검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 22

        1.
        2024.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As the complexity and uncertainty of international construction projects increase, the importance of risk management capabilities in the construction industry has become more pronounced. Accordingly, Enterprise Risk Management (ERM) has become a widely adopted approach among organizations as a new way for more effective risk management. Despite its growing application, research related to ERM is still in its infancy, and most of the existing studies have been limited to financial industries. Therefore, this study aims to empirically examine the influence of ERM’s core elements on project risk management (PRM) and project performance within construction firms. Our findings indicate that the key ERM components—organization, policy, and culture—significantly enhance PRM processes, underscoring their critical role and importance. Additionally, effective PRM positively affects project outcomes, highlighting its significance for construction companies engaged in international projects. While ERM does not directly impact project performance, it indirectly improves outcomes through enhanced PRM capabilities. It suggests that ERM will contribute to the firm’s performance by improving the firm’s PRM capability through policies and a risk-focused culture corresponding to the adopted ERM organization and system..
        4,600원
        2.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
        4,000원
        3.
        2022.10 구독 인증기관·개인회원 무료
        The decommissioning project of NPP is a large-scale project, with various risks. Successful implementation of the project requires appropriate identification and management of risks. IAEA considered risk management “To maximize opportunities and to minimize threats by providing a framework to control risk at all levels in the organization”. Framework-based risk management allows project managers to identify key areas in which action should be taken at an appropriate time. Also, it enables effective management of projects by supporting decision-making on sub-uncertainty. Risk could be categorized according to the source of the risk. This is called Risk Breakdown Structure (RBS), and is documented as a risk assumption register through a risk identification process. IAEA considers various factors when defining risks in accordance with ISO 31000:2009. IAEA SRS No.97 presents a recommended risk management methodology for the strategy and execution stage of the decommissioning project of nuclear facilities through the DRiMa project conducted from 2012 to 2015. The risk breakdown structure classified in DRiMa project is as follows: (1) Initial condition of facility, (2) End state of decommissioning project, (3) Management of waste and materials, (4) Organization and human resources, (5) Finance, (6) Interfaces with contractors and suppliers, (7) Strategy and technology, (8) Legal and regulatory framework, (9) Safety, and (10) Interested parties. They have various prompts for each category. Such a strategy for dealing with risks has negative risks (threats) or positive risks (opportunities). The negative risks are as shown in avoid, transfer, mitigate and accept. On the other side, the positive risks are as shown in exploit, share, enhance and accept. During the decommissioning, a contingency infrastructure is needed to decrease the probability of unexpected events caused by negative risks. The contingency infrastructure of decommissioning project includes organization, funding, planning, legislation & regulations, information, training, stakeholder involvement, and modifications to existing programs. Since all nuclear facilities have different environmental, physical or contamination conditions, risks and treatment strategies should also be applied differently. This risk management process is expected to proceed at the stage of establishing and implementing a detailed plan for the decommissioning project of each individual plant.
        4.
        2018.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project’s overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, ‘communication and broadcasting devices’ and ‘IT and communication based devices’ generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.
        4,200원
        6.
        2016.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.
        4,000원
        7.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total accident rate in the construction industry is a very meaningful reduction to establish a comprehensive disaster reduction measures, including through the Survey, the disaster prevention projects whilst driving status and problem analysis in order to reduce the mature workers in the construction industry is growing rapidly in all disaster disasters (share) The days. It is urgent to establish a framework and measures that can identify the specific cause for this than for the middle-aged workers and disaster reduction in disaster reduction efforts, which continue to increase. Used as measures of information and data presented in the basic requirements of mature workers also been.
        4,000원
        8.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Share of total accidents in construction accidents construction site accident 70% of small embroidery Reducing the rate of Construction of the entire construction accidents decreased overall is a very meaningful work. Disaster reduction continues to increase despite the efforts of a small construction site(Amount less than 2,000,000,000) for Disaster Reduction In order to identify more clearly the cause of the system and provide the urgently needed measures.
        4,200원
        9.
