검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 25

        1.
        2024.04 구독 인증기관·개인회원 무료
        본 연구는 도로터널, 철도터널, 지하철, 전력구 등 각종 터널 시공을 위한 TBM(Tunnel Boring Machine) 기술의 시공성 향상을 위한 연속굴착형 TBM 장비와 나선형 세그먼트 통합 시공기술 개발 및 실증과 관련된 것으로 핵심모듈인 추진잭, 세그먼트 이렉터의 선제적인 유지관리를 통해 다운타임 을 최소화하고 굴진율을 안정적으로 확보하기 위한 연속굴착형 TBM 핵심모듈의 유지관리 및 장애대 응 기술에 대한 연구를 수행하였으며, 굴착환경과 연속굴착 운영특성을 고려한 시공 및 장비 운용 절 차를 정의하였다.
        2.
        2017.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The purpose of this study is to investigate the stresses of the middle slab in a double-deck tunnel owing to the slab lift to replace the underlying elastic pads during maintenance workMETHODS: The middle slab was divided into three different sections: typical section, expansion joint section, and emergency passageway section. Finite element analysis models of these three sections of middle slab were developed, and the stress distribution and maximum stresses were obtained using the models when the middle slab was lifted to replace the underlying elastic pads. Various slab lifting methods were examined in this study such as one-, two-, and multiple-point lifts, distributed lifts, and one or both slab side edge lifts.RESULTS: When the slab side edge is lifted, the longitudinal stresses of the slab are almost the same as the principal stresses. This implies that the governing stresses are the longitudinal stresses. The maximum stresses with both-edge lifts are generally smaller than those with one-edge lifts at all three sections of middle slab.CONCLUSIONS: If the middle slab in a double-deck tunnel is lifted for maintenance, the slab should be lifted at multiple points along the longitudinal direction to reduce the tensile stresses.
        4,000원
        3.
        2019.04 서비스 종료(열람 제한)
        The inspection items of tunnels include road surface breakage and cleaning condition, lane paint condition, lining crack, leakage, corrosion condition, tile cleaning condition, daylight and nighttime optimum illuminance condition, drainage facility damage and cleaning condition, Gangway wall wall and retaining wall abnormality, slope top and side slope condition. However, investigations for maintenance of tunnels mainly consisted of surveying condition and durability of concrete lining due to characteristics of tunnels.
        4.
        2019.04 서비스 종료(열람 제한)
        The stresses occurred in the middle slab at the areas of the emergency passageway in a double-deck tunnel are analyzed when the slab is lifted to replace bearing pads placed between the middle slab and supporting bracket as a maintenance process. The middle slab can be lifted at several different points near the emergency passageway areas and the stresses of the middle slab depend on the lifting points. This study presents the effect of the lifting location of the middle slab on the stress occurrence for the maintenance work of replacing bearing pads under the middle slab near the emergency passageway areas.
        5.
        2019.04 서비스 종료(열람 제한)
        In this study, in order to verify the effects of damaged quantities to maintenance prioritization with performance evaluation system, crack conditions which were subdivided as per performance evaluation grade, critical maintenance part and priority part are considered as evaluation factors of prioritization. This result prove that maintenance prioritization has been changed by damaged quantities.
        6.
        2018.04 서비스 종료(열람 제한)
        It is necessary to establish countermeasures to prevent spalling in the tunnel ceiling concrete lining from being linked to lack of lining thickness, leading to additional spalling. We analyzed the effect of thinning between the ceiling part and the lining thickness on the safety of the tunnel and confirmed the structural behavior of the lining based on the measured values after practically reinforcing the inside and filling the inside of the lining.
        7.
        2017.04 서비스 종료(열람 제한)
        In the Gangwon province, severe freezing damage to road tunnels are occurred due to freezing condition such as snowfall, cold waves and icing. As a result, serious damage occurs on the lining and road surface of the tunnel entrance and exit. Therefore, it is necessary to develop appropriate mitigation methods to protect damage to people and property by freezing. In this paper, we introduce that the trend of research for reducing the freezing damage and the required performance to be secured for the maintenance of road tunnels in cold region and the future research plans.
        8.
        2017.01 KCI 등재 서비스 종료(열람 제한)
        In the Gangwon province, severe freezing damage to road tunnels are occurred due to freezing condition such as snowfall, cold waves and icing. As a result, serious damage occurs on the lining and road surface of the tunnel entrance and exit. Therefore, it is necessary to develop appropriate mitigation methods to protect damage to people and property by freezing. In this paper, we introduce that the trend of research for reducing the freezing damage and the required performance to be secured for the maintenance of road tunnels in cold region and the future research plans.
