검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 24

        1.
        2024.03 구독 인증기관 무료, 개인회원 유료
        4,000원
        3.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.
        4,000원
        5.
        2023.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        국내의 공공공사는 국가・지방자치단체・정부 기관이 건축주가 되어 시행하거 나 지방자치단체의 보조로 시행하는 공공 토목건축 공사를 말한다. 이러한 공 공공사는 「국가를 당사자로 하는 계약에 관한 법률」로써 계약에 관한 기본적 인 사항을 정하여 원활한 계약업무를 수행할 수 있도록 하고 있다. 한편 공공 공사 수행을 위해서는 용지가 필요한 바 「공익사업을 위한 토지 등의 취득 및 보상에 관한 법률」에 공사용지 확보는 사업시행자가 하도록 명시하고 있고, 공 사계약일반조건에서도 공사용지 확보와 관련하여 발주기관은 계약상대자가 공사의 수행에 필요로 하는 날까지 공사용지를 확보하여 계약상대자에게 인도 하도록 규정하고 있다 그러나 실제 고속도로 공사현장에서는 공사용지 확보가 공사수행을 위해 필요 한 날까지 제대로 이루어지지 않는 경우가 많아 준공기한 준수를 위해 돌관공 사가 빈번하게 이루어지는 등 현실적인 어려움이 자주 발생하고 있다. 따라서, 본고에서는 관계법령 및 공사계약일반조건에서 규정한 공사용지 확보 관련규정에 대한 문제점을 제시하고 이에 대한 개선안을 제시함으로써 향후 공공공사를 시행함에 있어 공사용지 확보와 관련하여 발주기관 및 계약상대자 가 겪는 어려움을 해소하는데 일조하고자 한다.
        7,800원
        7.
        2022.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The purpose of this study is to perform traffic flow characteristics analysis for each point of the long-term work zones and to propose an estimated capacity method to support the establishment of traffic flow management strategies for the long-term work zones. METHODS : The study explained the difference in traffic flow characteristics between the short-term and the long-term work zones, and estimated the capacity of the long-term work zones. The analysis data were collected from five points of long-term work zones of the twolane highway. And VDS and DSRC data were applied to validate data. RESULTS : The characteristics of traffic flow at each measurement point in the long-term work zones showed some differences, among which the capacity was estimated as the starting point to be 1,200 pcphpl and the ending point, 1,400 pcphpl. The delay length was estimated by applying the queuing theory based on the capacity of the start point where the bottleneck starts. As a result of verifying the congestion length based on space diagram map analysis, it was determined that the capacity calculation value and estimation methodology presented in this study were appropriate. CONCLUSIONS : The long-term work zones are mixed with different characteristics of roads, so as the capacity values depending on the analysis location. Therefore, it is necessary to select analysis points and methodologies for estimating capacity and delay depending on the purpose of the analysis, such as estimating the maximum queue length or analyzing the maximum travel time. Through this study, it is expected that by providing accurate information on congestion in advance, road users can detour to other roads, and construction officials can adjust the construction plan to minimize congestion in the construction section.
        4,200원
        12.
        2021.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The type and degree of structural conditions and influencing factors distributed across representative sections should be similar to those distributed across entire sections as the representative sections have been predominantly used for developing performance prediction models, which substitute entire sections of road pavement. Therefore, a logic that selects the representative sections with similar distributions of structural conditions and the influencing factors with those of entire expressway asphalt pavement sections requires development. METHODS : The logic developed in this study to select the representative sections of asphalt pavements comprised three steps. First, the data on the structural conditions of the pavement and the influencing climate conditions and pavement materials were collected and organized. Consequently, in the second step, the candidate sections were selected, with the severity of the structural conditions of the pavement distributed widely and evenly. Finally, in addition to the widely and evenly distributed pavement conditions, the representative sections with climatic conditions and pavement materials were selected. RESULTS : A total of 6,352 ordinary asphalt pavement sections and 596 composite asphalt pavement sections were selected as entire expressway asphalt pavement sections and the data were collected and organized according to the logic developed in this study. Three times the representation sections were selected as candidate sections and, finally, 85 sections were selected as representative sections. The distribution of structural conditions and influencing climate conditions and pavement materials in the representative sections were similar to those in the entire sections. In addition, the representative sections were spread evenly across the country. CONCLUSIONS : The sections presenting similar distributions of structural conditions and the influencing factors of entire expressway asphalt pavement sections could be selected in this study. Using the representative sections selected in this study, a remodeling index model will be developed for predicting the asphalt pavement sections that require large-scale repair.
        4,300원
        13.
