검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 29

        1.
        2022.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Ijidang(二止堂) is a private village school (seodang, 書堂) established in Okcheon, north Chungcheong province where Jungbong Jo, Heon(重峯趙憲, 1544-1592 AD) had trained for his sound mind and body(yusangcheo, 遊賞處). Jo, Heon was a notable Neo-Confucian scholar of the Kiho School and also a righteous general leading soldiers in Joseon Dynasty. According to Ijidanggi(二止堂記), Ijidang was constructed to honor Jo, Heon and to train local talents in 1647 with the support of Song, Si-yeol(宋時烈, 1607-1689 AD),a representative scholar belong to Kiho School and other local Confucian scholars. Ijidang currently consists of Main Body(本體) in the middle along with the East(Dong-lu 東樓) and the West Pavilions(Seo-lu 西樓) attached to each side. The Main Body and the Dong-lu firstly constructed were to give lectures and to rest within. Ijidang has undergone several changes in its form so far. The surrounding nearby Ijidang shows characteristics of the Confucian architecture for training(J eong-sa, 精舍) and the building itself was to be built in a scenic place apart from the secular world in which scholars stayed, cultivated their body and mind or taught disciples within. The lecture space of Ijidang is positioned next to the main hall(Dae-cheong 大廳) unlike other typical forms of a three-bay building(samganjije 三 間之制) at that period. West lu, a two-story building added afterwards in the early 18th century representing characteristics of the Gate Pavilion(Mullu, 門樓) of Neo-Confucian Academies(Seo-won, 書院) in Joseon Dynasty was typically located where the entrance and the ground floor of the main building are visible simultaneously.
        4,900원
        2.
        2021.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the demand for more precise and demand-oriented customized spatial information is increasing due to the 4th industrial revolution. In particular, the use of 3D spatial information and digital twins which based on spatial information, and research for solving social problems in cities by using such information are continuously conducted. Globally, non-face-to-face services are increasing due to COVID-19, and the national policy direction is also rapidly progressing digital transformation, digitization and virtualization of the Korean version of the New Deal, which means that 3D spatial information has become an important factor to support it. In this study, physical objects for cities defined by world organizations such as ISO, OGC, and ITU were selected and the target of the 3D object model was limited to buildings. Based on CityGML2.0, the data collected using a drone suitable for building a 3D model of a small area is selected to be updated through road name address and building ledger, which are administrative information related to this, and LoD2.5 data is constructed and urban space. It was intended to suggest an object update method for a 3D building among data.
        4,000원
        3.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        3,000원
        5.
        2015.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        High rising of the buildings offers a number of risk factors than ever before with regard to fire prevention. Especially in the construction site of high-rise buildings, people waste golden-time during the evacuation because temporary fire fighting facilities are not installed and transferred to a large fire because of fire suppression failure. In this study, the researcher derives the problems of fire protection in high-rise buildings construction sites and proposed the measures in such the legal aspects as fireᆞ building construction code and etc. There are the legal improvements such as orders of construction suspension in the problems of fire safety, appointing fire safety manager, temporary fire protection installation standards, enhancing penalty provisions regarding the use of fire, operating self fire brigade, confirming on-site after completing fire-protection facalities, establishment or strengthening special fire-protection investigations
        4,300원
        6.
        2015.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        근래 국내 초고층 주상복합 건물에는 철근콘크리트구조가 보편적으로 적용되는데, 이러한 철근콘크리트 초고층 주상복합 건물은 시공 시점에 따라 구조적인 문제가 발생할 수 있다. 따라서, 시공 중인 철근콘크리트 초고층 주상복합 건물에 대하여, 시공 시점별 구조 안전성 및 횡력저항성능을 검토하고자 한다. 이를 위해, 예제 모델로 탑상형의 초고층 주상복합 60층 건물을 선정했고, 기존의 범용구조해석 프로그램을 사용하여 구조해석을 수행하였다. 각 시공 시점별 10층, 20층, 30층, 40층, 50층, 60층 완료모델과 60층 완공단계 모델의 구조성능을 비교하였다. 구조성능 비교를 위해 이 모델들의 고유치해석을 수행하였으며, 횡력저항성능과 부재별 단면성능을 검토하였다. 횡력저항성능 검토를 위해 횡변위비와 층간변위비를 검토했고, 부재별 단면성능 검토는 완공단계에 대한 설계강도비와 시공단계의 설계강도비를 비교하여 부재안전성을 검토하였다. 이 연구를 통해, 시공 중인 철근콘크리트 초고층 건물의 구조 안전성을 검토하고 시공단계에 적합한 구조해석 및 설계하중의 가이드라인을 제시하고자 한다.
