검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 28

        1.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..
        4,000원
        2.
        2023.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.
        4,300원
        3.
        2022.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The “Carbon Neutral” has become the most important goal to achieve in the era of the climate change crisis. K-water has prepared a roadmap for implementing “Carbon Neutral” by 2050. However, only the reduction targets and strategies for scope 1 and 2 have been set, so the management of carbon generated during the construction project and upfront carbon is not being implemented. Therefore, in this study, the criteria and methodology for estimation carbon emissions in the construction sector at domestic and foreign were reviewed, and a methodology for estimation carbon emissions suitable for K-water construction projects was presented, and a case study was conducted. As a result, most of the carbon emissions were more than 90% of the upfront emissions due to material production. Therefore, upfront carbon management is required for carbon management of K-water construction projects, and it is necessary to quantify carbon emissions through GHG construction inventory, etc., and to establish strategies for future reduction technologies.
        4,500원
        6.
        2021.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.
        4,500원
        7.
        2020.06 KCI 등재후보 구독 인증기관 무료, 개인회원 유료
        건설공사의 클레임(claim)은 공사진행과 관련하여 계약 당사자간의 권리 의무관계를 명확하게 정리하여 추가적으로 발생하는 시공비용 부담자를 결정하는 것을 말한다. 건설 공사는 현장이 매우 복합하고 예기치 못한 현상의 발생, 발주처의 요구 등으로 인한 계 약변경과 세계경제 변동 등으로 위험성을 항상 내포하고 있다. 이러한 불확실성과 위험 성은 다양한 이익 집단이 참여하는 공사과정에서 당사자 간의 갈등을 발생시키고 클레 임이나 분쟁을 발생하게 한다. 현장에서 발생되는 클레임의 유형은, ⅰ) 계약도서와 현장 조건의 상이, ⅱ) 발주자 측의 시공내용 변경지시, ⅲ) 공사의 지연, ⅳ) 발주자 측의 공사 수행의 독촉 행위 등이 있으며, 이에 대한 개선방안으로 첫째, 클레임 예방 제도 도입이며 세부적으로 ⅰ) 리스크 관리 예산 확보, ⅱ) 실질적 감사제도 확립, 둘째, 클레임 예방을 위한 계약제도 정비이며, 세부적으로 ⅰ) 발주방식에 적합한 공사계약특수조건 구비, ⅱ) 공사계약 일반조건의 개선, 셋째, 분쟁 전 단계별 협의 체계 수립이며 세부적으로, ⅰ) 클레임 발생 단계의 처리, ⅱ) 의견차이 단계의 처리, ⅲ) 논쟁 단계의 처리가 필요하며 이에 대한 제도의 보완이 필요함을 제언한다.
        5,400원
        9.
        2019.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Stakeholder management in construction projects is an important factor in project performance creation. The purpose of this study is to verify the effect of the recognition of the importance of the quality influence factors among the stakeholders of the construction project on the perceived quality and the project performance. The impact of the project management methodology on the project performance has been actively researched, but there is little research result on the project stakeholders. The projects to be researched are apartments and buildings that have been completed within the last five years of domestic large construction company. The method of survey is to measure the consensus of the importance of the quality influential factors among the three parties such as the ordering party, the design supervisor and the constructor, and confirm whether the agreement affects the quality of the actual project. Finally, the research model was verified by surveying the satisfaction of the client on the final product. The results are as follow. The degree of agreement on the importance of quality influential factors among stakeholders has a significant effect on perceived quality. In the relationship between perceived quality of influence factors, organizational (support) quality influenced technological quality and managerial quality, and technological quality and managerial quality also have significant influence on resource quality. The results of analysis showed that perceived quality of resources strongly influenced project performance. The remaining three experienced qualities also significantly affect project performance.
        4,000원
        10.
        2017.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.
        4,000원
        12.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Total accident rate in the construction industry is a very meaningful reduction to establish a comprehensive disaster reduction measures, including through the Survey, the disaster prevention projects whilst driving status and problem analysis in order to reduce the mature workers in the construction industry is growing rapidly in all disaster disasters (share) The days. It is urgent to establish a framework and measures that can identify the specific cause for this than for the middle-aged workers and disaster reduction in disaster reduction efforts, which continue to increase. Used as measures of information and data presented in the basic requirements of mature workers also been.
        4,000원
        13.
