검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 70

        41.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.
        4,000원
        42.
        2012.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Risk Assessment to list possible safety disasters and their probability and severity is the starting point for effective safety management on construction project site. However, the safety managers in owners, construction supervisors, contractors, and sub-contractors still have difficulties in judging the priorities of safety activities and preparing responses to each potential safety disasters. Therefore, this study aimed to suggest a systematic method in assessing safety risk prior to commencement with the agreement of stakeholders. FMECA(failure mode effects and criticality analysis) was selected as a main assessment tool and it was modified according to the characteristics of construction projects and trades. Each risk is, firstly, evaluated with occurrence probability, possible loss and impacts to projects, and detections, and then risk priority number(RPN) is calculated. Subsequently, the managers of each stakeholder discuss the types, timing, and responsibilities of responses as a group decision-making process.
        4,000원
        43.
        2012.04 구독 인증기관 무료, 개인회원 유료
        Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.
        4,200원
        45.
        2010.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Establishing a framework, to explain the path to safety accidents considering major safety management factors such as physical conditions including on-site activities and workplace, as well as human factors as to labor, supervisors, or managers, would be effective as the basis to control project's risks by preventing disasters. Therefore, this study aimed to clarify the mechanism in safety management and disaster occurrence. In order to accomplish the purpose, it identified and classified the factors related to accidents, reviewed the causal relationships among them, and suggested the influence diagram. The results of this research are expected to contribute to reinforcing the preventive management, and facilitating the development of integrated site control system based on safety risks.
        4,200원
        46.
        2009.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The examples of developing a building site after the Woongjin period are mainly found in temple sites, tile-roofed building sites of unidentified features, and palace remains including the pavilion site with the river in the front(임류각지) inside the Castle of Gongsan, Gongjoo,. In case of the Hanseong period, a glimpse of the features has been gained in Poongnab mud castle and Mongchon mud castle, but the excavated relics are not yet enough to make some data out of them. After the Woongjin period of Baejae, the earth-ramming development method was used mostly to construct a building site, which is divided into horizontal and slant raising of the ground level. Both are used simultaneously, but there are the significant differences in the way of raising the ground level between them. Particularly, in case of the Wanggoong-ri relics in Iksan, the ground level was raised in a narrow line slantly, which is differentiated from other slant raising of the ground level, and its time of construction also is after that of others. In addition, the board-building development method used for narrow space is usually found in the remains since the seventh century. However, there are not enough the relics of Baekjae to reveal the whole aspect of building site development. It should be studied later through the subsequent excavation and research.
        4,800원
        47.
        2009.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As shown in the accident analysis from 2007, it has been found that causes of accidents on large-scale projects are different from those found in general construction projects. A 300-question survey regarding systematic and practical aspects of safety problems at construction sites was distributed to ten (10) different companies. Participants were to respond subjectively, so that the results could be used to assemble the first formal questionnaire survey. They were collected and compiled by an advisory committee for this study. The resulting surveys were then sent to the division chiefs of the top 100 construction companies in Korea, in order to improve the response rate. The Department of Safety & Health Direction, and the :Ministry of Labor, ROK sent the same sheets to medium and small construction companies that placed within 101-200th of all Korea construction companies. The above safety engineers were classified into four (4) levels, from 1st to 4th, followed by the project dollar amount and risk level. Formulae were developed to assign safety engineers to construction sites by engineer level, the project dollar amount, and the project risk level. Conclusions are summarized as follows: 1) Reviewing the assignment system of experienced safety engineers to large scaled projects - The more experienced the engineers assigned to a project, the higher the level of accident prevention. 2) Enforcing the assignment of advanced level safety engineers to large-scaled sites - At least one advanced-level safety engineer should be assigned to construction sites with projects valued at 15million USD (15,000,000,000). 3) For assigning safety engineers by risk level - Twenty models have been developed to calculate the number of safety engineers to be assigned by risk level. In the future, risk level for each job should be established by the government (as is now the practice in Germany).