        4,000원
        7.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 논문에서는 현재 시공중인 58층의 철근콘크리트조 고층건물에서 진동현식게이지를 통해 계측된 기둥의 축방향 변형률과 레이져 스캐닝을 통해 구한 횡변위를 3차원 시공단계해석에 의한 예측치와 비교하였다. 예측치는 ACI 209와 PCA의 재료모델식, PCA report의 축소량 산정알고리즘을 3차원 구조해석 프로그램으로 개발한 ASAP을 사용하여 구하였다. 비교결과 평면의 중앙부 기둥의 축방향 변형율 계측치는 시공단계 해석치와 거의 유사한 결과를 나타내었으나 각 모서리에 두 개씩 배치된 기둥의 경우 비교적 큰 오차를 나타내었다. 레이져 스캐닝에 의한 횡변위 계측결과는 해석결과와 유사한 경향을 보였으나 층당 계측치가 큰 변동을 나타내므로 향후 이를 해결하기 위한 계측 및 데이터 처리기법이 요구된다.
        4,000원
        8.
        2014.11 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        5,700원
        9.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
        4,600원
        10.
        2013.03 구독 인증기관 무료, 개인회원 유료
        In rapidly changing circumstances, the construction industry shows tendency to be more complicated and expanded and these changes are becoming the main factors aggravating uncertainty in straightening construction costs in the industry. The most important process in preliminary phase is calculation of appropriate construction sum and accurate estimation is required to accomplish it. Currently, local constructors draw up estimates by using the ‘per square meter’ calculation method or by applying of previous cases as they are. These methods become suppressive cause for making clear decisions by occurring errors in quantity survey in a way of data emission, replication and so on. Therefore, in this study, approximate estimation model of finishing construction shall be proposed to assist people to make prompt decisions in initial design stage. To develop this research, the existing quoting practices shall be presented and categorized by usage of space. To achieve this, information on performance, furnishings and unit price according to space definition has been collected in advance, which again enable ontology knowledge classification scheming database of space unit to be utilized and presented as knowledge information.
        4,000원
        11.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently buildings are constructed in larger and higher scales and becoming more complex. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore to improve fire safety plan, examining the actual fire safety management and understanding fire risk analysis Using Fire Modeling through Computer Simulation. On this study, the permissible evacuation times were estimated for smoke fall, temperature, CO concentration, viability, etc. Fire safety management plans for fire safety were suggested.
        4,000원
        12.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently real-estate investment business is standing out as a new plan for creation of source of income. In this paper, we suggested appropriate real-estate investment strategy through the reconstruct case study of existing one-storied building. That is, we showed the efficient process of decision and propel to reconstruct and the key points for lease business and post management after building completion. Also, we analyzed the rate of return of commercial building investment in order to find its optimum dealing time. Therefore the results of this paper are expected to be a help to old ages and persons laying plans for a similar business.
        4,000원
        13.
        2012.11 구독 인증기관 무료, 개인회원 유료
        Recently buildings are constructed in larger and higher scales and becoming more complex. Every country in the world is competing to build high-rise buildings. Korea also has and is constructing high-rise buildings, like the 123story Jamsil Lotte Super Tower. However from small to large scale buildings and on construction sites there still are fire safety accidents that occur continuously. Therefore to improve fire safety plan, examining the actual fire safety management and understanding fire risk analysis Using Fire Modeling through Computer Simulation. Fire safety management plan related fire safety cases were collected an dan analyzed for the study. Also hazard analysis of High rise Buildings under fire compared with existing fire law sand regulations.
        4,000원
        14.
        2012.10 구독 인증기관 무료, 개인회원 유료
        Recently real-estate investment business is standing out as a new plan for creation of source of income. In this paper, we suggested appropriate real-estate investment strategy through the reconstruct case study of existing one-storied building. That is, we showed the efficient process of decision and propel to reconstruct and the key points for lease business and post management after building completion. Also, we analyzed the rate of return of commercial building investment in order to find its optimum dealing time. Therefore the results of this paper are expected to be a help to old ages and persons laying plans for a similar business.
