검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 9

        1.
        2024.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This paper presents a foundational study aimed at strengthening the competitiveness of future overseas construction engineering projects, efficiently guiding investment decisions for the government or private sectors and establishing policy suggestions for areas that need to be supplemented and linked. METHODS : The data envelopment analysis (DEA) model was used to measure the operational efficiency for individual types of work. The DEA model for measuring efficiency uses the representative Charnes, Cooper, and Rhode (CCR) and Banker, Charnes, and Cooper (BCC) models. RESULTS : By using statistics of overseas construction projects and conducting DEA, it was revealed that construction management was most needed in the energy facility sector of overseas construction projects. CONCLUSIONS : Although the capabilities of our country's companies are excellent, it was evident that the energy and industrial facilities sectors, which need to be supplemented to enhance their competitiveness, require policy support that incorporates construction management (CM). Consequently, it was confirmed that the construction management sector needs investment that should continue to be activated in the future. Additional research is needed that considers variables and environments related to overseas construction projects’ on-site conditions. To this end, the government should continue to promote research and government investment linked to CM to make progress in overseas construction sectors.
        4,000원
        2.
        2022.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        이 연구는 산림복원사업 이후 유입되는 귀화식물과 생태계교란 식물의 실태 및 사업의 특성에 따라 나타나는 양상을 파악하는데 목적을 두고 있다. 현장조사는 산림청에서 수행한 산림복원사업지 29개소를 대상으로 2020년과 2021년 봄철(5~6월), 여름철(8~9월)로 나누어 연 2회 실시하였고, 사업 범위 밖의 지역은 조사에서 제외하여 실제 복원사업 후 도입 및 유입되었다고 볼 수 있는 식물을 파악할 수 있도록 하였다. 또한 대상지 내 분포하는 귀화식물상과 복원사업 준공내역 확인을 통해 현장에 실제 적용된 공종과의 연관성을 분석하였다. 전체 대상지에서 출현한 귀화식물은 29과 80속 108종 1아종으로 109분류군이며, 생태계교란 식물은 총 3과 7속 8종이 확인되었다. 귀화식물의 분류군 수와 귀화율은 사업 후 소요시간이 증가함에 따라 점차 감소하는 추세를 보였고, 귀화식물 분류군 수와 귀화율은 권역 간 유의적인 차이가 없는 것으로 나타났으나(p>0.05), 훼손 유형별 귀화식물 분류군 수의 경우 백두대간 단절 구간과 채석지, 시설부지 등의 유형에서 출현한 귀화식물 수가 상대적으로 많았다(p<0.05). 복원지 내 나지 및 비탈면의 녹화를 위한 식생도입 방법인 종자 파종, 나무 식재, 초본 식재, 떼붙임 공종의 유무에 따른 귀화율 비교 분석 결과, 종자 파종을 할 경우 귀화율은 평균 15.545%로 파종 공종이 없는 경우의 평균 9.167%에 비해 높은 것으로 나타났고 (p<0.05), 그 외 다른 식생도입 방법은 공종 적용 유무에 따라 귀화율의 유의적인 차이가 나타나지 않았다(p>0.05). 이는 식물체의 형태를 확인하고 어느 정도 제어할 수 있는 나무 식재와 초본 식재, 떼붙임 공종과는 달리 종자 상태에서 귀화식물 여부의 파악이 까다로운 종자 파종 공종이 산림복원사업지 내 귀화식물 도입에 큰 영향을 미치는 것을 의미한 다. 따라서 복원지 내 종자 파종 시 종자 전문가에 의한 검수 과정의 도입이 필요할 것으로 사료된다. 이 연구의 결과는 향후 산림복원사업 시 식생 도입 및 사후관리의 방향설정에 도움이 되는 자료로 활용될 수 있을 것으로 판단된다.
        4,800원
        3.
