검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 123

        41.
        2015.10 구독 인증기관 무료, 개인회원 유료
        The major issue in aircraft industry is aviation safety management because of demand improvement and advancement of the aircraft. This study is to assess the risks for aviation safety management using IRPN( importance-risk priority number) which is added to importance coefficient from RPN(risk priority number). In FMEA, RPN requires the factors like the occurrence (O), Severity (S), and Detection (D) of each failure mode to be precisely evaluated. Therefore, the severity and detection is derived by the value from FMEA of expert group based on the Fuzzy theory. The occurrence is calculated from the accident statistics of IATA(international air transport association) database. Particularly, this study introduces importance coefficient to prevent from RPN distortions. It is also derived from FMEA based on the Fuzzy theory. Finally, the critical ranking of risk factors according to I-RPN is compared with the existing research.
        4,000원
        42.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This paper provides a study on the application and proposals of safety culture, new public management and social amplification of risk framework via ship accidents in Korea. This document analyzes what are the concept of safety culture, new public management as well as social amplification and risk framework and describes how 3 issues act, harmonize, interrelate through M/V Sewol accident. Korean government is needed to apply social amplification of risk framework to the in order to promote the safety culture in the maritime administration. Hence, this paper proposes safety framework in order to prevent and resolve future unexpected accident especially for maritime field.
        4,000원
        43.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The weapon systems development has some distinct characteristics in that a big size of government budget (derived from national tax) has been expended frequently and the completion of the development projects seems to take long. Thus, the impact of the potential changes in the required operational capability on the development activities can induce some type of project risks. As such, proper management of project risk has been one of crucial subjects in the weapon systems development. Although a variety of methods can be considered, an approach based on the test and evaluation (T&E) process has been selected in this paper in order to appropriately handle those potential risks. In the study of the underlying T&E process, the safety consideration (for instance, explosiveness) of weapon systems is also included. To achieve the objective of the paper, a step-by-step procedure is first presented in the analysis of the T&E process. Then, to pursue some enhancement on the process, a set of necessary and useful activities are added in terms of risk and safety management. The resultant process is further analyzed and tailored based on a design structure matrix method. The case study of a tank development is also discusse
        4,000원
        44.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of the establishment of corporation’s Business Continuity Plan(BCP) is to maintain corporations’ own business and establish the response plan in order to resume operation in a short time period when crisis situations occur due to natural disaster and human error. This study has presented all types of procedures and criteria which are needed to establish the airport crisis response system in order to maintain the business continuity by utilizing BCP technique. Basically the risk response procedures must be established in the process of (1) preparation stage, (2) plan development stage, (3) documentation stage, (4) test & maintenance stage. The guideline has been suggested that each stage must be carried out in the sequence of Policy & Planning Responsibility, Business Impact Analysis, Recovery Strategy & Plans, Emergency Plan & SOP, Training Awareness and Maintenance & Review
        4,300원
        45.
        2015.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Enterprise Risk Management(ERM) is aiming at the establishment of the risk management process to prevent and cope with risks in advance and is composed of Risk Identification, Risk Assessment, Risk Response and Monitoring. It is feedback through the Risk Re-identification. This study has analysed a sample of the risk management system of an airport operating corporation, for this purpose, relevant documents and examples of overseas airports have been reviewed. It has found that corporation establishing ERM have been performing identical procedures such as the process of Identification, Assessment, Effective Reporting, Communication and monitoring and so on. The A corporation has established the process for risk management and crisis management and organized for its organization and system. The risk management has the same process such as above. In this process, when the symptoms of critical crisis have been recognized, it has been transformed into crisis management system, through which, corporate-wide response has been conducted in the process of crisis status analysis, response and follow-up management. This study expects to contribute to systematic foundation for future business continuity on the basis of risks and response procedures acknowledged by this study.
        4,200원
        46.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The occupational health and safety accidents were continuously increased during handling, usage and manufacturing the chemical materials according to increase of small and medium sized enterprises in domestic industries. These accidents mainly resulted from insufficient occupational health and safety management and deteriorative facilities and focused on corresponding operation to minimize the damage of accidents after occurrence. But, it was required that we grasped the occurrence causes of occupational health and safety risk in handling, usage and manufacturing the chemical materials and develop the adequate corresponding operation and system according to the possible occurrence of occupational health and safety risk. This study deals with the development of risk assessment model to derive the risk and important risk of occupational health and safety and then help to construct the self-controlled occupational health and safety system for small and medium sized enterprises handling the chemical materials.
        4,000원
        47.
