This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.
This study presents the new dispatching rules of job shop scheduling with unbalanced machine workloads to decrease mean flow time and mean tardiness. The proposed dispatching rules consider the information related to work remaining, modified job due dates, modified operation due dates and machine workload. The performance of the new dispatching rules is compared and analyzed with the existing rules through the computer simulation at different levels of workload imbalanced. The results can be useful to the researchers and practitioners of job shop scheduling with unbalanced machine workloads.
This paper deals with the problem of scheduling jobs and rate-modifying activities on parallel machines, motivated by a problem commonly found in the surface-mount technology of electronic assembly lines. A rate-modifying activity involving repair, maintenance and readjust is an activity that changes the production rate of equipment under consideration. In this paper, the processing time of a job scheduled before the activity is equal in each parallel machines. On the other hand, if the job is scheduled after the rate-modifying activity than the process time depends on the modifying rate of the activity. Our purpose is to schedule the rate-modifying activities and jobs to minimize the makespan on parallel machines which is NP-hard. We propose a branch and bound algorithm to solve medium size problems optimally. Also we develop three heuristics, Modified Longest Processing Time (MLPT), MULTIFIT and COMBINE algorithms to solve large size problems.
The main objective of this paper is to search whether containment vessel's best pressure may increase until how long when loss of coolant accident (LOCA) happened in containment vessel of Ulchin nuclear power plant 1 and 2. Another goal of this research is to find the influential factors that increase containment vessel pressure. Model for this research is Ulchin nuclear power plant 1 with 10 cycles. Data were collected by simulator of Ulchin nuclear power plant 1 and design of experiment was used for data analysis. For the experiment, seven factors that are going to influence in containment vessel pressure were chosen. It was found that fatter which influences in early rise of containment vessel pressure after LOCA is only explosion size. Also, containment vessel's best pressure (3.74 bar.a) was much lower than limit (4.86 bar.a) of FSAR (Final Safety Analysis Report).
This study relates to the architectural planning principle of Gyeonghoeru pavilion, one of the major buildings in Gyeongbokgung palace. The study is concentrated on The Book of Gyeonghoeru Pavilion written by Jeong Haksun in 1865 during the reconstruction of Gyeonghoeru pavilion. The architectural planning principle of Gyeonghoeru pavilion disclosed in The Book of Gyeonghoeru Pavilion appears to be 'the method of expanding with six by six system'. 'The method of expanding with six by six system' means a way of continuously extending the number related to 6 by addition, subtraction, multiplication and division, and reflecting to architecture, having number 6 as the basic number. Number 6 means a large amount of water in East Asian philosophy, Applying 'the method of expanding with six by six system' to the architecture of Gyeonghoeru includes an intention to prevent fire in a way of a type of incantation because Korean traditional wooden buildings are we to fire. Since Gyeonghoeru is surrounded by a pond and was constructed based on the number 6 having a strength of water, it was believed that it could be safe from fire. This study compares the contents disclosed in The Book of Gyeonghoeru Pavilion with the construction of Gyeonghoeru to find out how the number 6 was applied to the overall construction of Gyeonghoeru. From the fact that the total number of km of Gyeonghoeru is 36 ($6{\times}6$), the number of pillars is 42 ($6{\times}7$), and the number of windows and doors is multiples of 6, it has been found out that the number 6 is deeply related to the overall construction of Gyeonghoeru. In addition to the fact that the construction of Gyeonghoeru can be explained by 'the method of expanding with six by six system', The Book of Gyeonghoeru Pavilion also discloses parts where Diagram of Hotu, Later Heaven Arrangement and Arrangement of 64 Hexagrams are applied. Therefrom, it has been found out that Gyeonghoeru pavilion was constructed by applying the principles of East Asian philosophy based on The Book of Changes.
본 연구는 외식산업을 대상으로 6시그마에서 사용하는 프로세스 개선의 접근방식과 그 통계적 기법을 활용하여, 고객만족의 핵심요인 중의 하나인 음식 맛의 일관성을 구현하는 방안을 제시하고자 하였다. 연구방법으로는, 프로세스 개선을 위한 6시그마 로드맵 DMAIC(Define, Measure, Analyze, Improve, Control) 방식을 사용하였고, 연구대상은 단체급식에서 사용하는 특정 메뉴를 중심으로 하였고, 관련 데이터는 해당 기업에서 실험한 자료와 전문가 집단을 대상으로 한 Brainstorming, Matrix 분석기법, 그리고 상관분석과 t-test 등을 통해 특정메뉴(돈육고추장볶음)의 조리작업에 필요한 구성요소 -식재료 및 조리방법-를 제시하고 이들 중에서 가장 적합한 맛을 만들기 위한 최적의 조합을 도출한 결과, 해당메뉴의 양념을 구성하는 마늘, 고춧가루, 참기름의 구성비가 제시되었다. 이 외에도 조리방식과 비용 측면에서도 최적의 조건을 도출함으로써 음식 맛의 개선과 품질관리의 일관성 방안이 제시되었다.
