검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 13

        1.
        2019.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In order to deal with high uncertainty and variability in emergency medical centers, many researchers have developed various models for their operational planning and scheduling. However, most of the models just provide static plans without any risk measures as their results, and thus the users often lose the opportunity to analyze how much risk the patients have, whether the plan is still implementable or how the plan should be changed when an unexpected event happens. In this study, we construct a simulation model combined with a risk-based planning and scheduling module designed by Simio LLC. In addition to static schedules, it provides possibility of treatment delay for each patient as a risk measure, and updates the schedule to avoid the risk when it is needed. By using the simulation model, the users can experiment various scenarios in operations quickly, and also can make a decision not based on their past experience or intuition but based on scientific estimation of risks even in urgent situations. An example of such an operational decision making process is demonstrated for a real mid-size emergency medical center located in Seoul, Republic of Korea. The model is designed for temporal short-term planning especially, but it can be expanded for long-term planning also with some appropriate adjustments.
        4,000원
        2.
        2018.05 구독 인증기관·개인회원 무료
        본 연구는 통합공정일정계획(Integrated Process Planning and Scheduling; IPPS)의 최적화를 위한 계산 효율성이 높은 탐욕적 휴리스틱과 유전알고리즘(Genetic Algorithm; GA)을 결합한 하이브리드형 유전 알고리즘을 제안한다. IPPS는 기존의 공정계획과 일정계획을 동시에 풀고자 하는 NP-Hard 문제이다. 특히, 본 연구에서 다루는 IPPS는 tool related constraints가 포함된 것으로서 전통적인 GA는 수행도중 infeasible schedule을 빈번히 발생시킨다. 제안하는 방법의 아이디어는 전체적인 schedule의 구조에 영향을 미치는 operation의 sequence와 machine의 결정은 GA의 procedure를 따르고, 목적함수의 부분계산이 가능한 tool과 Tool Access Direction(TAD)는 greedy heuristics을 통하여 infeasibility를 해소하자는 것이다. 이를 통하여 계산시간의 급격한 증가 없이 또는 기존에 비해 계산시간을 감소시키면서 좋은 품질의 해를 구할 수 있다. 본 연구에서 제안하는 알고리즘은 benchmark problems을 이용하여 성능을 평가한다.
        3.
        2017.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper proposes an improved standard genetic algorithm (GA) of making a near optimal schedule for integrated process planning and scheduling problem (IPPS) considering tool flexibility and tool related constraints. Process planning involves the selection of operations and the allocation of resources. Scheduling, meanwhile, determines the sequence order in which operations are executed on each machine. Due to the high degree of complexity, traditionally, a sequential approach has been preferred, which determines process planning firstly and then performs scheduling independently based on the results. The two sub-problems, however, are complicatedly interrelated to each other, so the IPPS tend to solve the two problems simultaneously. Although many studies for IPPS have been conducted in the past, tool flexibility and capacity constraints are rarely considered. Various meta-heuristics, especially GA, have been applied for IPPS, but the performance is yet satisfactory. To improve solution quality against computation time in GA, we adopted three methods. First, we used a random circular queue during generation of an initial population. It can provide sufficient diversity of individuals at the beginning of GA. Second, we adopted an inferior selection to choose the parents for the crossover and mutation operations. It helps to maintain exploitation capability throughout the evolution process. Third, we employed a modification of the hybrid scheduling algorithm to decode the chromosome of the individual into a schedule, which can generate an active and non-delay schedule. The experimental results show that our proposed algorithm is superior to the current best evolutionary algorithms at most benchmark problems.
        4,000원
        4.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The systematic management of technology infrastructure increasingly becomes critical as it represents the driving power for creating competitive advantage of nations and enterprises. In this sense, public facility and equipment, which is one major asset of technology infrastructure, should be managed effectively, systematically and efficiently to increase its overall equipment effectiveness. However, the manual and off-line communication was the unique way to communicate between the suppliers who provide facilities in the public sector and the customers who utilize the facilities in the industrial sector. This communication way caused invisibility of available usage time and increase of idle time, thereby decreasing the equipment effectiveness. This paper presents an web-based scheduling system that enables real-time collaboration and information sharing for increasing the equipment effectiveness. The designed system performs scheduling, facility management, order management and customer relationship management in an on-line platform, and carries out the processing and storing of relevant information in an integrated database. The paper includes a development approach to identify business process models and standardized system models by using object-modeling technique. The deliverable of the present work will contribute to increasing the equipment effectiveness by enhancing visibility, transparency and predictability by means of the integration with a legacy Enterprise Resource Planning.
        4,000원
        5.
        2015.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.
        4,000원
        6.
        2012.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As enterprises, based on the forecast of the customer's demand and collaboration with the suppliers, establish the integrated system directing supply, production, and distribution for the increase of productivity, Thus, this study intends to find the most urgent and critical factors for the improvement of the information system by externalizing factors affecting the operation of information system, suggest the process to improve the relevant functions of information system, and design the process. As a result of the analysis of the previous studies on the improvement of the information system, many studies were conducted on the improvement of ERP and SCM, yet there was no study conducted targeting about APS (Advanced Planning & Scheduling). Thus, this study chose APS as the subject for the design of the process for the improvement for the information system.
        4,000원
        7.
        2011.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The advanced planning and scheduling(APS) is an well known enterprise information system that provides optimal production schedules and supports to complete production on time by solving the complex scheduling problems including capacity and due dates. In
        4,200원
        9.
        2004.04 구독 인증기관 무료, 개인회원 유료
        Even though Companies have used to focus on maximizing the facility rates of operation to enhance their competitiveness and increasing employees' productivity to accomplish the price and quality control, they no longer can make their business successful in these days. To be successful in increasingly competitive environment, it is essential to capture customers' needs and to reflect customers' needs in their production scheduling system. This paper describes that manufacturing scheduling method using TOC in SCM environment to change companies-oriented manufacturing scheduling to customer-oriented manufacturing scheduling.
        4,000원
        10.
        2003.11 구독 인증기관 무료, 개인회원 유료
        In this regard, the newly focused logistics information system makes reducing the expenses of whole logistic available by cutting down the expenses of materials, transportation and stock and also, it allows the company to cut down the procurement expense through the reduced lead-time and rationalize producing plans by eliminating the uncertain orders and fluctuation in procurement. It further more optimizes the efficiency of over all productions by meeting the dead line for delivery to the customers. In the recent environment of globalization where fierce competitions exist between manufacturers, logistics plays important role in the strategies of companies, and managements of companies try their best efforts in establishing the strategy to accomplish the innovative relationship between supply chain channels. Therefore, in this study, we try to suggest the model of consolidated logistics system that is integrated logistics information system with suggesting the better way of logistics and comparative analysis with logistics system to resolve the difficulties numbers of companies face after realizing what logistics information system is in Korea.
        3,000원
        11.
        2002.10 구독 인증기관 무료, 개인회원 유료
        In this paper, we propose a case study to treat planning and scheduling in factory of supply chain. In fact, the planning and the scheduling of a factory are not easily solved because of constraints of facility resources, material requirements, allowed planning times, and so on. However many packages are developed by vendors in Advanced Planning and Scheduling(APS) aspects to solve these problems. We, therefore, analyze problems of an electronic company and apply the tool, Factory Planner(FP), to solve problems.
        4,000원