        2015.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        『Act on Facilitation of Purchase of Small and Medium Enterprise – Manufactured Products and Support for Development of Their Markets』 was created and implemented. The act states that the materials designated by the Small and Medium Business Administration are directly purchased from the small and medium enterprises and provided to the construction companies so that the materials can be provided as GFGI (Government Furnished and Government Installed) in the case of a public construction project. This thesis is aimed to analyze the current status on the problems of each project party and understand their improvement requests so that mutually beneficial plans can be sought and improved process is presented for the continuous development of the direct construction material purchase system as well as successful construction projects. And This thesis summarized the purpose of the institutions and their change histories, and related law as well as codes for the better understanding of administrative procedures for the purchase system and the analyses as well as the improved process on the difficulties in complying with the current institutions.
        4,000원
        14.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Share of total accidents in construction accidents construction site accident 70% of small embroidery Reducing the rate of Construction of the entire construction accidents decreased overall is a very meaningful work. Disaster reduction continues to increase despite the efforts of a small construction site(Amount less than 2,000,000,000) for Disaster Reduction In order to identify more clearly the cause of the system and provide the urgently needed measures.
        4,200원
        15.
        2014.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        6 sigma is a management innovation strategy which improves most of all managerial processes including transactional and project based operations such as marketing, purchasing, accounting, and construction. Even though 6 sigma is trying to solve problems from the customer’s viewpoint in the scientific manner, project leader feels some difficulties in implementation because of several reasons. Especially the difficulties are prevalent in construction site. This paper investigates the cause of the difficulties through questionnaires, analyzes the investigation results, and verifies the critical success factors of 6 sigma implementation. Factor analysis has been usually employed in reducing quantity of data and summarizing information chaos. In this study, several variables from questionnaires are grouped into just only four factors by the process of factor analysis. The critical success factors are extracted as project management system, implementation mechanism, site condition, and project ownership. Some ideas for each individual success factor are suggested, which are expected to be useful in successful implementation of 6 Sigma in construction site.
        4,000원
        16.
        2011.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study was conducted to provide an improving direction of K-EIP(Korean Eco-Industrial Park) construction project by company's voluntary participation. For this purpose, we investigated and analyzed the status of domestic eco-industrial park projects from various literatures, foreign EIP cases and FGI(Focus Group Interview). The key issues to construct a voluntary K-EIP are the lack of experts, the difficulties of commercialization financing, and so on. In this study, therefore, the programs to resolve these problems in K-EIP construction project were suggested at the level of government and corporation.
        4,500원
        17.
        2011.07 구독 인증기관 무료, 개인회원 유료
        민간업체의 기술개발의욕을 고취시킴으로써 국내 건설기술의 발전을 도모하고 국가 경쟁력을 제고하기 위하여 건설기술관리법에 의하여 건설신기술지정제도를 운영하고 있다. 해당 법에서는 신기술로 지정받은 기술에 대하여는 일정기간동안의 해당기술을 보호할 수 있도록 하고 있으며, 해당 기술의 사용자에게 기술사용료를 요구할 수 있도록 규정하고 있다. 이처럼 건설 신기술 지정제도는 특허제도와 유사한 형태로 기술을 보호, 활용할 수 있는 제도로 운영되고, 해당 기술의 설계 반영시에는 그 기술의 사용료를 일정 요율로 책정하여 운영토록하고 있다. 본 연구에서는 건설신기술 지정제도와 특허제도와의 차이점을 살펴보고, 표준 설정에서 활용되고 있는 RAND 조건과 전통적 경제학에서의 가격차별 유형을 고려하여, 건설신기술지정제도의 운영 취지에 맞는 운영 방안을 제시하고자 한다.
        4,600원
        20.
        2009.09 구독 인증기관 무료, 개인회원 유료
        A prediction of construction cost in preparation for construction document is calculated in compliance with the unit cost in Public construction of korea. This eventually means that the reasonable construction cost of a building can't be determined before construction document phase cost of construction is settled and that the cost of construction is calculated inefficiently because of connection failing between cost management of detailed estimation and information. To improve those problems, therefore, Cost estimating model of structural building elements with approximate quantity survey method is suggested in this research. The model predict the amount of materials and the cost of construction on the basis of historical similar cases. In the direction of data analysis of this research, ratio statistics value is put to practical use to fit into the peculiarities of approximate estimate of each work trade on the basis of actual data amount of materials of historical cases. In addition, the construction phase is connected through the result of a approximate estimate sorted by elements, details work trade.
        4,000원
        1 2