        2019.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        토목이나 건축공사와는 달리 조경분야의 프로젝트는 공정상의 특수성으로 인해 BIM 도입이 이루어지지 않고 있다. 그러나 인접 분야인 건축, 토목 공사에서 BIM은 보편화 되고 있으며, 이를 고려할 때 향후 조경분야에서도 BIM 환경구축 및 도입은 필수적일 것이다. 특히 조경 BIM의 공종 도출에 관한 연구는 거의 이루어지지 않은 상태로, 향후 조경분야 BIM 도입을 위해서는 조경 BIM 세부 공종 도출에 관한 연구가 필요하다. 이에 본 연구는 조경 BIM 도입 가능성의 검토와 세부 공종 도출을 통해 조경 BIM 도입을 위한 기초자료를 마련하고자 하였으며, 이를 위해 문헌 연구와 전문가 인터뷰를 실시하였다. 연구결과 조경분야의 BIM 활용 방안 및 향후 발전 방향에 관한 내용이 도출되었다. 또한 대지분석 BIM, 공간계획 BIM, 조경요소계획 BIM의 3개 분야로 나뉜 조경 BIM 공종을 도출하였으며, 각 공종 분야는 다시 총 7개 부분의 31개 요소로 세분화되어 조경 BIM 세부 공종 내용이 도출되었다. 향후 본 자료를 바탕으로 국내 조경 프로젝트에 BIM을 도입하여 효율적인 조경 프로젝트 수행에 기여할 수 있을 것으로 기대된다.
        4,000원
        4.
        2015.12 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        감정평가 방식은 크게 3가지로 구분된다. 원가법 및 적산법 등 비용성의 원리에 기초한 감 정평가 방식인 원가방식, 거래사례비교법, 임대사례비교법 등 시장성의 원리에 기초한 감 정평가방식인 비교방식과 수익환원법 및 수익분석법 등 수익성의 원리에 기초한 감정평가 방식인 수익방식이다 이러한 건물의 현존가치 평가는 소송에 의한 경우 법원으로부터 감정인으로 지정된 법원감 정인들에 의해서 수행되고 있다. 감정평가사들에 의해 행해지는 대출 등의 소송 외적인 목 적으로 건물의 현존가치를 평가(이하 ‘사감정’이라 한다) 하는 경우에는 많은 연구와 세부적 인 평가기준이 있다. 그러나 법원감정에서는(유익비 등을 산정하기 위한 건물의 현존가치를 평가하는 경우 등) 평가 대상과 목적에 맞는 합리적인 방법이나 기준이 없어서 사감정의 관 련규정을 준용하거나, 감정인의 주관적인 판단에 의해서 감정평가가 진행되고 있다. 그로 인하여 건물의 현존가치 평가 결과는 평가하는 감정인에 따라서 많은 차이가 나고 있다. 이 와 같이 감정에 대한 객관적인 기준이 없이 감정인 마다 각자의 기준으로 현존가치를 산정 함으로써 감정의 신뢰성 및 효율성이 떨어지게 되고 이를 증거로 채택하게 되는 재판의 결 과에 대하여 당사자의 입장에 따라서는 감정의 결과를 불신하게 되어 재 감정을 요구하거나 감정평가자를 상대로 손해배상을 청구하는 등 강한 불만을 갖는 경우가 많다. 건물의 가치평가 중에서도 소송에 관련된 특수성이 있는 유익비 등을 산정하기 위한 평가 에서도 감정기준이나 방법에 대한 연구가 부족하여 감정인에 따라서 다양한 평가방법으로 건물의 현존가치를 평가하고 있다. 건물의 가치를 평가하는 방법 중에서 복성식평가법을 적용하는 경우에는 건물의 내용연수에 따른 감가수정을 통하여 건물의 가치를 평가하게 된 다. 이러한 경우에 합리적인 건물의 내용연수의 산정이 가치평가에 중요한 요소가 된다. 특 히 법원 감정의 경우에는 건물 전체의 내용연수도 중요하지만, 각 공종별 내용연수 및 잔 존내용연수를 산정하는 방법 및 기준이 필요하다. 이러한 법원감정의 현실을 반영한 각 공종별 내용연수 및 실용내용연수 산정 방법에 대한 기준 등에 많은 문제점을 파악하고, 실무에 활용할 수 있는 각 공종별 내용연수 및 실용내 용연수 산정 방법에 대한 기준을 제시하였다
        7,800원
        5.
        2014.11 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        5,700원
        6.
