검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4,512

        75.
        2023.11 구독 인증기관·개인회원 무료
        KEPCO KPS is the contractor for the full system decontamination (FSD) of Kori Unit 1 and under preparation such as modification, lay out for equipment installation, setting up tie-in/out point for chemical injection and way to pressurize the system, of its successful performance. In this research, KPS introduced how KPS has designed and prepared for the FSD project and how will the chemical decontamination process be implemented. As described in the previous research, chemical decontamination process is planned to be conducted for three cycles and each cycle is consisted of oxidation, reduction, decomposition, and purification. Oxidation and reduction process were conducted at 90°C. Chemical decomposition and purification process were conducted at 40°C due to the damage of IX by the heat. If the decontamination result does not meet the target DF and the dose rate, additional cycle can be conducted. Expected volume of process water for FSD is 200 m3. Three systems have been designated as decontamination targets: reactor coolant system (RCS), residual heat removal system (RHRS), chemical volume control system (CVCS). For the steady flow rate, existed plant equipment such as reactor coolant pump (RCP) will be operated and modifications on some components will be conducted. Due to the limited space for installation, decontamination equipment and other resources are distributed to three different places. KPS designed the layout of equipment installed inside the containment vessel. The layout contains the information of shielding for highly radiated equipment such as IX and filter skid.
        76.
        2023.11 구독 인증기관·개인회원 무료
        The domestic Pressurized Heavy Water Reactor (PWHR) nuclear power plant, Wolsong Unit 1, was permanently shut down on December 24, 2019. However, research on decommissioning has mainly focused on Pressurized Water Reactors (PWRs), with a notable absence of both domestic and international experience in the decommissioning of PHWRs. If proper business management such as radiation safety and waste is not performed, it can lead to increased business risks and costs in decommissioning. Therefore, the assessment of waste volume and cost, which provide fundamental data for the nuclear decommissioning process, is a crucial technical requirement before initiating the actual decommissioning of Wolsong Unit 1. Decommissioning radiation-contaminated structures and facilities presents significant challenges due to high radiation levels, making it difficult for workers to access these areas. Therefore, technology development should precede decommissioning process assessments and safety evaluations, facilitating the derivation of optimal decommissioning procedures and ensuring worker safety while enhancing the efficiency of decommissioning operations. In this study, we have developed a program to estimate decommissioning waste amounts for PHWRs, building upon prior research on PWR decommissioning projects while accounting for the specific design characteristics of PHWRs. To evaluate the amount of radioactive waste generated during decommissioning, we considered the characteristics of radioactive waste, disposal methods, packaging container specifications, and the criteria for the transfer of radioactive waste to disposal operators. Based on the derived algorithm, we conducted a detailed design and implemented the program. The proposed program is based on 3D modeling of the decommissioning components and the calculation of the Work Difficulty Factor (WDF), which is used to determine the time weighting factors for each task. Program users can select the cutting and packaging conditions for decommissioning components, estimate waste amount based on the chosen decommissioning method, and calculate costs using time weighting factors. It can be applied not only to PHWRs, but also to PWRs and non-nuclear fields, providing a flexible tool for optimizing decommissioning process.
        77.
        2023.11 구독 인증기관·개인회원 무료
        The radiological characterization of SSCs (Structure, Systems and Components) plays one of the most important role for the decommissioning of KORI Unit-1 during the preparation periods. Generally, a regulatory body and laws relating to the decommissioning focus on the separation and appropriate disposal or storage of radiological waste including ILW (intermediate level waste), LLW (low level waste), VLLW (very low level waste) and CW (clearance waste), aligned with their contamination characteristics. The result of the preliminary radiological characterization of KORI Unit-1 indicated that, apart from neutron activated the RV (reactor vessel), RVI (reactor vessel internals), and BS (biological shielding concrete), the majorities of contamination were sorted to be less than LLW. Radiological contamination can be evaluated into two methods. Due to the difficulties of directly measuring contamination on the interior surfaces of the pipe, called CRUD, the assessment was implemented by modeling method, that is measuring contamination on the exterior surfaces of the pipes and calculating relative factors such as thickness and size. This indirect method may be affected by the surrounding radiation distribution, and only a few gamma nuclides can be measured. Therefore, it has limitation in terms of providing detailed nuclide information. Especially, α and β nuclides can only be estimated roughly by scaling factors, comparing their relative ratios with the existing gamma results. To overcome the limitation of indirect measurement, a destructive sampling method has been employed to assess the contamination of the systems and component. Samples are physically taken some parts of the systems or components and subsequently analyzed in the laboratory to evaluate detailed nuclides and total contamination. For the characterization of KORI Unit-1, we conducted the radiation measurement on the exterior surfaces of components using portable instruments (Eberline E-600 SPA3, Thermo G20-10, Thermo G10, Thermo FH40TG) at BR (boron recycle system) and SP (containment spray system) in primary system. Based on these results, the ProUCL program was employed to determine the destructive sample collection quantities based on statistical approach. The total of 5 and 8 destructive sample quantities were decided by program and successfully collected from the BR and SP systems, respectively. Samples were moved to laboratory and analyzed for the detail nuclide characteristics. The outcomes of this study are expected to serve as valuable information for estimating the types and quantities of radiological waste generated by decommissioning of KORI Unit-1.
