검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 24

        1.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
        4,000원
        3.
        2022.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In addition to simply providing quality food to the people, the fishery industry must be maintained and developed because it has various functions such as national food security, preservation of natural scenery, protection of national territory, and revitalization of the local economy. However, risk factors such as climate changes and environmental destruction have raised concerns about the sustainable development of the industry. Since these risk factors are becoming larger and more complex over time, it is time to conduct research related to the risk of the fishery industry. Therefore, the purpose of this study is to explore the risk factors facing the fisheries at this point, to analyze the economic ripple effect of regional fishery product supply shortage, and to draw implications. As a result of this study, the economic ripple effect of fishery product shortage per won was highest in Busan, followed by Gangwon, Gyeongnam, and Gyeongbuk. Considering the size of the local fishery industry, Busan had the highest supply shortage per 1% of local fisheries production. It is also necessary to prepare special risk management and countermeasures for these regions since the effect of supply shortage in regions such as Jeonnam, Gyeongnam, and Jeju is large compared to other regions.
        5,400원
        4.
        2019.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 수중활동에서 나타나는 인체의 생리적 변화와 알코올 섭취로 인한 생리적 변화를 살펴보고 알코올 섭취가 스쿠버다이버에게 미치는 영향을 규명하는데 그 목적이 있다. 미국 내부통제연구소위원회의 내부통제 프레임워크를 기초로 본 연구에 적합하도록 새롭게 정립한 ‘리스크 평가 및 분석(RAA, risk assessment and analysis)’ 기법을 활용하여 알코올 섭취 전과 후의 리스크 분석을 실시하였다. RAA기법은 리스크 간 상관관계를 분석하는 1단계, 리스크를 정량화하고 리스크 데이터베이스를 구축하는 2단계, 그리고 이를 도식화하여 리스크맵을 분석하는 3단계로 이루어져 있다. RAA기법을 통해 알코올 섭취로 인한 수중활동의 리스크수준이 전반적으로 증가하여 고위험군의 비율이 높아진 것을 확인하였고 리스크수준의 정량화와 고위험군 분류를 통해 리스크관리 측면에서 우선통제대상을 지정할 수 있었다. 본 연구 결과는 알코올 섭취 후 행해지는 스쿠버다이빙의 위험성을 명확하게 알리고 이에 대한 스쿠버다이버들의 의식 개선을 도모하여 보다 안전한 스쿠버다이빙 환경을 제시할 수 있을 것으로 기대한다.
        4,000원
        5.
        2019.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The seismic safety of nuclear power plants has always been emphasized by the effects of accidents. In general, the seismic safety evaluation of nuclear power plants carries out a seismic probabilistic safety assessment. The current probabilistic safety assessment assumes that damage to the structure, system, and components (SSCs) occurs independently to each other or perfect dependently to each other. In case of earthquake events, the failure event occurs with the correlation due to the correlation between the seismic response of the SSCs and the seismic performance of the SSCs. In this study, the EEMS (External Event Mensuration System) code is developed which can perform the seismic probabilistic safety assessment considering correlation. The developed code is verified by comparing with the multiplier n, which is for calculating the joint probability of failure, which is proposed by Mankamo. It is analyzed the changes in seismic fragility curves and seismic risks with correlation. As a result, it was confirmed that the seismic fragility curves and seismic risk change according to the failure correlation coefficient. This means that it is important to select an appropriate failure correlation coefficient in order to perform a seismic probabilistic safety assessment. And also, it was confirmed that carrying out the seismic probabilistic safety assessment in consideration of the seismic correlation provides more realistic results, rather than providing conservative or non-conservative results comparing with that damage to the SSCs occurs independently.
        4,000원
        6.
        2018.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project’s overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, ‘communication and broadcasting devices’ and ‘IT and communication based devices’ generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.
        4,200원
        7.
        2017.12 KCI 등재 구독 인증기관·개인회원 무료
        The purposes of this study are to analyze risks of construction step BIM(Building Information Modeling) applied project and improve it. Recently, construction industry has emphasized an importance of BIM for efficient utilization of various information. In the whole life cycle of huge construction project, there are cases introducing BIM and projects applying BIM are gradually increased to the work of construction step. However, the process of communication is not established, so the contents of BIM process of construction step are just showing rough fields and concepts of working utilization, so it's restrictive to utilize BIM actively on constructions step. Through results of case study in this research, constructor risks of BIM business should be efficiently treated with Fuzzy-FMEA that is more precise than existing danger evaluation.