        2014.09 구독 인증기관·개인회원 무료
        현재 건설 산업의 프로세스는 2D기반으로 설계, 시공, 유지관리 등 시설물의 총 생애주기 동안 관리 및 시행 주체가 상이하다. 또한 건설 산업 참여주체들은 전문성에 따른 독립된 작업으로 인해 총 생애주기 동 안 건설정보의 전달방법의 통일성이 부족한 상황이다. 이러한 정보단절로 인해 건설 산업의 생산성은 타 산 업과 비교해 낙후되어 있는 실정이다. 이러한 문제점을 극복하기 위해서는 건설 공종정보의 DB화 및 이를 활용하여 4D, 5D, nD-BIM 구현이 가능하도록 표준화된 BIM기반의 건설정보 분류체계가 필요하다. 이를 위해 국내·외 건설산업에서는 BIM기반의 설계/시공/유지관리의 건설 전 생애주기 단계에서 보다 효율적인 업무수행과 성공적인 프로젝트 성과를 위해 다양한 연구개발 및 정책도입이 진행되고 있다. 본 연구에서는 고속도로공사의 시범설계로 각 공종별 BIM설계를 수행 하고, 기존의 2D설계와 BIM설계의 물량차이를 비교 하고, 향후 토목BIM의 발전을 위해 BIM설계의 신뢰성을 분석하였다. 설계단계-BIM(Building Information Modeling)의 근간이 되는 물량산출의 접근성에 있어서 BIM에 대한 국내외 건설 산업의 신뢰도가 만족할 만한 수준은 아니다. 토목분야보다 10년가량 먼저 BIM 도입이 추진된 건축분야에서도 물량산출의 접근성 측면에 있어서는 비정형 구조물에 대한 시각화 정도에 머무르는 수준이 다. 국내 건축분야에서는 이미 단계적으로 BIM 납품의무화가 추진되고 있는 반면 토목분야는 BIM 도입의 초기단계임에도 불구하고 향후 3~4년 내 BIM 납품의무화를 위해 여러 공공기관에서 BIM 납품의무화 도입 을 준비 중에 있으며, BIM 납품의무화 시행을 위한 사전준비로서 부분적인 BIM설계 도입을 진행 중에 있다. 이에 본 연구에서는 BIM 도로설계를 시행하기에 앞서 기존의 2D기반 물량산출 결과와 BIM기반 물량산 출결과의 오차를 비교·분석하여 그 신뢰성을 분석하고, 향후 시행될 BIM설계의 확대 적용을 위한 기초자 료로 제공하고자 한다. 이를 위해 도로공사에 필요한 공사 중 구조물공인 교량공, 터널공, 옹벽공, 배수공, 부대공과 비구조물공인 토공, 포장공 등을 대상으로 신뢰성 분석결과를 제시 한다. BIM설계와 2D설계간의 물량 비교를 위해, 도로구간 중 이설도로, 부채도로, 확장부 등 기존도로는 제외 하고 본선 및 램프구간 토공 BIM 모델링을 수행하였으며, 교량은 확장교량의 기존교량은 형상만을 구현하 였으며 그 외의 모든 교량은 BIM으로 모델링하여 물량을 산출하였다. 터널은 모든 터널을 대상으로 BIM 모 델링을 수행하여 물량을 산출하였다. 배수공은 측구, 배수구조물, 암거 등 모든 배수공을 대상으로 BIM 모 델링을 수행하는 동시에 한국도로공사 배수공 표준도 적용하여 물량을 산출하는 방식으로 진행하였다. 옹벽 은 L형옹벽, RC옹벽, 프리케스트옹벽 등을 BIM 모델링을 통하여 물량을 산출하였으나 보강토 옹벽은 BIM 모델링을 통한 물량산출이 곤란하여 형상만을 구현하고 물량산출은 기존의 2D방식으로 진행하였다. 포장공 은 도로 토공구간과 연계된 사항으로 도로구간 중 이설도로, 부채도로, 확장부 등 기존도로는 제외하고 본 선 및 분기점, 터널 등을 대상으로 BIM 모델링을 수행하였다. 부대공은 표지판 등 부대 시설물에 라이브러 리를 구축하였으며, 이를 통합 모델링에 구현하여 부대시설 계획도에 반영함에 있어 향후 자동화 프로그램 개발 이후에 적용하는 것으로 업무를 합리화하였다. 모델링을 통한 BIM 물량과 기존 2D기반의 물량과의 오 차를 비교·분석함으로써 BIM 설계의 신뢰성과 우수성을 검증하였다. BIM기반의 물량산출 방식은 다양하 지만 본 과업에서는 여러 가지 BIM Tool 중에서 터널, 교량 등 구조물공은 Autodesk사의 Revit을 토공과 같이 지형 및 선형에 영향을 받는 비구조물공은 Autodesk사의 Civil3D를 적용하여 BIM 모델링 및 물량산 출을 진행하였다.
        7.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        4,600원