KEPCO KPS is the contractor for the full system decontamination (FSD) of Kori Unit 1 and under preparation such as modification, lay out for equipment installation, setting up tie-in/out point for chemical injection and way to pressurize the system, of its successful performance. In this research, KPS introduced how KPS has designed and prepared for the FSD project and how will the chemical decontamination process be implemented. As described in the previous research, chemical decontamination process is planned to be conducted for three cycles and each cycle is consisted of oxidation, reduction, decomposition, and purification. Oxidation and reduction process were conducted at 90°C. Chemical decomposition and purification process were conducted at 40°C due to the damage of IX by the heat. If the decontamination result does not meet the target DF and the dose rate, additional cycle can be conducted. Expected volume of process water for FSD is 200 m3. Three systems have been designated as decontamination targets: reactor coolant system (RCS), residual heat removal system (RHRS), chemical volume control system (CVCS). For the steady flow rate, existed plant equipment such as reactor coolant pump (RCP) will be operated and modifications on some components will be conducted. Due to the limited space for installation, decontamination equipment and other resources are distributed to three different places. KPS designed the layout of equipment installed inside the containment vessel. The layout contains the information of shielding for highly radiated equipment such as IX and filter skid.
Kori Unit 1 nuclear power plant is a pressurized water reactor type with an output of 587 Mwe, which was permanently shut down on June 18, 2017. Currently, the final decommissioning plan (FDP) has been submitted and review is in progress. Once the FDP is approved, it is expected that dismantling will begin with the secondary system, and dismantling work on the primary system of Kori Unit 1 will begin after the spent nuclear fuel is taken out. It is expected that the space where the secondary system has been dismantled can be used as a temporary storage place, and the entire dismantling schedule is expected to proceed without delay. The main equipment of the secondary system is large and heavy. The rotating parts is connected to a single axis with a length of about 40 meters, and is complexly installed over three floors, making accessibility very difficult. A large pipe several kilometers long that supplies various fluids to the secondary system is installed hanging from the ceiling using a hanger between the main devices, and the outer diameter of the pipe is wrapped with insulation material to keep warm. In nuclear secondary system decommissioning, it is very important to check for radiation contamination, establish and implement countermeasures, and predict and manage safety and environmental risks that may occur when cutting and dismantling large heavy objects. So we plan to evaluate the radiation contamination characteristics of the secondary system using ISOCS (In- Situ Object Counting System) to check for possible radioactive contamination. According to the characteristics results, decommissioning plans and methods for safe dismantling by workers were studied. In addition, we conducted research on how to safely dismantle the secondary system in terms of industrial safety, such as asbestos, cutting and handling of heavy materials and so on. This study proposes a safe decommissioning method for various risks that may occur when dismantling the secondary system of Kori Unit 1 nuclear power plant.
Cars using diesel have always had problems with reducing exhaust fumes, and have been studied steadily in this regard. There were studies on the remanufacturing effect of DOC catalyst deactivated by diesel vehicle smoke reduction device, analysis of vehicle fire accident cases caused by damage to diesel vehicle smoke reduction device, and related studies on the remanufacturing effect of diesel vehicle smoke reduction device DPF. This study is also to develop an exhaust flow control unit suitable for an exhaust engine to completely burn smoke generated by an engine using a diesel engine in a low temperature exhaust gas. The main systems to be developed are high-performance heaters, burner structures that can maintain ignition in exhaust flows, and exhaust flow control units that reduce exhaust gas backflow effects caused by diesel engines.
하도급거래의 현실은 수직적 구조를 특징으로 하기 때문에 계약관계에서 우월적 지위가 전제된다. 이러한 구조적 문제점으로 인한 불공정 하도급거래행위를 억제하고 공정한 하도급거래 시장 환경을 구축하기 위한 다양한 제도적 장치가 마련되어 왔다. 하지만 경제나 기술적 환경, 노동시장의 변화 등으로 인하여 하도급계약을 둘러싸고는 여전히 많은 쟁점이 도출되고 있으며 이에 대한 제도적 접근에 대한 논의가 진행되고 있다. 최근 논의가 활발해지고 있는 납품 단가 연동제 역시 COVID-19나 우크라이나 사태와 같이 평소 예기치 못한 특별한 사정이 발생하여 원자재 가격 등이 상승함으로 발생한 위험을 하도급 계약의 당사자 간에 어떻게 분담할 것인가에 대한 논의를 다시 촉발시켰다. 원자재 가격 등이 급등하여 하도급계약에서 정한 제품이나 용역을 제공하기 위해 필요한 비용이 크게 증가하였음에도 불구하고 납품단가에 대하여 다시 검토하지 않는 것은 원사업자의 우월적 지위를 남용하여 수급사업자에게 실질적 으로 하도급계약을 통한 대가를 인하하는 것과 같은 불이익을 주게 될 수 있다.이러한 점을 고려하면 현행 조정협의제의 실효성에 한계가 노정된 경우 납품 단가 연동제를 통한 보완책을 마련하는 것은 고려할 수 있는 하나의 대안으로 생각된다. 그러나 건설 하도급거래는 전통적으로 도급계약이 가장 많이 활용되는 분야이다. 아울러 건설공사는 통상의 제조업과는 달리 정형적인 제품을 일률적으로 생산 하는 것이 아니라 발주자의 수요에 따라 다양한 형태의 생산물이 요구된다. 그리고 건설공사의 수직적 구조에 참여하는 다양한 건설주체들에 의해 만들어 지는 중간생산물이 긴밀하게 연계되어 최종 생산물을 완성하게 된다. 결국, 건설공사를 이루는 수직적 구조에서는 참여자 간에 협의 및 조정을 통한 협력이 매우 중요하다. 따라서 하도급대금의 조정에 관한 입법정책은 계약의 당사자들 간의 자발적 협의 및 조정을 강화할 수 있는 방향으로 설계되고 운용되는 것이 바람직할 것이다.