        4,000원
        49.
        2008.10 구독 인증기관·개인회원 무료
        Bt crystal proteins, encoded by cry genes, are a group of insecticidal proteins unique in the Gram-positive and spore-forming bacterium, Bacillus thuringiensis. These cry genes are widely applied as one of the most successful candidates for constructing transgenic crops resistant to pest insects. In our previous report, we found Cry1-5 had high insecticidal activity against Spodoptera larvae although its amino acid sequences showed high similarity (95.6%) to those of Cry1Ac which had low activity. In comparison with Cry1Ac, Cry1-5 had 12 different residues on domain I and II. In order to convert these residues to Cry1-5 randomly, 10 mutagenic primers were designed. Through multi site-directed mutagenesis, we mutated the modified cry1Ac gene by plant codon usage in pOBI-Modcry1Ac based on cry1-5 and constructed 63 mutant cry genes. Among them, 10 mutant cry genes on domain II were selected and their recombinant proteins were expressed by baculovirus expression system. From bioassay results to P. xylostella and S. exigua, we found some mutants have high insecticidal activities to be applicable to transgenic crops.
        50.
        2008.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        According to statistics released by the Ministry of Labor for the past 6 years, work-related accidents in the construction industry have been on the continued increase, resulting in social and economic losses that are difficult to determine at an exact amount. However, the number will likely get much bigger if unreported cases are included, considering the fact that the aforementioned statistics are based soley on the applications filed with Korea Workers' Compensation and Welfare Service. The practice of businesses choosing not to report and dealing with industrial accidents in an unauthorized manner is defined as "concealment of industrial accident". The reason the employers tend to engage in the concealment practice even at their huge cost is a "pre-qualification" scheme for the applicants in the government procurement process. Under the pre-qualification scheme, the applicants with a high rate of industrial accidents receive a low grade and become less attractive candidates in the procurement process, thus losing an opportunity to win a contract. Such failure relates directly to the fate of business organizations, to survive or not. That is why they are making all-out efforts to obtain a high grade in the pre-qualification evaluation. With regard to the accident-concealment problem, the following can be mentioned as preventive measures: (1) To exclude a rate of industrial accidents from the pre-qualification scheme; (2) To strengthen the institution of imposing penalties on the occurrence of industrial accidents; (3) To introduce private insurance system to the current industrial accident compensation insurance; and (4) To give non-recognition treatment to industrial accidents that were not reported upon occurrence. In conclusion, the concealment problem can be resolved if the aforementioned measures are to be taken continuously along with corrective measures against institutional deficiencies.
        4,000원
        51.
        2008.05 구독 인증기관·개인회원 무료
        Bt crystal proteins, encoded by cry genes, are a group of insecticidal proteins unique in the Gram-positive and spore-forming bacterium, Bacillus thuringiensis. These cry genes are widely applied as one of the most successful candidates for constructing transgenic plants resistant to pest insects. In our previous report, we found Cry1-5 had high insecticidal activity against Spodoptera larvae although its amino acid sequences showed high similarity (97.9%) to those of Cry1Ab which had low activity. In comparison with Cry1Ac, Cry1-5 had 12 different residues in domain Ⅰ and domain Ⅱ, and we focused on domain Ⅰand domain Ⅱ regions and designed 10 mutagenic primers to change 12 residues. Through multi site-directed mutagenesis, we mutated the modified cry1Ac gene by plant codon usage in pOBⅠ-Mod-cry1Ac based on cry1-5 and constructed 63 various mutant cry genes. In the further study, we will express those mutant proteins as a fusion form with polyhedrin using baculovirus expression system and subsequently do bioassay to Spodoptera larvae.
        52.
