Flexural capacity of a Textile Reinforced Mortar(TRM) was investigated by an experimental study. The test program was accomplished on reinforced concrete(RC) slabs consisted of concrete(average compressive strength of 22.23 MPa) and rebar(strength class of SD400). RC slab had 450 mm and 150 mm in size and 2,600 mm in clear span. Strengthening was accomplished by applying carbon-fiber mesh in layers of mortar. Control slab(unstrengthened) and six slabs strengthened with TRM were fabricated to confirm the reinforcing performance in this study. Test variables considered amount of reinforcement and use of anchorage. As a results, it was validated that the flexural capacity of slabs strengthened with TRM increased from 159.9% to 285.2% according to the amount of TRM compared with unstrengthened slab. Experimental results indicated that there are increase in ductility as well as load carrying and deformation capacities when using multiple layers of textile.
외부비용은 재화나 서비스가 생산 또는 소비되는 과정에서 제3자에게 부과되는 비용이다. 원자력 발전을 통한 전력생산에 도 외부비용이 발생하며 이들에 대한 연구가 1990년대부터 진행되어 왔다. 비용은 정책결정에 중요한 요소로 전력 생산에 대한 비용 비교를 위해 외부비용이 고려되고 있다. 핵연료주기에서도 선택에 따라 다른 외부비용이 발생되지만 이에 대한 연구는 진행되고 있지 않다. 본 연구에서는 핵연료주기 외부비용 평가 방법 개발을 위해 원자력 발전에 대한 외부비용 평가 방법을 조사하고 분석하였다. 후쿠시마 사고 이전에는 외부비용 연구들은 정상 운전 상태에서의 손상 비용에 초점을 두었 다. 그러나 사고 이후 사고비용이 주요 주제가 되었다. 사고비용을 포함한 외부비용 범위는 여러 연구들에서 다양하게 사용 되었으며 범위에 맞춰 다른 방법들이 적용되었다. 본 연구에서는 이러한 결과들이 비교되었으며 핵연료주기에 따른 외부비 용 추산에 방법적 적용성 판단을 위해 분석되었다.
국내 원자력발전은 현재 두 번째로 큰 전력 공급 방법이며 원전의 수 역시 증가되는 것으로 계획되어 있다. 그러나, 원자력발 전에 의해 발생되는 사용후핵연료에 대해서는 아직 명확한 관리 정책이 확립되어 있지 않다. 원자로 이 후 핵물질 흐름과 관 련된 후행 핵연료주기는 사용후핵연료 관리를 위한 기술들의 집합이다. 따라서, 사용후핵연료 관리 정책은 핵연료주기 선택 과 함께한다. 핵연료주기 선택의 중요 항목은 경제성으로 이는 사적비용과 함께 외부비용을 더해 결정되어야 한다. 직접비용 인 사적비용과 달리 간접비용인 외부비용에 대한 연구는 원전에 집중되어 있으며 핵연료주기에 대한 연구는 없는 상황이다. 본 연구에서는 핵연료주기에 적용할 수 있는 외부비용 항목들을 도출하고 정량화를 시도하였다. 핵연료주기 외부비용 평가 를 위해 고려될 수 있는 핵연료주기로 OT(직접처분), DUPIC(PWR-CANDU 연결), PWR-MOX(PWR 습식재처리), Pyro-SFR (파이로 처리와 고속로 연계)의 네 가지를 선정하였다. 원자력발전의 외부비용 평가에 고려되었던 항목들을 분석하여 핵연 료주기에서 에너지 공급 안보비용, 사고위험비용과 수용성 비용을 외부비용 항목으로 도출하고 추산하였다.
The industrial accident rate has been steadily decreased by making all efforts for the prevention of accidents after enacting Occupational Health and Safety Act in 1981. However, ordinary typed industrial accidents still occur in small and medium sized enterprises(SME). Timely Technical Guidance(TTG) project of Korea Occupational Safety & Heath Agency(KOSHA) for SME's was initiated to visit and provide the analysis and control of industrial accidents by the staffs of KOSHA as soon as possible after accidents occurred. This study is conducted to analyze the questionnaire survey for employers, workers and TTG personnel of KOSHA with being evaluated positively whether the demonstration project of TTG has been executed consistently. However, it is suggested that the understanding of TTG project and legal support are necessary for the establishments, and the development of a variety data and lots of available contents is necessary to increase satisfaction of the TTG project. The accident rate of SME's which are employed less than 50 workers is expected to be largely decreased with applying the control and improvement over this study with maintaining and developing TTG technology.
This study was conducted to compare the value of the working environment measurement with the expected exposure value drawn by using a program, thereby going to investigate whether it is available to the risk assessment of domestic workplace. We used the ECETOC TRA program which is one of the exposure predictive models. Four kinds of substances were measured in two workplace which was exposed to organic solvents and one kind of substance was measured in three workplace which was exposed to dusts and then an exposure assessment of chemical risk factors was conducted. The result value of the working environment measurement, solid substance exceeded standard in one site, and it was found that the other solid and liquid substances were within the standard. The value of the exposure assessment program showd the same result; it was higher than the value of the working environment measurement, suggesting that due to its nature, the exposure assessment program is run only on the worst situation. Therefore, it was found that when the exposure assesment program is used, variables should be substituted only after accurately assessing the workplace and it is a good idea to assess the risk beforehand with the exposure assessment program in the case of the workplace which employs no more than 5 people and where it is hard to assess the working environment.
This study is aimed to investigate the occupational safety and health management of contractor company in the car industry. The questionnaire survey was conducted on the suppliers and contractors of car industry. Data were collected from 10 contractor companies and their 291 contractor companies(each outside and inside company). From the survey result, it was found that the level of all-round safety and health management is above the average. To strengthen the relationship for safety and health management, it is needed that the supplier company employ the person in exclusive charge to support contractor. Also it is needed the active support of the contractor company and needed that the supplier company employ the person in exclusive charge to support contractor. Finally, Many of the problems associated with the safety and health management by strengthening contractor company responsibility will have to be solved simultaneously.