        9.
        2017.04 구독 인증기관 무료, 개인회원 유료
        The purposes of this study are to analyze risks of construction step BIM(Building Information Modeling) applied project and improve it. Recently, construction industry has emphasized an importance of BIM for efficient utilization of various information. In the whole life cycle of huge construction project, there are cases introducing BIM and projects applying BIM are gradually increased to the work of construction step. However, the process of cooperation is not established, so the contents of BIM process of construction step are just showing rough fields and concepts of working utilization, so it's restrictive to utilize BIM actively on constructions step. Through results of case study in this research, Construction company risks of BIM business should be efficiently treated with Fuzzy-FMEA that is more precise than existing danger evaluation.
        4,000원
        10.
        2017.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 벤처창업기업의 대표자 기술혁신역량과 경영진의 전문화, 기술사업 투 자계획의 타당성 등이 기업의 경영성과인 재무건전도와 나아가 부실화가능성에 미치는 영향에 대하여 구조방정식 모델(SEM)을 이용한 실증분석을 실시하였다. 본 연구는 2011년∼2012년 2 년 동안 1,419개 표본기업에 대한 기술보증기금 기술평가 전문가들의 현장평가 데이터와 기업 현황 조사정보 및 재무정보 등을 활용하였으며, 설립후 7년이내 기술력 기반의 벤처기업들 속성 상 ‘고위험⋅고수익’으로써 여타기업보다 부실화가능성이 높은 기업군인 점을 감안하여 이들 기 업을 연구대상으로 설정하였다. 분석 결과, 대표자의 풍부한 경험과 기술지식 등 기술혁신역량 과 경영진의 분야별 전문화를 바탕으로 한 체계적 조직운영, 그리고 적정규모의 기술사업 투자 ⋅재무관리 계획수립 및 합리적 추진 등을 통하여 기업의 성장성과 수익성 등 기업의 전반적인 재무건전도를 향상시키고, 나아가 단기적 부실화리스크도 감축시키는 것으로 확인되었다.
        5,600원
        11.
        2015.04 구독 인증기관 무료, 개인회원 유료
        최근 제품의 개발 주기가 지속적으로 단축되고 있으며, 많은 기업에서는 이에 따른 제품개발 프로세스의 혁신을 위한 노력을 끊임없이 하고 있다. 현재의 공학기술측면과 새로운 기술개발측면에서는 고객의 요구사항 분석, 기술개발 실현 등 많은 발전이 있 었지만, 제품의 안전성이나 신뢰성 측면의 기술 개발 속도는 여전히 더딘 실정이다. 이러한 문제점을 해결하기 위한 가속신뢰성시험 중에 초가속수명시험(HALT : Highly Accelerated Life Test)은 최단기간에 제품의 신뢰성을 확보 할 수 있는 신뢰 성시험 기법이다. 이에 따라 최근에는 대기업을 중심으로 HALT의 수요가 급격히 증 가하고 있다. 하지만 국내 연구소와 시험 서비스 기업에서 보유하고 있는 HALT 장비 는 매우 제한적이며, 대부분 수입에 의존하기 때문에 구입과 설치에 많은 비용이 필요 하다. 이러한 이유로 중소기업에서는 HALT 장비의 효과적 활용에 많은 어려움을 겪 고 있다. 정부에서는 이러한 문제점을 해결하기 위해 HALT 장비의 국산화 개발을 추 진 중이다. 본 논문에서는 HALT 장비의 안전성을 확보한 국산화 개발을 위해 리스크 분석 방 법을 조사해보고자 한다.
        4,300원
        12.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study was carried out to analyze water suspension in the water supply system through fault tree analysis. And quantitative factors was evaluated to minimize water suspension. Consequently the aim of this study is to build optimal planning by analyzing scenarios for water suspension.Accordingly the fault tree model makes it possible to estimate risks for water suspension, current risks is 92.23 m3/day. The result of scenario analysis by pipe replacement, risks for water suspension was reduced 7.02 m3/day when replacing WD4 pipe. As a result of scenario analysis by water district connections, the amount of risk reduction is maximized when it is connecting to network pipe of D Zone. Therefore, connecting to network pipe for D Zone would be optimal to reduce risk for water suspension.