        2014.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 제외국의식중독균별저감화사례를조사, 비교하여 정보를 획득하고 식중독균 저감화 매뉴얼을 작성하며 저감화 정책방안을 제시하기 위한 기반 자료 확보를 목적 으로 수행하였다. 선진 외국(미국, 덴마크, 일본)의 식중독 저감화 정책의 현황 및 사례조사에는 인터넷 자료, 관련 기관 전문가 인터뷰를 통하여 조사하였다. 미국의 신선농산물에서 미생 물학적 위험요소 저감화(FDA), 미국 분쇄쇠고기에서 E. coli O157:H7의 저감화(USDA), 덴마크의 닭고기, 돼지고기, 계란에서 살모넬라 저감화, 일본의 어패류에서 장염비 브리오 저감화 프로그램을 사례 연구로 제시하였으며 이들 국가의 저감 프로그램의 배경, 전략, 효과를 조사하고 장단점 분석을 실시하고 시사점을 도출하였다. 이들 제외 국 정책 사례 연구와 국제기구 CODEX의 위해관리 체계 를 결합하고 국내 현실을 반영하여 식중독 저감화 관리 매뉴얼로 저감 프로그램에 관한 일반 모델을 다음 순서로 제시하였다: 1) 위해관리 초기판단, 2) 식중독 저감화 프 로그램 계획, 3) 대안 확인 및 선택, 4) 대안 실행(이해당 사자별 역할 설정 및 대안 방법 적용), 5) 감시 활동, 6) 중간 재검토, 7) 목적 달성 때까지 대안 실행 지속적 실시 (만일 대안이 효과가 없으면 대안을 대체하거나 수정하여 식중독 저감화 목표 달성 시까지 실시), 8) 최종 평가에 보건에 미치는 영향을 확인하고 필요시 비용 편익 분석 실시. 본 연구를 통해서 제시된 식중독 저감화 정책에 관한 시사점 및 식품안전의 이해당사자별 역할별로 도출된 식 중독 저감화 정책 모델 및 매뉴얼은 미생물학적 위해관리를 수행하는데 향후 활용될 수 있다.
        4,000원
        48.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As weapon systems become complex in terms of the scale and functionality, the required time to complete the test and evaluation (T&E) process is inevitably getting longer. However, nowadays the reduction of T&E period becomes one of the core targets in the weapon systems acquisition programs. This is because the reduced time for T&E process can yield the reduction of defense budget and also faster deployment of the weapon systems, thereby having a competitive edge over rival countries. On the other hand, in weapon systems development the management of reliability, availability, maintainability and safety (RAMS), and risk is considered important to keep competitiveness and thus has been carried out separately. Thus, the objective of this paper is to study on improving the T&E process by integrating the RAMS and risk management process in it. To do so, the related processes are analyzed and modeled first. Then an integrated process model is developed. The resulting model is equipped with the traceability among the data and interfaces that are generated from the T&E and RAMS/risk processes. As a case study, the model developed is applied in tanks development. The effective use of the traceability is expected to reduce the time and cost required to complete T&E process.
        4,300원
        49.
        2014.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study was performed to acquire the information on the foodborne pathogen risk management programs in a couple of developed countries by the expert meeting and searching the information on the web. The backgrounds, strategies and effects related to microbial hazards of the foodborne pathogen reduction programs in fresh produce (US), Escherichia coli O157:H7 in ground beef (US), Salmonella in chicken, pork and eggs (Denmark), and Vibrio parahaemolyticus in seafood (Japan) were investigated for case study. A comparison among the pathogen reduction programs was conducted to find advantages and disadvantages and implications of the policies to bring out implications of the programs. A model for foodborne pathogen reduction program was developed based on both the CODEX risk management scheme and the case studies as follows; 1) preliminary risk management activities, 2) planing a foodborne pathogen reduction program, 3) option identification and selection, 4) implementation (conducting the each stake-holders role and applying the intervention methods), 5) monitoring activities, 6) interim review, 7) continuation or amendment of implementation method by the interim review before achieving the goal, and 8) final review and additional cost-benefit analysis if necessary. This proposed model according to the role of the stake-holders can be used to conduct microbial risk management programs in Korea in the near future.
        4,000원
        50.
        2013.11 구독 인증기관 무료, 개인회원 유료
        최근 현대 무기체계는 최첨단 기술로 인한 무기체계 개발 속도 증가와 획득환경의 다변화와 더불어 이에 대한 위험도 동시에 증가하고 있다. 이에 따라 미국방부는 무기체계의 수명주기를 고려하여 시험평가를 지속 적용토록 강조하고 있다. 따라서 기존의 무기체계 시험평가 프로세스에서 다루는 시스템 설계에 대한 위험 관리 활동의 강화의 필요성 역시 강조되고 있다. 그 중에서도 무기체계 개발의 탐색개발 및 체계개발 단계는 양산에 들어가기 전의 최종 활동으로서 제대로 수행되어야만 초기에 의도한 무기체계 개발의 목적을 달성할 수 있을 것이다. 본 논문에서는 위험 관리 활동을 고려한 시험평가 프로세스의 개선사항 도출과 모델링을 통해 무기체계 시스템인 무기체계를 대상으로 적용 및 조정 구축에 대한 내용을 기술하고 있다. 본 연구의 결과를 토대로 향후 시험평가 시 위험관리에 대한 투자를 통해 전체 프로젝트의 기간 단축 및 비용 절감과 안전성 확보를 개선시킬 수 있을 것으로 기대된다.