        2008.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        이 연구는 2003년부터 2006년까지 4년간 대구시 수성구 팔현리 백로류 집단번식지 인근의 도로공사가 백로류 번식에 미치는 영향을 분석하였다. 2003년부터 2005년까지 3년간 공사가 진행되면서 백로류 개체수는 감소하였다. 공사가 중단된 2006년에는 황로를 제외한 왜가리와 중대백로의 개체수가 증가하였고, 왜가리는 다른 백로류에 비해 공사의 영향을 가장 많이 받은 것으로 나타났다. 중대백로, 쇠백로 및 해오라기의 개체수도 공사기간동안 감소하였다. 둥지목의 벌목과 번식지의 일부가 절개된 후 백로류의 둥지는 도로변에서 번식지의 안쪽으로 이동하는 경향이 나타났다. 조사기간 동안 번식지내 백로류의 분변으로 인한 고사목의 증가와 태풍으로 인한 도복으로 둥지목의 그루 수는 감소하였고, 둥지목 당 번식 둥지의 수는 늘어났다. 둥지목의 구성비율은 매년 소나무의 비율이 낮아지고, 아카시와 참나무의 비율이 증가하였다.
        4,000원
        53.
        2008.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Safety training for foreign workers should be thoroughly done. But it has not been done well even if field safety manager understand that the training has not been well provided. 72% of responders (Safety Managers) at field thinks that safety training has not been well provided at a site. It is shown that there are not any additional measures to correct this problem. Eventually, the reasons of that the training is not well provided, and foreign workers do not understand safe condition at site, well lead to an accident at construction site.
        4,000원
        54.
        2007.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding and lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.
        4,500원
        57.
        2005.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        As there are more accidents which are more serious in construction site than other industries, it needs the safety management system to be SLIM on the same time, There are still lots of difficulties to prevent those accidents exactly, so it also needs a safety supervision team to prevent the accident, unsafe operation and condition before happening, which is also called as a Man-to-Man safety management method. The range of the job site in one personnel's management is very big and large, so it needs the personnel to keep watch the safety operation and prevent any unsafe/fire accidents. Also the personnel also should find out the unsafe points in the job site, and carefully supervise the dead angle site, then support the totally safety management POINT and realize the ZERO accident.
        4,500원
        59.
        2019.04 서비스 종료(열람 제한)
        Construction safety is one of the significant problems on the world. Deep learning is an emerging term that acquires, processes and analyses image or video data to help computers have a high-level visual understanding of the world. In recent years, it has been introduced into the construction industry for improvements of occupational health and safety. This research contributes in solving this problem by using deep learning only RGB images that output detects the hazard zone on construction sites. The main goal of this study is to use different computer vision and deep learning to develop for different cases concerning fall related hazards.
        60.
        2018.09 KCI 등재 서비스 종료(열람 제한)
        This study investigated both leaching of heavy metals and ecological toxicity when coal bottom ash (CBA) generated by power plants has been used to reduce both erosion and turbidity of surface runoff at construction sites. The Korean leaching test (KLT) method, sequential extraction method, and acute toxicity test using Daphnia magna were performed to evaluate the environmental impacts and the ecological risks of CBA. According to the results of the KLT method of CBA, trace amounts of Cu were leached at limit of quantitation whereas metal leaching was not monitored for other heavy metals. Through the sequential extraction method of CBA, the relatively high leaching potential was found for As and Pb due to greater fraction of exchangeable (F1) and bound to carbonates (F2), and reasonable probability of leaching under the reducing/anaerobic environment was expected for Cu due to high faction of bound to Fe?Mn oxides (F3). However, significantly low probability of leaching was expected for Cd, Cr, Ni, and Zn with grater fractions of bound to organic matter (F4) and residual (F5). Additionally, total amount of heavy metals in CBA was lower than criteria for soil pollution concerns, and were similar or slightly lower levels than the ‘15 National soil average concentration excluding Cr6+. Finally, acute toxicity test using Daphnia magna display no impact for mobilization and lethality in either the prefiltration or post-filtration experiment, indicating that the ecological toxicity was insignificant with zero values of toxic unit. Consequently, no environmental impacts or ecological toxicity are expected when CBA generated by power plants has been used to reduce both erosion and turbidity of surface runoff at construction sites.
        1 2 3 4