As today's business environment becomes more globalized and distributed, the importance of collaboration is rapidly increasing. This paper presents a systematic approach to collaboration strategy planning. The framework suggests that a Collaborative Proce
This paper presents the application of integrated mathematical programming approach for the design of cellular manufacturing. The proposed approach is carried out in two phases: The first phase concerning exceptional elements(EEs) in cell formation and th
A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.
As today's business environment becomes more globalized and distributed, the importance of collaboration is rapidly increasing. This paper presents a systematic approach to collaboration strategy planning. The framework suggests a Collaborative Process Map need to be identified. Then, Collaboration Maturity of each area is evaluated. Based on the Collaborative Process Map and Collaboration Maturity Evaluation, Collaboration Execution Plans are established. A case study of semiconductor industry is also provided.
This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.
This study presents the new dispatching rules of job shop scheduling with unbalanced machine workloads to decrease mean flow time and mean tardiness. The proposed dispatching rules consider the information related to work remaining, modified job due dates, modified operation due dates and machine workload. The performance of the new dispatching rules is compared and analyzed with the existing rules through the computer simulation at different levels of workload imbalanced. The results can be useful to the researchers and practitioners of job shop scheduling with unbalanced machine workloads.
A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.
The purpose of this paper is the study on the piazza plan of basilica S. Pietro. The results of study are as follows: 1. The piazza of the basilica S. Pietro was planned in relation to building-piazza-symbol of interior piazza-street as city planning characteristic of Baroque and architectural characteristic of elliptical piazza form. 2. The function of piazza of basilica S. Pietro was planned for religious meeting of a grand scale than a piazza for the common run of people. 3. In general, the disposition, ground, elevation and section plan of the piazza of basilica S. Pietro was planned by principle of spatial and formal composition, according to axis, symmetry, proportion, division and contrast. 4. The location, scale, shape of piazza for disposition and ground plan of the piazza of basilica S. Pietro was basically decided by not only elements of Basilica building, Vatican Palace, Street and Walls of surroundings with axis of the Basilica building, but Fountain and Obelisk as existing constituent elements. 5. The elevation of the piazza of basilica S. Pietro was composed of boundary that was enclosed from wall of trapezoid piazza and gallery of elliptical piazza with equal height as symmetry. And the section plan was planned to approach into the Basilica through slope and stairs of gentle angle, utilizing of existing land form.
This study presents the new dispatching rules of job shop scheduling with auxiliary resource constraint to improve the schedule performance measures related to completion time and due dates. The proposed dispatching rules consider the information of total
크로스도킹은 물류센터의 운영 개념으로써 입고트럭에 의해 배달된 물품이 재고로써 보관됨이 없이 즉시 고객의 수요에 따라 재분류되어 출고트럭에 적재되어 고객에게 배달되는 프로세스로 구성된다. 본 연구에서는 임시보관 장소를 보유한 크로스도킹 시스템의 총 운영시간을 최소화하기 위한 입고 트럭과 출고 트럭의 일정계획 수립을 위한 수학적 모델을 개발하였다. 본 연구에서 개발한 모델의 적용으로 물류센터 내에서의 자재 취급 빈도 및 시간이 감소하여 제품 손상을 최소화
This study deals with the procedure of safety improvement, productivity increase ,and tact-time reduction through setting up the system about preventive maintenance. Actually, it is hard to establish and carry out preventive maintenance, even though we recognize the importance of the system concerning time, cost, labor, and so forth. In this study in the viewpoint of cost we are for achieving maximum efficiency by change and reduction of planning process adapted to the special work group. At first we briefly will mention the kind ,the necessity ,and the concept of preventive maintenance ,and then divide the equipment used in the assembly line into the two whether it is necessary or not by way of estimating the breakdown loss ,comparing with general establishment of preventive maintenance and modifying it to the case. At the second step we will establish the operation system of plan management related to production and quality in the special case. Check period and category will be set by dividing the assembly equipment into LCL and Focus in the third step. The forth step will contain the operation procedure in detail. And then we must make check and repair record periodically. Finally, on the basis of the record the selection of checking of significance will be conducted. This results in safety improvement, tact time reduction, and productivity improvement.
As for the purpose of this study, education facilities must be considered by a change of an education facilities equipment acid education system and aromatic character of an educational policy with a means to support to efficiently proceed education by study about a plan of the school education facilities which considered safety. That is, education facilities must become maintenance on design construction according to education action character and goal. This is not for a function of education to be decided according to education facilities, and education facilities must be decided so that adjustment can do an education function. The student center, a student are convenient, and an actor must do a plan of education facilities with an usable physical space contrariety, future directivity. As for the plan of school education facilities, facilities must be designed on functionality, an economy, flexibility, aesthetic appreciation anger, a foundation of stability for this so that objective of education realization is easy.