이 존재하는 국가 철도 안전관리체계의 안전규제를 체계화하기 위해서는 체계적인 요구사항의 분석에 따른 시스템 아키텍처의 설정이 요구되고 있다. 이러한 아키텍처의 설정은 현재에 대한 분석과 미래의 철도안전시스템의 특성을 구조화하여 향후 비전을 프레임워크로 표현함으로서 구현이 가능해진다. 본 논문에서는 현재의 안전관리체계의 도입 배경 및 도입 현황에 대해서 분석하고, 안전관리의 방식의 변화에 적절히 대응하는 안전관리체계의 구축을 위해 안전관리체계에 대한 아키텍처를 구현하고자 하며 이때, 모델링을 바탕으로 한 접근을 제시한다.
        4,000원
        40.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.
        4,000원