        9.
        2016.04 서비스 종료(열람 제한)
        Defects of diversion tunnel have been analyzed by using the precise inspection for safety and diagnosis in 7 dams. Leakage from joint, crack, and material segregation is crucial damage in dam as well as crack, corrosion, and drainage system. Maintenances of diversion tunnel have been suggested with common and unique characteristics of defects.
        10.
        2015.04 서비스 종료(열람 제한)
        To have a rational maintenance Measures in masonry tunnel, the interaction matrix in PISD is adapted. Opinions from 22 experts in tunnel are applied to estimate the weight factor in risk analysis. 11 causes of masonry tunnel are evaluated for 163 sheets accounting for the limited budget and priority in risk.
        12.
        2014.04 서비스 종료(열람 제한)
        Recently, a lot of problems have occurred in the tunnel by low-temperature freezing phenomenon in winter. Icicles caused by low-temperature freezing phenomenon has caused tunnel maintenance and traffic accident possibility. Therefore, in the study it is analyzed that a case of tunnel freezing occurred in the past
        13.
        2014.04 서비스 종료(열람 제한)
        Existing tunnel and digging and construction of the center tunnel wall construction process was, including constructing additional a 2-Arch Tunnel is disadvantageous the workability and workday. In addition, the central wall (girder) due the complex waterproof, multiple, as leaks and has a structure plan requires proper Maintenance Methods.
        14.
        2013.10 서비스 종료(열람 제한)
        The newly-developed self-mobilizing space frame system is the equipment possible to adjust frame width and height per various road tunnel sizes. Main purpose of this system is to maintain road tunnels without blocking lanes. Therefore, it does not affect traffic and completes maintenance work quickly as compared to current method.
        16.
        2013.04 서비스 종료(열람 제한)
        Recently, Large Diameter Shield TBM method is being adapted to several domestic construction sites. Therefore, it is really necessary for the maintenance technology about long-term serviceability and durability of shield tunnel. In this paper, it would arrange the basis for reasonable evaluation of tunnel by the data analyzing through the site investigation concerning the crack and leakage which can occur by the maintenance of domestic large diameter shield TBM method.
        17.
        2013.04 서비스 종료(열람 제한)
        As numbers of tunnel are increased, the necessity of temporary maintenance works of those tunnels is also increased. This study introduces new space truss frame system for the maintenace of tunnels. Proto-type model was analyzed and evaluated. The result shows that new system may contribute to save the maintenance cost and time.
        18.
        2012.09 KCI 등재 서비스 종료(열람 제한)
        본 연구에서는 콘크리트 구조물의 합리적인 압축강도 및 탄산화 예측식을 제안하고, 이 제안식의 현장적용을 통한 보다 효율적인 터널 진단 및 유지관리 기법을 개발하였다. 이를 위하여 공용연수가 약 30년 이상 경과하였으며, 약 15년 동안 수회에 걸친 진단 및 점검으로 무수히 많은 현장 내구성 측정 데이터가 축적된 서울메트로를 대상 시설물로 선정하였다. 압축강도 및 탄산화 분석결과 80% 이상의 정확도를 확보하는 각각의 예측식을 도출하였으며, 기존 제안식과의 비교분석을 통하여 본 연구 제안식의 신뢰도를 확인하였다. 또한 제안식의 현장적용 결과 압축강도 및 탄산화 깊이에 대한 예측치의 평균오차율이 약 20%내외로서 80% 이상의 높은 정확도를 확보하는 것으로 분석되어 현장적용의 적합성을 확인하였다. 현장조사 전 내구성 예측 맵(Map)을 활용한 효율적인 유지관리 기법을 개발하였다. 예측 맵(Map) 활용 시 진단기술자 및 시설물 담당자는 설계기준강도에 미달되거나 탄산화로 철근부식 가능성이 높은 취약부위를 한 눈에 파악할 수 있으므로 일일이 조사를 수행하는 과정에서 취약부위를 도출해야 하는 현 조사기법 보다 효과적으로 터널 조사 및 유지관리를 수행할 수 있을 것으로 기대된다.
        19.
        2012.05 서비스 종료(열람 제한)
        According to the analysis results of the maintenance monitoring which are located on the 5, 6th subway line, they are analyzed that the stress of concrete lining and reinforced bar are converged gradually after 45 months. Therefore Monitoring of measurement and analysis frequency is conduct more often within about 4 years after the measuring instrument installation. Four years later, slowing the frequency of measurement is considered reasonable.
        1 2