        2013.11 구독 인증기관 무료, 개인회원 유료
        최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 위험 관리 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 탐색개발 및 체계개발 단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 위험 관리 활동을 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 시 위험관리에 대한 투자를 통해 전체 프로젝트의 기간 단축 및 비용 절감과 안전성 확보를 개선시킬 수 있을 것으로 기대된다.
        4,200원
        10.
        2013.10 구독 인증기관·개인회원 무료
        The project-based business companies usually have much interest in predicting the expected finish date and related probability of project completion to refer at their proposals for projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, then performing risk assessment with Monte-Carlo simulation method. However, since these approaches cannot reflect various schedule constraints, the project managers cannot prepare for the project risks in advance of their. This paper proposed a methodology for predicting project schedule risk by identifying and enforcing the constraints which may occur in a storage tank engineering and construction project environment. We applied our approach to a storage tank construction project to validate its feasibility. By using the methodology proposed in this paper, the project schedule risk can be evaluated and predicted more accurately and practically than the PERT/CPM or Monte-Carlo simulation approach.
        11.
        2013.05 구독 인증기관·개인회원 무료
        In this paper, a mathematical model is developed for finding a degree of influence of risks affecting the project. At risk identification step, all risks are structured in forms of block diagrams after risks of project activities are identified. At risk analysis step, reliability functions are derived based on block diagrams of risks. Reliability function represents the probability of the project success. Based on the derived reliability functions, risks importance is defined as a criterion for expressing a degree of influence of each risk affecting the success of the project, which is. Risks importance includes the structural importance of risk, the probability of risk, and the impact of risk. It could be applied to determine the priorities of risks which should be controlled, and the use of such priorities could guarantee successful project activities. Finally, examples of the proposed mathematical models will be given.
        12.
        2011.10 구독 인증기관·개인회원 무료
        In the project management context, the impotance of risk management is increasing because the risks in terms of time and cost may significantly affect the result of the project. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, then performing risk assesment with monte-carlo simulation method. However, these approach can not reflect constraints, which may be occurred during the project execution, and cope with uncertainty in the future. As these constraints may affect time and cost which are the crucial evaluation factor to the project, they must be identified and evaluated to manage the future project risk before the project is started. This paper proposes a methodology for project schedule risk management by identifying and enforcing the constraints which may be occurred in complex and uncertain project environment. First, project risk constraints are identified and categorized into time, dependancy, and branching. Then, project schedule model with constraints is converted to CPN(Colored Petri Net) which can represent all the identified constraints to assess and predict schedule risk. Finally, the expected risk of the project (in terms of time and cost) is assessed and predicted by performing Petri Net simulation. By using the methodology proposed in this paper, the risk in terms of time and cost in project schedule model can be assessed and predicted more accurately and practically than the PERT/CPM and/or Monte-carlo simulation method. Furthermore, the constraints, which may occur unexpectedly after the project launch, can be evaluated to determine the schedule risk. The expected risk can be used to decide whether risk mitigation or project termination process undertake.
        13.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there
        4,200원
        14.
        2010.05 구독 인증기관 무료, 개인회원 유료
        고령 인구의 증가와 고도의 산업화에 따른 환경 질환 및 생활 습관성 질병의 증가, 산업 재해 및 교통 재해의 꾸준한 증가에 따라 지속적인 의료산업 시장의 확대가 예상되고 있다. 그에 따라 인공 스텐트, 촬영장비, 인공 관절 등 대규모 개발 프로젝트가 국내 많은 업체에서 이루어지고 있다. 대규모 개발 프로젝트가 수행됨에 따라 프로젝트에 내재된 위험요인들이 기하급수적으로 증가하게 되고 그러한 위험요인을 사전에 파악하고 대응하지 못함으로 인하여 많은 프로젝트 들이 중지되거나 실패로 끝나는 사례들이 실제로 많이 발생하고 있다. 이러한 의료기기 개발 프 로젝트의 실패율을 줄일 수 있는 한 가지 방법은 프로젝트 이해 당사자들이 직면하여 있는 주요 위험 요인들을 정의하여 인식하고, 일정한 허용 한계 내에서 적절히 관리하는 것이다. 본 연구는 국내 의료기기 개발 프로젝트의 성패의 열쇠를 쥐고 있는 위험요소에 관한 연구로서 PMBOK의 위험 관리의 정의를 명확히 하고, 기존 문헌을 통하여 프로젝트에 영향을 미치는 위험요소에 대하여 파악하고 의료기기 개발 프로젝트에 영향을 미치는 위험요소를 확인하고 그 우선순위를 파 악하여 프로젝트 전 단계에 걸쳐 파악된 위험요소를 실제 개발에 적용하여 위험으로 인한 프로젝트의 실패 확률을 줄이는 데에 그 목적이 있다.