Bypass line과 Catalyst를 공간적으로 결합한 Bypass 일체형 탈질설비를 제안하였다. 탈질설비 내부에 설치되는 Bypass의 개폐장치 의 형태에 따른 Catalyst로의 유동 변화를 확인하기 위하여 상용프로그램인 Ansys Fluent를 사용하여 탈질설비를 모델링하고 시뮬레이션을 구성하였다. 탈질설비 내의 Catalyst로 인한 계산시간과 Mesh의 수를 줄이기 위해 Porous media방식으로 Catalyst를 모델링하였다. Catalyst로 의 입구각도와 Bypass 개폐장치의 크기를 변화시키면서 시뮬레이션을 수행하고 시뮬레이션의 결과로 Catalyst로의 유동 평균속도와 균일도의 변화를 확인하였다.
IMO에서는 선박으로부터 온실가스 감축을 위해 선박의 에너지효율 증진에 관한 논의를 진행하고 있다. 현재, 선박으로부터 발생되는 폐열을 이용한 ORC 발전 시스템을 적용함으로써 선박으로부터 높은 에너지 변환 효율을 기대할 수 있다. 이 기술은 물보다 더 낮은 온도 범위에서 증발하는 프레온 또는 탄화수소 계통의 유기 매체를 작동 유체로 사용한다. 이를 통해 상대적으로 낮은 저온에서 증기 (기체)를 생성 및 동력을 발생시킬 수 있다. 본 연구에서는 유기 랭킨 사이클인 ORC 발전 시스템에서 냉매와 폐열 사이 열·유동해석 (Analysis of Heat flow)을 3D 시뮬레이션 기법을 이용하여 구조물의 내·외부에 흐르는 유체가 온도 변화, 속도 변화, 압력 변화 및 질량 변화를 통해서 구조물에 어떤 영향을 미치는지를 분석하고자 하며, 동 연구는 이 기법을 이용하여 ORC 발전 시스템에서 냉매와 선박 주기 관의 배기가스로부터 일어나는 열교환기의 열전달을 해석하였다.
디젤엔진에서는 2차 분사 시스템은 다양한 배기 시스템에 적용이 가능하고, 엔진 제어와 관계없이 독립적으로 제어가 가능하기 때문에 환원제 희석 면에서도 후분사 또는 다른 농후한 환원제 분위기 형성 방법 등에 비해 장점이 많다. 2차 분사 시스템에서는 환원제의 공급 방법에 따라서 촉매의 효율은 달라질 수밖에 없다. 환원제는 일정압력 이상으로 유지 및 최적화가 필요하고, 인젝터의 위치 및 각도의 선정은 매우 중요한 인자이다. 본 논문에서는 2차 분사 조건을 변화시켜 환원제의 농도와 양을 변화시켰다. De-NOx 촉매 시스템에서 최대의 NOx 정화 효율에 적합한 환원제 분사 조건들의 선정이 필요하고, 분무 도달거리, 분무 평균 입경, 분무각, 분사량 등의 분무 특성과 환원제의 균일 분포를 잘 파악하여야 한다. 이와 같은 목적을 위하여 2차 분사에서 충돌판 형상에 의한 분무 및 거동 특성은 가시화 방법과 디지털 화상 처리 기법을 사용하여 분석하였으며, 충돌판 형상의 영향성과 각 형상에 대한 최적 각도 범위를 도출하였다.
국내 최초로 건설된 가압경수로형 발전소인 고리1호기는 1978년 4월 첫 상업운전을 개시하였고, 2017년 6월 18일 영구정지 될 계획이다. 고리1호기에서는 사용후핵연료가 사용후핵연료저장조로 모두 이송된 이후, 계통 표면의 선량율을 감소시키기 위한 목적으로 전계통 제염을 실시할 계획이다. 이 논문에서는 해외 원전의 계통제염 사례분석을 통해 국내 최초로 시행될 예정인 고리1호기의 계통제염 운전개념을 기술하고자 하였다.
In this paper, we present the result of investigations pertaining to the development of links between unit modules of the floating type photovoltaic energy generation system made of Pultruded FRP. Since the FRP has an excellent corrosion-resistance and high specific strength and stiffness, the FRP material may be highly appreciated for the development of the floating type photovoltaic energy generation system. we discussed the development concepts of the link between unit module of floating type photovoltaic energy generation system made of PFRP, tire, and synthetic fiber, briefly. The floating type photovoltaic energy generation system linked between unit modules is installed successfully at sea site.