        78.
        2023.11 구독 인증기관·개인회원 무료
        Various radioactive metal wastes are generated during operation and decommissioning of nuclear facilities. Radioactive metal wastes with complex geometries or volumetric contamination can be difficult to decontaminate and disposal costs may increase. To solve these problems, the radioactive metal wastes can be treated by melting method. In this study, we designed a melting furnace system of air induction melting type, which is widely utilized due to its advantages of good thermal efficiency, uniform heating and guaranteed safety for radioactive material. By utilizing the melting furnace system, volatile radionuclides existed in the base material can be captured in the form of gas or dust by the filter. The radionuclides whose chemical properties can easily form metal oxides present as slag. For this reason, the specific radioactivity of the base material can be reduced. Radionuclides that are difficult to transport to slag and dust are uniformly distributed in the base material. A dedicated power supply and a transformer were necessary to be included in the melting furnace system since the induction furnace uses high-frequency currents. In addition, a hood is placed on top of the furnace to capture fumes generated during melting, and additional hoods were installed around the furnace to remove airborne dust. In particular, a dust collection unit consisting of a cyclone and a HEPA filter were constructed to effectively collect dust containing radionuclides. During the melting process, the slag is removed and accumulated separately, and the ingot production system was designed to produce the ingot using molten metal. The furnace was constructed for tilting the molten metal by moving the furnace using hydraulic system. The water cooling system and cooling tower were prepared to cool off the equipment with high temperature during melting is cooled off. The above process was specified in the operating procedure developed for this melting furnace system, and the operator shall operate and inspect according to the prescribed procedures. The radioactivity concentration in the sample taken in the step of tilting shall be analyzed whether they meet clearance level for self-disposal determined and publicly announced by the Commission. We can conduct self-disposal for the product of melting furnace system confirmed by the Commission as having the radioactivity concentration by nuclide not exceeding the value determined by the Commission.
        79.
        2023.11 구독 인증기관·개인회원 무료
        The development of existing radioactive waste (RI waste) management technologies has been limited to processing techniques for volume reduction. However, this approach has limitations as it does not address issues that compromise the safety of RI waste management, such as the leakage of radioactive liquid, radiation exposure, fire hazards, and off-gas generation. RI waste comes in various forms of radioactive contamination levels, and the sources of waste generation are not fixed, making it challenging to apply conventional decommissioning and disposal techniques from nuclear power plants. This necessitates the development of new disposal facilities suitable for domestic use. Various methods have been considered for the solidification of RI waste, including cement solidification, paraffin solidification, and polymer solidification. Among these, the polymer solidification method is currently regarded as the most suitable material for RI waste immobilization, aiming to overcome the limitations of cement and paraffin solidification methods. Therefore, in this study, a conceptual design for a solidification system using polymer solidification was developed. Taking into account industrial applicability and process costs, a solidification system using epoxy resin was designed. The developed solidification system consists of a pre-treatment system (fine crush), solidification system, cladding system, and packing system. Each process is automated to enhance safety by minimizing user exposure to radioactive waste. The cladding system was designed to minimize defects in the solidified material. Based on the proposed conceptual design in this paper, we plan to proceed with the specific design phase and manufacture performance testing equipment based on the basic design.
        80.
        2023.11 구독 인증기관·개인회원 무료
        In 2012, POSIVA selected a bentonite-based (montmorillonite) block/pellet as the backfilling solution for the deposition tunnel in the application for a construction license for the deep geological repository of high-level radioactive waste in Finland. However, in the license application (i.e. SC-OLA) for the operation submitted to the Finnish Government in 2021, the design for backfilling was changed to a granular mixture consisting of bentonite (smectite) pellets crushed to various sizes, based on NAGRA’s buffer solution. In this study, as part of the preliminary design of the deep geological repository system in Korea, we reviewed history and its rationale for the design change of Finland’s deposition tunnel backfilling solution. After the construction license was granted by the Finnish Government in 2015, POSIVA conducted various lab- and full-scale in-situ tests to evaluate the producibility and performance of two design alternatives (i.e. block/pellet type and granular type) for backfilling. Principal demonstration tests and their results are summarized as follows: (a) Manufacturing of blocks using three types of materials (Friedland, IBeco RWC, and MX-80): Cracking and jointing under higher pressing loads were found. Despite adjusting the pressing process, similar phenomena were observed. (b) 1:6 scale experiment: Confirmation of density difference inhomogeneity due to the swelling of block/pellet backfill and void filling due to swelling behavior into the mass loss area of block/pellet. (c) FISST (Full-Scale In situ system Test): Identification of technical unfeasibility due to the inefficient (too manual) installation process of blocks/pellets and development of an efficient granular in-situ backfilling solution to resolve the disadvantage. (d) LUCOEX-FE (Large Underground Concept Experiments – Full-scale Emplacement) experiment: Confirmation of dense/homogeneous constructability and performance of granular backfilling solution. In conclusion, the simplified granular backfill system is more feasible compared to the block/ pellet system from the perspective of handling, production, installation, performance, and quality control. It is presumed that various experimental and engineering researches should be preceded reflecting specific disposal conditions even though these results are expected to be applied as key data and/or insights for selecting the backfilling solution in the domestic deep geological repository.
        1 2 3 4 5