        4,000원
        15.
        2010.05 구독 인증기관 무료, 개인회원 유료
        한국 주식시장은 외국인 투자자들이 매수하면 주가가 오르고 그들이 매도하면 주가가 하락하는 현상이 가장 큰 특징 중의 하나가 되었다. 본 논문은 한국 주식시장의 주도세력이면서 가장 높은 수익률을 창출하는 외국인 투자자의 매매동향을 검토하고 그들의 매매패턴을 이용해 리스크를 회피하며 손실을 최소화하는 방안을 검토해 이를 실제적으로 주식시장에 실증적으로 적용한 연구이다. 본 논문은 코스닥 시장을 기준으로, 월간 기준 수십억 수백억으로 매수해 들어오는 외국인의 매매동향 데이터에 대한 실증적인 분석을 통해 리스크 회피 프로세스를 정립하고자 하였다. 구체적으로는 1)외국인의 순매수대금이 20억 이상인 종목 가운데 2)외국인의 지분증가가 크고 3)순매수율이 높을수록 리스크 발생 가능성이 현저하게 줄어듦을 확인하고 동시에 안정적인 수익을 낼 수 있는 실제적인 가능성이 매우 높게 나타남을 확인할 수 있었다. 이 논문의 의의는 개인투자자들도 외국인의 매매동향을 잘 분석하고 이용하면 리스크 발생을 최소화하면서 동시에 그들보다 안정적인 투자가 가능하다는 것을 보여줬다는데 있다.
        4,000원
        16.
        2009.05 구독 인증기관 무료, 개인회원 유료
        최근 정부와 기업에서는 종이서류 없는 무역환경 자동화를 통해 글로벌 경쟁력 강화에 중요하게 인식하고 있으며, 이에 전자무역 시스템 개발 프로젝트는 증가하고 있다. 정보시스템 프로젝트의 위험관리 연구는 지난 20년 넘게 수행되어 왔으며, 이에 전형적인 위험 요인 목록을 도출한 연구 결과가 문헌을 통해 많이 제시되었다. 본 연구에서는 이러한 정보시스 템 프로젝트의 위험요인 문헌 연구를 통해 전자무역 시스템 개발 프로젝트 환경에 맞는 위험요인 목록을 도출한다. 정보시스템 개발의 범위를 전자무역 시스템으로 한정하여 프로젝트 위험요인을 연구한 것에 의미를 갖는 본 연구는, 향후 발생할 전자무역 시스템 개발 프로젝트 실패를 줄이고 성공 가능성을 높임으로써 프로젝트 수행을 성공으로 이끄는 데 도움이 되고자 한다.
        4,000원
        17.
        2005.05 구독 인증기관 무료, 개인회원 유료
        미래는 어쩔 수 없이 불확실하다. 더욱이 현대 프로젝트의 다국적화, 거대화, 복잡화 현상은 프로젝트 성공과 관련된 미래 예측을 더욱 불확실하게 만들고 있다. 이러한 불확실성의 증가 현상은 모든 산업에 있어서 일반적인 것이며, 결과적으로 리스크에 대한 관리의 필요성을 더욱 증폭시키고 있다. 관리되지 않은 프로젝트 리스크는 프로젝트의 실패의 원인이 되며, 나아가 조직의 위기로 발전된다. 따라서 프로젝트 리스크는 프로젝트 팀을 포함한 전체 조직 차원에서 관리되어야 한다. 본 연구에서는 프로젝트의 전반에 걸쳐서 체계적인 리스크 관리를 위해 프로세스를 중심으로 서술하였다.
