The purpose of the study was to improve of performance for Magnetic Resonance Imaging (MRI) examination in the department of radiology. It was performed DMAIC (Define, Measure, Analyze, Improve, and Control). In the stage of definition, The fifth kinds of CTQ (critical to quality) by the kindness, the waiting time, the examination explanation, the waiting time and the waiting environment were selected by voice of customer. In the stage of measurement, the performed examinations and the reservation waiting time were measured each 1.77 and 1.69 sigma. In the stage of analysis, the potential key causes were determined the limited working hours and the difference of examination time of various entries. In the stage of improvement, MRI were performed with the operating system of 24 hours examination and the optimization of the difference of examination time by among of 30 minutes, 40 minutes, 50 minutes. Finally, the number of examinations and reserved waiting days were measured by each 3.17 and 1.71 sigma in the control stage.
Currently, cost estimation is very important to the government acquisition programs to support decisions about funding and to evaluate resource requirement as key decision points. Parametric cost estimating models have been used extensively to obtain appr
사회의 환경변화에 따라 기업 또한 기업 또한 과거 폐쇄적 수직 체계의 position power에서 개방적 수평체계의 communication power로 역할이 변화하고 있다. 기업의 사회적 책임 이행의 대표적인 활동인 사회공헌활동은 지역사회와의 소통 수단 뿐 아니라 새로운 마케팅전략으로 자리매김 되고 있다. 사회공헌활동의 성공요소 중 가장 중요한 것은 구성원의 봉사적 마인드이다. 봉사적 마인드는 이론 뿐 아니라 실천적 행동철학에 기인 한다. 기업이 바라는 인재상과도 밀접한 관계가 있다. 본 논문에서는 기업이 신입사원 채용시 봉사활동 실적을 반영하는데 있어서 표준적인 가이드라인을 연구 제시하고자 한다.
Recently the construction of the ERP(Enterprise Resource Planning) system becomes accomplished actively from the many enterprises. But the many problems occur in acquisition of production data which is a fundamental data of system. Also to delay the acquisition of the production result is fatal in the efficient business operation. The construction of the POP(Point of Production) system which acquires production data at real time is become accomplished widely, In the POP system it is most important to acquire the production data which is accurate. But the many enterprises drop the competitive power with acquisition of the data which could not be trusted. In this paper, we analyze these causes and present the method which it can improve the reliability of production data. Also we introduce a real application case.
Many technical and nontechnical issues hinder enterprise wide workflow management. The most significant technical issue is the inability to deal with the heterogeneity among users, workflow types, and WFMSs. Not all users demand the same workflow functionality, so user interfaces of different levels of sophistication are required. Because workflow types cannot always be fully predefined, they often need to be adjusted or extended during execution. Unlike relational database management systems, however, each WFMS often has differing workflow metamodels. This leads to incompatibility between WFMSs, making integration into an environment comprising many heterogeneous WFMSs a troublesome and sometimes impossible task. Current Workflow system consists mainly of Database system. It contains some problems like that the integration relationship among system processes cant be expressed properly. This research has been focused on two phases that should be considered in the Workflow system. First of all, the first phase is the analysis phase; one of its role is to figure out independent execution task unit(Workflow component). The second phase is design phase that provides with the framework to execute these task units actively. The Workflow component extraction method in the analysis phase uses a analysis method called C-C Net and, in the design phase, the architecture that makes the these Workflow component executed actively is provided. Through this research, each process is divided into a task unit and more effective Workflow system could be formed by executing these units actively. Current system layer calls task units, on the other hand, the Workflow system this research implemented provides with the architecture that places a layer between them that controls task units actively.