        2017.10 구독 인증기관·개인회원 무료
        고속도로 공사구간은 차로의 축소로 인한 병목구간이 존재하며, 공사작업의 영향으로 도로의 처리용량을 감소시켜 교통 혼잡을 야기한다. 공사구간으로 인해 발생하는 혼잡을 최소화하기 위해서는 공사구간의 교통관리가 매우 중요하며, 교통관리를 위한 전략을 수립하기 위해서는 공사구간에서의 혼잡상태를 분석하는 것이 중요하다. 따라서 본 연구에서는 고속도로 공사구간에서 발생할 수 있는 다양한 조건의 혼잡상태를 구분하고 충격파이론을 통해 분석하고자 한다. 본 연구에서 분석한 공사구간은 편도 2차로 중에서 1개 차로를 차단한 형태로 구성하였고, 그림 1과 같이 공사구간을 4가지 구역으로 분류하여, 이 중에서 충격파가 발생할 수 있는 구간인 Transition area와 Work space의 용량에 따라 충격파를 분석하였다. 용량과 수요의 관계에 따라 다양한 조건으로 구분할 수 있으나, 본 연구에서는 가장 주요한 조건 2가지에 대해 중점적으로 다루었다. 첫 번째는 수요가   (Transition area의 용량)보다는 작고  (Work space의 용량)보다는 큰 조건으로 Work space에서만 충격파가 발생하는 조건이고, 두 번째는 수요가  , 보다 큰 조건으로 두 구간에서 모두 병목현상이 발생하여 대기행렬이 쌓이게 되는 조건이다. 충격파이론을 직접 적용하기 위해 Bongsoo Son, A Study of G.F. Newell's "simplified theory of kinematic waves in highway traffic"(1996)에서 예제로 활용한 교통류-밀도 관계곡선을 활용하였으며, 두 조건에 대하여 충격파이론을 적용하였을 때의 충격파는 그림2와 그림3과 같다.
        14.
        2017.10 구독 인증기관·개인회원 무료
        한국도로공사는 ‘고차원 설계환경 기반의 차세대 고속도로 설계 및 관리역량 강화’, BIM 기반의 건설·운영 프로세스를 정립하기 위하여 EX-BIM 로드맵을 수립하였다(2016. 5). 현재 초기 도입단계로써,「EX-BIM 시공단계 표준모델 구축 연구」(한국도로공사, 건설처, 2017)를 수행하고 있다. 연구의 일환으로 시공단계 BIM 적용방안 마련을 위하여 ‘성남-구리간 고속도로 건설공사’를 대상으로 설계단계 BIM 성과품에 대한 검토 및 효과분석을 시행하고 있다. 성남-구리 노선 5개공구는 모두 설계-시공 일괄입찰방식으로 추진중이며, 수도권 주요 도심지를 우회하고 한강을 횡단하는 노선으로, 대부분 교량과 터널 등 구조물 위주로 설계되어 있다. 설계단계 BIM 성과품은 작성완료단계에 있으며, 이어 시공단계 BIM을 수행할 예정이다. BIM 적용 목표로 공기의 적정성, 수량의 적정성, 주요 시설물에 대한 간섭검토 등을 요구하였다. 그래서, 각 공구별 수행사는 BIM 실행계획서(BEP, BIM Execution Plan)를 작성하여 BIM 활용방안을 제시하고 설계단계 BIM을 수행하였으며, 이를 반영하여 최종 BIM 성과품을 작성하는 절차로 진행하였다 설계단계에서는 공기와 수량의 적정성 검토, 주요 시설물에 대한 간섭검토 위주로 BIM을 적용하였다. 공구별 3D/4D 모델을 작성하여, 일련의 과정과 결과를 BIM 결과보고서에 포함하여 성과품으로 작성하였으며, 이를 근거로, 설계 성과품 품질 향상과 시공단계 BIM 활용을 위하여 설계BIM 성과품을 검토하고 효과분석을 수행하였다. 성과품 검토 결과, 노선 특성에 따라 교량 및 터널 등 구조물 위주로 BIM을 적용하였으며, 도공 자체 WBS 모델 분류 체계에 따라 일부 모델을 구성하였으나, 공종별 주요 수량검토를 수행하기에는 공구 및 대상별 LOD가 다소 상이하고 미흡한 수준이었다. 설계단계 효과분석은 도면오류, 간섭검토, 주요 수량검토 등 설계시 대표업무에 대한 결과를 분석하였으며, 발주처나 시공사 입장에서 가시적 효과는 간섭검토, 도면오류검토 순으로 예상되었다. 추가로, 건설참여자를 대상으로 설계단계 BIM 모델을 시연하고 시공단계 활용성에 대하여 인터뷰를 실시하였는데, 가상현장과 사전시공 등 사업관리 측면에 대해 관심을 보였다. 본 연구는 성남-구리간 건설공사를 대상으로 설계단계 BIM 성과품을 검토하고 효과분석을 시행하여 고속도로 건설공사시 BIM 도입에 대한 타당성을 제시하고자 한다. 이와 함께, 설계단계 ROI 결과를 토대로 시공단계까지 확대 적용할수 있도록 지속적인 BIM 데이터 관리와 BIM 활용 효과에 대한 모니터링이 필요할 것이다.
        16.
        2016.03 구독 인증기관 무료, 개인회원 유료
        3,000원
        20.