        4,000원
        18.
        2002.05 구독 인증기관 무료, 개인회원 유료
        리스크 관리 실패는 기업 및 국가 경쟁력 약화 요인으로 작용하고 있으며 현재 선진 각 국에서는 리스크 경영시스템을 구축하고 도입함으로써 시각과 발상의 전환, 그리고 국면타개를 도모하고 있습니다. 이에 본 논문은 선진국에서 현재까지 진행되어 온 리스크 정책 개발 동향을 조사 연구하고, 선진국의 경우 정부적인 차원에서 어떠한 내용의 프로젝트를 수행하고 있는지 조사 연구하여 국내 기업 여건에 맞는 리스크 경영시스템 구축에 중요한 정보를 제공하고, 시스템 구축에 대한 방향을 제시하고자 합니다.
        4,000원
        19.
        2018.05 KCI 등재 서비스 종료(열람 제한)
        건설해체공사와 유사한 특성을 갖는 원전 제염해체공사에서 구조적 리스크 관리는 매우 중요하다(DOE). 하지만 제염해체작업 중 발생할 수 있는 구조적 재난재해 및 위험요소는 크게 고려하지 않고 있다. 이로 인해, 구조적 재난 및 재해에 의해 발생할 수 있는 작업자 리스크 역시 체계적으로 정립되어 있지 않다. 또한, 재난 및 재해 그리고 리스크 분류체계는 작업의 특성(작업프로세스, 활용장비, 작업 위치 등)별로 분류되어 있지 않아 실제 해체공사를 위한 매뉴얼로 활용하기에 무리가 있다. 따라서 차폐 콘크리트 구조물 제염해체공사의 건설해체공사와의 유사성을 기반으로 작업의 특성별로 분류한 리스크를 도출하는 것은 원자력 발전소 해체공사 리스크 관리에 필수적으로 판단한다.
        20.
        2018.01 KCI 등재 서비스 종료(열람 제한)
        미국프로젝트관리협회(Project Management Institute)에서는 리스크의 형태를 외부 리스크(External Risk)와 내부 리스크(Internal Risk)로 구분 하고 있다. 외부 리스크는 프로젝트에서 통제가 불가능한 리스크로 정책 및 관련제도 변화, 기후 및 자연재해, 환율 등이다. 내부 리스크는 사업 자체에 존재하는 리스크로, 프로젝트내부에서 통제가 가능한 항목들이다. 프로젝트 관리상의 기술적 위험은 비용, 품질, 시간, 안전, 환경이다. 따라서 건설프로젝트의성공적인 수행을 위해서는 외부 리스크와 내부 리스크를 모두 관리해야 하며, 특히 기술적 리스크 관 리를 통하여 시설물의 품질과 안전을 확보할 수 있다. 특히 다수의 시설물로 구성된 복합 시설물은 다수의 단위프로젝트로 구성되어 있고, 다 양한 참여주체 및 이해관계자간 갈등이 존재하기 때문에 잠재 리스크에 대한관리의 중요성이 대두되고 있으며, 리스크 관리의 부재는 사업 지 연 및 공사비 증가와 더불어 시설물의안전에도 부정적 영향을 미친다. 본 연구는 복합 시설물의 안전성 확보를 위한 사업관리 측면의 리스크관 리 프로세스 구축 방안의 제시를 목적으로 수행하였다. 이를 위해 리스크 관리 프로세스의 구축 절차를 제시하고, 각 단계별 활용 가능한 리스 크 정보로서, 건설프로젝트에 내재된 리스크의 유형 및 요인, 그리고 대응 전략을 제시하였다.
        1 2