        1.
        2021.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study set up the estimates of leakage management efficiency evaluation and leakage management goal that could be used in local water distribution networks efficiency business and modernization business. The data were analyzed using data envelopment analysis and multiple regression analysis. To this end, with leakage management input indices concerning leakage reduction activities (e.g., aged pipe replacement, water meter replacement, leakage restoration, and leakage detection) and leakage management calculation indices (e.g., the increase of revenue water ratio and the reduction of leakage ratio), the data on 22 K-water consignment local water supply systems were analyzed for the years from 2004 through 2018. Using the results of efficiency analysis by data envelopment analysis, the other DMUs (Decision Making Unit) benchmarked the DMU with the highest efficiency to maximize the leakage management efficiency for all DMUs. Through this, leakage management goal estimates were drawn with the input indices of four leakage reduction activities and calculation indices of the increase of revenue water ratio and the reduction of leakage ratio by multiple regression analysis for each group based on the revenue water ratio and leakage ratio. The correlation coefficients of the leakage management goal estimate for the criteria for the revenue water ratio amounted to 0.553 and 0.771. The correlation coefficients of the leakage management goal estimate for the criteria for leakage ratio were 0.397 and 0.865. Accordingly, we estimated the quantity and priority of four leakage reduction activities for the target leakage ratio and revenue water ratio.
        4,500원
        2.
        2019.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Waterworks facilities inevitably experience some amount of leakage even if there is a lot of investment or state-of-the-art technology that is applied such as DMA(District Metered Area) system construction, leakage detection, repair, pipe rehabilitation, etc. The primary reason is the leakage is naturally restored over time. In the UK, this restoration characteristic is defined as NRR(Natural rate of rise of leakage) and used to decision making for prioritizing active leakage control of DMAs. However, this restoration characteristic is well recognized, but researches on NRR in the water distribution system are insufficient in Korea. In this study, the estimation method of NRR was developed suitable for applicating in Korea considering of SCADA data, water infrastructure, and water usage patterns by modification of the UK's NRR method. The proposed method was applied to 9 DMAs and verified it's applicability by comparing with the other water loss performance indicators. It is expected that the proposed method can be used to support decision making for sustainable NRW(Nor-revenue water) management in the water distribution system.
        4,200원
        3.
        2017.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        A real scale leakage test facility was developed to study the leak signal characteristics of water supply pipelines, and then leak tests were carried out. The facility was designed to overcome the limited experimental circumstances of domestic water supply pipeline experimental facilities. The length of the pipeline, which was installed as a straight line, is 280m. Six pipes were installed on a 70m interval with different pipe material and diameters that are DCIP(D200, D150, D100, D80), PE(D75) and PVC(D75).The intensity of the leakage is adjusted by changing the size of the leak hole and the opening rate of ball valve. Various pressure conditions were simulated using a pressure reducing valve.To minimize external noise sources which, deteriorate the quality of measured leak signal, the facility was built at a quiet area, where traffic and water consumption by customers is relatively rare. In addition, the usage of electric equipment was minimized to block out noise and the facility was operated using manual mode. From the experimental results of measured leakage signal at the facility, it was found that the signal intensity weakened and the signal of high frequency band attenuated as the distance from the water leakage point increased.
        4,200원
        4.
        2017.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The estimation method of economical leakage management target utilized upon planning business for improvement of revenue water ratio in South Korea is presented and applicability of methods developed in this study is assessed through application on site. With a consideration of revenue water ratio in application target area, estimation method of long-term economical leakage management target is applied. Three leakage reduction methods such as replacement of residual aged pipe, leakage investigation and restoration and water pressure management are applied with a consideration of characteristics of site. Due to difficulty of obtaining data, analysis of cost/benefit by leakage reduction methods is performed by applying method of leakages estimation equation among statistical methods. As a result of application, revenue water ratio corresponding to long-term economical leakage management target is 91.6 %.
        4,300원
        5.
        2019.04 서비스 종료(열람 제한)
        Safety, Durability, and Usability of the Concrete Structure affecting among, there are crack and leakage the main damage is crack and leakage. Especially, Leakage is accompanied by Efflorescence, and provoke steel corrosion, exfoliation. This leakage is leaked to the exterior of the concrete surface in the shape of line or face, the method of repair varies with the shape of leakage. Accordingly, this paper will introduce case analysis of the shape of the water leakage to water leakage site in the lining structure of the NATM tunnel for utilize investigation method and basic data for the method of repair.(leakage, Efflorescence)
        6.
        2018.10 서비스 종료(열람 제한)
        Measurement items of phenomena reflecting the overall condition of the structure during the measurement for safety management in the dam include water volume and displacement depending on the number of water leaks. Leakage measurements, which are important indicators to be measured on a dam, require significant accuracy and reliability. However, the dam design basis includes general measurement equipment, but the lower the limit for calculating the water leakage, and the lack of accuracy and reliability is a phenomenon. Therefore, in order to improve accuracy and reliability of the dam's major measurement items, the standards of the dam water measuring meter and the suitability of the water leak calculation formula (based on USBR) are reviewed to elicit problems and suggest solutions.
        7.