        4,500원
        13.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        It is known that sewer problems are the major causes of road cave-in. The objective of this study is to analyze the risk of road cave-in due to storm sewer laterals. We investigated 174 storm sewer laterals using a zoom camera at O-dong area in Seoul. The causes of road cave-in were classified into five cases: breakage of rigid pipe, deformation of flexible pipe, out of pipeline alignment, changing pipe material or changing pipe diameter, and a poor linkage between lateral and sewer. In addition, all defects were sorted into five grades based on the severity rating at storm sewer laterals. In this study, the most fragile pipe materials were found to be concrete pipe and polyethylene pipe, which recorded 2.3 and 1.69 defect rates. With regard to the causes of road cave-in, deformation of flexible pipe has a large influence on road cave-in at present. On a long-term basis, the two causes, out of pipeline alignment and a poor linkage between lateral and sewer, could have more influence on road cave-in.
        4,000원
        14.
        2012.04 구독 인증기관 무료, 개인회원 유료
        사고방지 및 안전도모를 위한 안전관리 현황파악 및 통계적, 사례적 측면에서 리스크 분석을 통하여 대처방안을 마련하고, 다각적 구성을 통하여 설계한 안전관리 시스템에 관하여, 사고원인분석기법 중 F.T.A. 기법을 활용하여 안전관리 시스템을 평가하고 그 유효성을 밝히고자 한다.
        3,000원
        15.
        2011.11 구독 인증기관 무료, 개인회원 유료
        연안어선의 보안 사고 및 보안관리 현황을 분석하고 리스크를 저감할 수 있는 방안을 모색하고 연안어선 이용자를 대상으로 보안위혐요소와 취약성 조사를 실시하였다. 공경비 중심의 보안위협저감 대책에 부가하여 해양민간보안경비 제도 활성화 방안과 연안어선 보안사고 예뱡대응 시스템을 제시 하였다
        3,000원
        17.
        2010.05 구독 인증기관·개인회원 무료
        제품의 제제조에 관한 연구는 최근 녹색사업(green business)으로서 주목을 받고 있는 청정생산 중 재활용의 한 부분으로서 관심을 받고 있다. 본 연구의 목적은 리스크분석방법을 활용하여 재제조 가능성을 진단하는 실용적 기술을 개발하는 것이다. 본 연구에서는 재제조 설계과정에서 리스크평가를 지원하기 위해 각 프로세스의 안전수준을 반영할 수 있는 위험성분석표와 리스크 분류매트릭스를 개발하였다. 평가를 위한 분석표는 고품(core)을 재제조할 가치가 있는지에 대한 의사결정을 하는데 필요한 기준자료가 된다.
        18.
        2006.04 구독 인증기관 무료, 개인회원 유료
        This paper is to introduce guidelines for risk management and analysis. International tandards such as IEC 60300-3-9, IEC 61511-3, ISO 14971-1 and ISO/IEC Guide 73 are considered. This study is to discuss risk analysis of technological systems, and guidelines in the application of hazard and risk analysis for functional safety instrumented system, and risk management of medical devices, and guidelines for use in risk management standards.
        4,200원
        19.
        2004.11 구독 인증기관 무료, 개인회원 유료
        다양한 리스크문제가 발생하고 있는 기업 환경 속에서 세계선도 기업들은 이미 효과적인 리스크 관리시스템의 운영을 통하여 기업의 손실을 최소화함으로써 이윤을 극대화하고 있으나 우리 기업들은 아직 그렇지 못한 실정이다. 본 연구에서는 리스크 경영 시스템(Risk Management System : RMS)의 구성에 따른 분석 기법들의 적용범위, 용어 개념과 절차등을 비교, 분석하여 우리 기업들이 가지고 있는 리스크문제를 효과적으로 관리할 수 있는 대안 모색을 가능하도록 하는 기초 자료를 제시하고자 한다.
        4,000원
        20.
        2002.05 구독 인증기관 무료, 개인회원 유료
        리스크 관리 실패는 기업 및 국가 경쟁력 약화 요인으로 작용하고 있으며 현재 선진 각 국에서는 리스크 경영시스템을 구축하고 도입함으로써 시각과 발상의 전환, 그리고 국면타개를 도모하고 있습니다. 이에 본 논문은 선진국에서 현재까지 진행되어 온 리스크 정책 개발 동향을 조사 연구하고, 선진국의 경우 정부적인 차원에서 어떠한 내용의 프로젝트를 수행하고 있는지 조사 연구하여 국내 기업 여건에 맞는 리스크 경영시스템 구축에 중요한 정보를 제공하고, 시스템 구축에 대한 방향을 제시하고자 합니다.
        4,000원
        1 2