        2014.09 구독 인증기관·개인회원 무료
        현재 건설 산업의 프로세스는 2D기반으로 설계, 시공, 유지관리 등 시설물의 총 생애주기 동안 관리 및 시행 주체가 상이하다. 또한 건설 산업 참여주체들은 전문성에 따른 독립된 작업으로 인해 총 생애주기 동 안 건설정보의 전달방법의 통일성이 부족한 상황이다. 이러한 정보단절로 인해 건설 산업의 생산성은 타 산 업과 비교해 낙후되어 있는 실정이다. 이러한 문제점을 극복하기 위해서는 건설 공종정보의 DB화 및 이를 활용하여 4D, 5D, nD-BIM 구현이 가능하도록 표준화된 BIM기반의 건설정보 분류체계가 필요하다. 이를 위해 국내·외 건설산업에서는 BIM기반의 설계/시공/유지관리의 건설 전 생애주기 단계에서 보다 효율적인 업무수행과 성공적인 프로젝트 성과를 위해 다양한 연구개발 및 정책도입이 진행되고 있다. 본 연구에서는 고속도로공사의 시범설계로 각 공종별 BIM설계를 수행 하고, 기존의 2D설계와 BIM설계의 물량차이를 비교 하고, 향후 토목BIM의 발전을 위해 BIM설계의 신뢰성을 분석하였다. 설계단계-BIM(Building Information Modeling)의 근간이 되는 물량산출의 접근성에 있어서 BIM에 대한 국내외 건설 산업의 신뢰도가 만족할 만한 수준은 아니다. 토목분야보다 10년가량 먼저 BIM 도입이 추진된 건축분야에서도 물량산출의 접근성 측면에 있어서는 비정형 구조물에 대한 시각화 정도에 머무르는 수준이 다. 국내 건축분야에서는 이미 단계적으로 BIM 납품의무화가 추진되고 있는 반면 토목분야는 BIM 도입의 초기단계임에도 불구하고 향후 3~4년 내 BIM 납품의무화를 위해 여러 공공기관에서 BIM 납품의무화 도입 을 준비 중에 있으며, BIM 납품의무화 시행을 위한 사전준비로서 부분적인 BIM설계 도입을 진행 중에 있다. 이에 본 연구에서는 BIM 도로설계를 시행하기에 앞서 기존의 2D기반 물량산출 결과와 BIM기반 물량산 출결과의 오차를 비교·분석하여 그 신뢰성을 분석하고, 향후 시행될 BIM설계의 확대 적용을 위한 기초자 료로 제공하고자 한다. 이를 위해 도로공사에 필요한 공사 중 구조물공인 교량공, 터널공, 옹벽공, 배수공, 부대공과 비구조물공인 토공, 포장공 등을 대상으로 신뢰성 분석결과를 제시 한다. BIM설계와 2D설계간의 물량 비교를 위해, 도로구간 중 이설도로, 부채도로, 확장부 등 기존도로는 제외 하고 본선 및 램프구간 토공 BIM 모델링을 수행하였으며, 교량은 확장교량의 기존교량은 형상만을 구현하 였으며 그 외의 모든 교량은 BIM으로 모델링하여 물량을 산출하였다. 터널은 모든 터널을 대상으로 BIM 모 델링을 수행하여 물량을 산출하였다. 배수공은 측구, 배수구조물, 암거 등 모든 배수공을 대상으로 BIM 모 델링을 수행하는 동시에 한국도로공사 배수공 표준도 적용하여 물량을 산출하는 방식으로 진행하였다. 옹벽 은 L형옹벽, RC옹벽, 프리케스트옹벽 등을 BIM 모델링을 통하여 물량을 산출하였으나 보강토 옹벽은 BIM 모델링을 통한 물량산출이 곤란하여 형상만을 구현하고 물량산출은 기존의 2D방식으로 진행하였다. 포장공 은 도로 토공구간과 연계된 사항으로 도로구간 중 이설도로, 부채도로, 확장부 등 기존도로는 제외하고 본 선 및 분기점, 터널 등을 대상으로 BIM 모델링을 수행하였다. 부대공은 표지판 등 부대 시설물에 라이브러 리를 구축하였으며, 이를 통합 모델링에 구현하여 부대시설 계획도에 반영함에 있어 향후 자동화 프로그램 개발 이후에 적용하는 것으로 업무를 합리화하였다. 모델링을 통한 BIM 물량과 기존 2D기반의 물량과의 오 차를 비교·분석함으로써 BIM 설계의 신뢰성과 우수성을 검증하였다. BIM기반의 물량산출 방식은 다양하 지만 본 과업에서는 여러 가지 BIM Tool 중에서 터널, 교량 등 구조물공은 Autodesk사의 Revit을 토공과 같이 지형 및 선형에 영향을 받는 비구조물공은 Autodesk사의 Civil3D를 적용하여 BIM 모델링 및 물량산 출을 진행하였다.
        1 2