        2017.09 KCI 등재 서비스 종료(열람 제한)
        본 연구에서는 상수관망의 최적 수압모니터링 지점선정 알고리즘과 역추적 계산법을 이용한 누수탐지 알고리즘을 개발하였고 파일럿 플랜트에서 실험을 통해 검증하였다. 먼저 누수탐지를 위한 최적의 모니터링 지점선정을 선정하고 압력계를 설치하여 누수로 인한 압력변위를 측정하였다. 누수탐지를 위한 역추적계산법의 검증을 위하여 누수탐지를 수행하였고 파일럿플랜트에서 실제 재현된 누수의 지점과 누수량을 정확하게 산정하였다. 누수량을 0.0005 m3/s로부터 0.0018 m3/s까지 변화시키며 누수를 재현하였고 누수지점에 근접한 장소를 찾는데 성공하였다. 본 연구에 서는 실험을 통해서 누수탐지기법으로 사용된 역추적계산법이 유효함을 검증할 수 있었다.
        8.
        2016.04 서비스 종료(열람 제한)
        A new array was suggested for effective leakage detection of concrete water facility. This array was modified to serve the purpose. Plus and minus currents have been installed respectively on the upstream and downstream water in order to detect the flow of water floating through the crack of facility. Potential poles in two lines have been installed closer than current sources to the weir to measure potential difference in upstream and downstream. Interpreting the potential difference data acquired by the new array, we could predict that where is the leakage zone. The possibility that can distinguish the leakage zone has been confirmed by numerical and physical modeling and problem position expected to leak was verified in field exploration.
        10.
        2016.04 서비스 종료(열람 제한)
        This study is based on a survey conducted to understand the current problems of water leakages in underground structures. According to the overall results, 55.7% of the respondents replied that water leakage problems is serious and all replied that a preventative measure is absolutely necessary.
        11.
        2016.04 서비스 종료(열람 제한)
        In this study, in order to enhance the quality of concrete dam it is mentioned that the influenced factors which effect on the water leak and methodology for weak zone repair and retrofit before filling water of concrete dam.
        12.
        2015.10 서비스 종료(열람 제한)
        Recently, as ‘ground subsidence in urban area’ problem become social issue, Central & Local Government examined current state of ground subsidence. As a results, It is revealed that 1)sewage pipeline damage, 2)excavation work of surrounding pipeline, and 3)water pipeline damage were main reason of subsidence. This study is going to present weak-point for each type of pipeline in the case of water pipeline monitoring, by analyzing current state materials of water pipeline leakage work of ○○city, to prevent ground subsidence from water pipeline leakage.
        15.
        2015.04 서비스 종료(열람 제한)
        In this study, in order to enhance the quality of concrete dam it is mentioned that the influenced factors which effect on the water leak and methodology for weak zone survey before filling water of concrete dam.
        16.
        2014.10 서비스 종료(열람 제한)
        The quality of injection sealer for water leakage maintenance be being managed by KS. However, the test result of response to the substrate movement performance have some errors by an experimenter. Therefore, this revision standard of test method is proposed by that the new tester is manufactured for solving this errors in this study.
        17.
        2014.10 서비스 종료(열람 제한)
        This report is contained to the repair guidelines of water-leakage crack and the standardization of performance evaluation testing method studied and reviewed to register to the domestic construction technique as the international standard, and to the introduction to the it’s research contents lasted three years between 2010 and 2013.
        18.
        2013.10 KCI 등재 서비스 종료(열람 제한)
        수돗물의 공급과정에서 발생되는 상수관망의 누수는 소중한 수자원의 손실, 공급에너지의 추가적인 소요 등 사회경제적인 손실을 초래한다. 본 연구에서는 관로 상에 설치되어 실시간으로 계측되는 유량자료를 이용하여 누수를 감시하는 모형을 적응 칼만필터 기법을 이용하여 제시하였다. 제안된 누수감시 알고리즘에서는 수돗물 사용량의 시간적 변화와 요일적 변동을 고려함으로써 예측의 신뢰도를 향상시키는 방안을 제시하였다. 또한 기존의 칼만필터 기법에 혁신과정을 추가하여 잡음의 공분산에 대한 자동보정을 통하여 예측의 정확도를 개선하였다. 개발된 모형은 사인형태의 가상 유량자료에 대한 모의실험을 통하여 적응 칼만필터 기법의 예측 정확도를 기존의 칼만필터 기법과 비교하였으며, JE시의 2개 소블록 유량자료에 대한 현장 적용성 평가를 실시하였다. 본 연구의 결과는 관로의 파열에 의한 누수 및 비정상적인 용수사용량에 대한 감시를 통하여 상수관망의 효율적인 운영관리에 적용될 수 있을 것으로 기대된다.
        19.
        2013.10 서비스 종료(열람 제한)
        The quality of injection sealer for water leakage maintenance be being managed by KS and ISO. However, the test result of percolation resistance performance have some errors by an experimenter. Therefore, this revision standard of test method is proposed by that the new tester is manufactured for solving this errors in this study.
        20.
        2013.04 서비스 종료(열람 제한)
        Quality of injection sealer for water leakage maintenance be being managed by KS and ISO. However,the test result of bonding performance on the wet surface of concrete have some errors by an experimenter. Therefore this revision standard of test method is proposed by that the new tester is manufactured for solving this errors in this study.