        4,000원
        15.
        2012.03 구독 인증기관 무료, 개인회원 유료
        Recent projects for transferring Public Office buildings and estimation of appropriate construction expense are highly important for both government and construction firms. Moreover, estimation and management of construction expense can be regarded as extremely important duties for effective execution of a national budget as nation’s finance is invested in the Public office building projects progressed by the government. To progress one project for Public office building, not only the organization demanding the project but also an investment screening organization, a budget-managing organization, a feasibility assessment institution and many other related organizations participate in the project and a lot of decisions arisen from the project operation are made on the basis of construction expenses calculated for relevant stages. And estimation of rational construction expense is also critical for designers in order to create design within the fixed budget simultaneously with securing the quality and efficiency of structures to the maximum. Therefore this research suggested an improvement process to analyze problems in current construction expense management process and to administer the construction expenses effectively.
        4,000원
        16.
        2011.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구의 목적은 지진모의실험을 위한 1:5 축소 10층 R.C. 공동주택 모델의 제작과정을 통하여, 실험체의 효율적인 설계 및 제작 과정을 개발하는 것이다. 실험체의 축소율은 가용한 진동대의 크기(5m{\times}5m)와 최대 허용무게(600kN)및 모델 철근(D3 볼트, {\phi}2 강선)의 경제성과 상용성을 고려하여 결정하였다. 모델 철근은 현장에 바로 설치하기 어렵기 때문에 철망을 제작한 후 현장에서 조립하였다. 벽체와 슬래브를 동시에 타설할 경우 거푸집의 탈형이 매우 어렵기 때문에, 벽체를 먼저 타설하고 양생 후 탈형한 뒤 슬래브 거푸집을 설치하였다. 벽체 거푸집은 반복 사용이 가능한 Slip form 형태로 한쪽은 합판, 다른 한쪽은 아크릴로 제작하여 타설시 밀실도를 확인할 수 있도록 하였다. 1:5 축소 10층 R.C. 공동주택모델을 제작하기 위해 총 제작 기간은 약 6개월이 소요되었으며, 전임 연구원 5명, 작업보조원 612명 일의 인원이 투입되었다.
        4,300원
        17.
        2010.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Since the 1970's, UNESCO and ICOMOS have adopted or emphasized on the principles of historic preservation. One of them is what to require a repair should not be repaired beyond the limits of the features and techniques which had been adopted in those days of establishment. On the premise, this paper is to examine the materials and technique of wall plaster work in the government building constructions in the Joseon dynasty. The result of this examination shall come up with a basic conformity in the case of repairing the building established in the late of Joseon dynasty. This paper is carried out for the proper repair and restoration of architectural cultural properties. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. The materials and technique which applied to wall plaster work in those days were quite different from the present. The technique that was used to wall plaster of government buildings in those days was not a lime wall plaster, but sand coat one. The kinds of material for setting of the sand coat wall plaster had been revised with the change of the times or constructions. The main kinds of material were composed of sand, white clay, paper fiber, and cereal starch. However, the present materials were composed of sand, white clay. Therefore, the present materials and technique which applied to wall plaster work for the repair and restoration of architectural cultural properties have to be revised and corrected.
        5,200원
        18.
        2009.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo,. In case of the Hanseong period, a glimpse of the features has been gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some data out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.
        4,800원
        19.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        20.
        2007.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Jeoksimto which was build up as the reinforcement establishment made with the soil under the cornerstone in the site of tile-capped building is the representative construction technique which become popular in the Sabi capital era after the Wungjin capital era. Especially from the fact that no site of tile-capped building with this Jeoksimto has been found in the Silla area, we can see the originality Baekje technique. We can analogize the specialization of Josagong (造寺工) (craftsman building the temple) and the diversity of technique, on the basis of the technique raising the ground level which is different with the middle gate site of Neung-sa and the Hall enshrining Buddha site in Buyeo. Moreover, we can have the confidence the dispatch of craftsman and the transmission of building technique from the Buyeo area to the Iksan area through the fact that the construction techniques of Jeoksimto in both area are almost the same. However the concerns in the construction archaeology are necessary because almost no study for Jeoksimto has been conducted and the term of Jeoksimto also is unfamiliar even if excavation of Baekje Jeoksimto in the several remains.
        5,200원
        1 2