한국과학재단 연구 인력 DB를 활용하여 지구과학을 포함한 국내 이공계 연구자의 연구 실적을 분석하였다. DB에 수록된 지질과학분야 연구자수는 312명(점유율 1.5%)이고, 최근 5년간(1999년부터 2003년까지) 게재실적은 SCI 학술지가 1,026편(점유율 0.2%)이었고, 일반학술지가 3,265편(점유율 0.5%)이었다. 최근 5년간 1인당 SCI 학술지 게재실적은 지질과학 분야가 3.3편, 수학은 4.0편, 물리학은 57.6편, 화학은 60.4편, 생물학은 33.4편으로 조사되었다. 지질과학분야 중 세부 분야별 연구자의 1인당 SCI 논문 게재실적은 환경지질학 9.6편, 층서퇴적학 4.6편, 지구화학 4.2편, 지하 수학 3.6편, 지질해양 3.5편, 자원공학 3.2편 순이었다. 본 조사분석 연구 결과는 지구과학과 타 이공계 분야간의 연구실적의 양과 질적인 측면에서의 상대 비교를 위한 근거로 활용될 수 있다.
보트의 초기설계단계에서 설계자는 주요치수 결정을 위해 많은 정보를 필요로 하며, 그러한 정보의 대부분은 해당 보트와 유사한 실적선 자료들을 많은 시간에 걸쳐 조사 및 분석함으로써 얻을 수 있다. 또한, 결정된 주요치수는 설계과정(기본/상세설계) 전반에 걸쳐 영향을 미치게 되고, 이는 결국 보트의 안정성과 성능으로 직결된다. 따라서 본 연구에서는 700여 척의 실적선 자료를 이용하여 보트 초기설계시스템(설계지원플랫폼)을 개발하고, 50피트급 고속보트를 대상으로 이를 활용하여 설계자가 초기설계단계에서도 주요치수를 편리하고 합리적으로 도출 및 결정할 수 있음을 확인하였다.
본 연구의 목적은 이중편파 레이더 강우자료와 격자기반 분포형 강우-유출 모형인 KIMSTORM (KIneMatic wave STOrm Runoff Model)을 이용하여 유출해석을 수행하고, 침수실적자료와의 비교를 통해 레이더 강우자료의 효용성을 검토하는데 있다. 남강댐 유역(2,293 km²)을 대상으로, 2012년 4개의 강우 이벤트(집중호우, 카눈, 볼라벤, 산바)에 대하여 비슬산 레이더 강우자료를 사용하였다. 분포형 모형은 28개 지점 강우와 레이더 강우를 이용하여 보정되었으며, R² (coefficient of determination), ME(model efficiency), VCI (volume conservation index)를 이용하여 적용성을 평가하였다. 모형의 보정결과, R², ME, VCI의 평균이 지점강우 를 이용한 경우 각각 0.85, 0.78, 1.09, 레이더 강우를 이용한 경우 각각 0.85, 0.78, 0.96의 결과를 보였다. 태풍 산바에 의한 하천범람 침수실적자료의 두 침수지역(신연지구와 문대/신기지구)과 레이더와 지상강우에 의한 유출분석 결과를 비교하였다. 신연지구와 문대/신기지구 두 침수지역에서 레이더강우가 지상강우보다 더 많은 지역강우를 발생시켜 지표유출량을 더 크게 모의하는 것을 확인할 수 있었다. 특히 수위관측소가 존재하는 문대/신기지구의 경우, 지점강우보다 레이더 강우가 침수지역내 수위관측소의 실제 첨두유량에 가깝게 모의하였으며, 하천수위도 0.72 m 높게 모의하였다.
This study aims to develop a rational evaluation system which consists of the selection of evaluation items and the estimation of its weight for the Enhancement Program of the Quality of Life for Farmers and Fishermen and Rural Development. This system has two hierarchical steps. The first step shows the evaluation goals which are relevance, efficiency and effectiveness of the program. The second step stands for the evaluation items which have 11 sub-items such as necessity and externalization for the program, rationality of procedures, feedback and monitoring system, budgetary allocations, information activities, impacts on the program, achievements of the goals and so on. A tentative evaluation system was proposed by brainstorming and Delphi method of expert-group. Weighting values of evaluation items were calculated through pair-comparison works of expert group using stepwise matrix sheets by AHP(Analytic Hierarchy Process).