        4,200원
        51.
        2013.05 구독 인증기관·개인회원 무료
        In this paper, a mathematical model is developed for finding a degree of influence of risks affecting the project. At risk identification step, all risks are structured in forms of block diagrams after risks of project activities are identified. At risk analysis step, reliability functions are derived based on block diagrams of risks. Reliability function represents the probability of the project success. Based on the derived reliability functions, risks importance is defined as a criterion for expressing a degree of influence of each risk affecting the success of the project, which is. Risks importance includes the structural importance of risk, the probability of risk, and the impact of risk. It could be applied to determine the priorities of risks which should be controlled, and the use of such priorities could guarantee successful project activities. Finally, examples of the proposed mathematical models will be given.
        52.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        It is very important the collaboration and risk management of supply chain between the parent company and its partners in the supply chain risk management(SCRM). It was known that the SCRM approach is very different between a large enterprise and a small and medium-sized enterprise. This paper deals with the suggestion about SCRM structure for a small and medium-sized enterprise. This SCRM structure consist of risk identification, risk assessment, and risk mitigation. We expect that this SCRM structure promote the collaboration between a parent company and its partners to alleviate the supply chain risk.
        4,000원
        53.
        2012.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The important elements and conditions to improve corporate competitiveness are customer development, new product development, sales increase, net profit increase, and other factors. Even if those competitiveness elements are well prepared, obstacles may exist. In this paper, we examined the risk, the deadliest obstacle that can affect corporate. We selected the risk factors that exist in functional categories in the system connected complicatedly and variously by organizational value chain of corporate, and examined the conceptual model of Enterprise Risk Management System based on the precedent studies.
        4,000원
        55.
        2011.09 구독 인증기관 무료, 개인회원 유료
        With the trends of massiveness and complexity of construction, the main agents of construction have considered the various types of risk management strategies to minimize the loss caused by the risk factors from the nature of construction project, regional characteristics, and scale of construction. The risk management has been conducted, because the risk factors have exacerbated the condition of construction in terms of the level of productivity, quality of construction, atmosphere, and budget. Based on thε interests regarding risk factor management, the current study suggests the work breakdown structure-based process. Additionally, based on the work breakdown structure, the risk factors on constructions are identified and stratified depending on the level of salience of each risk factor. The purpose of result is to lead Korean Land Corporation understand and control the risk factors properly for the advanced construction process of Korean Land Corporation. Ultimately the current study contribute to advance of efficient risk management strategies by using ANP method, which identify and control the primary risk factos depending on the impact of the interaction and subordinate relationship between risk factors.
        4,000원
        56.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Since 'The Act on Private Investment of The Infrastructure' was established in 1994, private investment as well as government's investment in transport infrastructure has been active. However investment in transport infrastructure has more risks than others' due to uncertainty both in traffic volume and in construction cost. In the current appraisal procedure of deciding transportation infrastructure investment, instead of risk management, the sensitivity analysis considering only the changes of benefit, cost and social discount rate which are main factor affecting economic feasibility is carried out. Therefore the uncertainty of various factors affecting demand, cost and benefit are not considered in feasibility study. In this study the problems in current investment appraisal system were reviewed. Using Delphi technique the major factors which have high uncertainty in feasibility study were surveyed and then improvement plan was suggested in the respective of classic 4 step demand forecasting method. The range estimation technique was also mentioned to deal with the uncertainty of the future.
        4,000원
        57.
        2011.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The uncertainty of a project generates risks hindering the goal achievement of the project, and the risks affect the success or failure of the project significantly. Risk management, a part of the project management, includes various processes, and there
        4,200원
        59.
        2010.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The purpose of this study is, by recognizing that recently, as crimes using information and various adverse-effect phenomena such as hacking and virus occur frequently with rapid development of information network such as Internet in every field of industry, the range of security is widening to the field of industrial areas for preventing the leaking of industrial technology and protecting that technology as well as information security only limited to IT area, and by establishing common concept about industrial security through education on the industrial security at the point of increasing importance of industrial security, to prepare the base of comprehensive risk management system for protecting company's assets (physical factor, technical factor and managerial factor) safely from the random threats or attacks inside and outside the company through assessment of important assets of the company, evaluation of threats and weak points, and risk assessment by building industrial security management system in order to protect company's information assets and resources which are connected to the existence of the company safely from the threats or attacks from inside or outside the company and to spread stable business activities.
        4,200원
        60.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Establishing a framework, to explain the path to safety accidents considering major safety management factors such as physical conditions including on-site activities and workplace, as well as human factors as to labor, supervisors, or managers, would be effective as the basis to control project's risks by preventing disasters. Therefore, this study aimed to clarify the mechanism in safety management and disaster occurrence. In order to accomplish the purpose, it identified and classified the factors related to accidents, reviewed the causal relationships among them, and suggested the influence diagram. The results of this research are expected to contribute to reinforcing the preventive management, and facilitating the development of integrated site control system based on safety risks.
        4,200원
        1 2 3 4 5