검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 431

        1.
        2024.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This study aimed to perform real-time on-site construction volume management by using Internet of things (IoT) technology consisting of 3D scanning, image acquisition, wireless communication systems, and mobile apps for new and maintenance construction of concrete bridge deck overlays. METHODS : LiDAR was used to scan the overlay before and after construction to check the overlay volume. An enhanced inductively coupled plasma (ICP) method was applied to merge the LiDAR data scanned from multiple locations to reduce noise, and an anisotropic filter was applied for efficient three-dimensional shape modeling of the merged LiDAR data. The construction volume counter of the mobile mixer was directly photographed using an IP camera, and the data were transmitted to a central server via the LTE network. The video images were transmitted to the central server and optical character recognition (OCR) was used to recognize the counter number and store it. The system was built such that the stored information could be checked in real time in the field or at the office. RESULTS : As a result of using LiDAR to check the amount of overlay construction, the error from the planned amount was 0.6%. By photographing the counter of the mobile mixer using an IP camera and identifying the number on the counter using OCR to check the quantity, the results showed that there was a 2% difference from the planned quantity. CONCLUSIONS : Although the method for checking the amount of construction on site using LiDAR remains limited, it has the advantage of storing and managing the geometric information of the site more accurately. Through the IoT-based on-site production management system, we were able to identify the amount of concrete used in real time with relative accuracy.
        4,000원
        3.
        2024.04 구독 인증기관·개인회원 무료
        본 연구에서는 강합성라멘교의 벽체 배면 철근 커플러 적용 여부에 따른 두 실험체를 제작하여 하 중가력 실험을 수행하였다. 그 결과 공법에 적용된 주요 기술에 대한 구조적 안전성 및 적정성을 확인 하였으며, 실험체는 설계 내하력 대비 충분한 안전성을 확보하고 있음이 확인되었다. 또한, 경간장 17.3m, 교폭 3.0m, 높이 3.25m의 실험체에 대한 정적성능실험 및 동특성 측정 실험을 수행하였으며, 그 결과 설계 내하력 대비 충분한 안전성을 확보하고 있는 것으로 나타났다.
        4.
        2024.04 구독 인증기관·개인회원 무료
        PSC(Prestressed Concrete)거더 교량은 긴장재(강선)를 통하여 교량 양쪽에서 압축력을 추가하는 방 식으로 외부에 대한 저항력을 확보한다. PSC 거더 교량의 긴장 방식에 따라 콘크리트 타설 전(프리텐 션)과 타설 후(포스트텐션)로 구분할 수 있다. 반면에 프리텐션 긴장의 경우 강선이 구조물과 직접 결 합하는 방식이기 때문에 전용관 삽입 및 그라우트 채움 공정이 생략되어 하중이 비교적 가벼울 뿐만 아니라, 긴장재 부식 방지를 위한 유지관리에 매우 효율적이다. 그러나 프리텐션 긴장 방식은 별도의 긴장 시설이 필요하므로 주로 공장에서 제작되고, 건설 현장까지 이동이 필요하기 때문에 길이 (L=18m) 및 무게(W=30tonf)의 제한이 있다. 프리텐션 긴장 공법의 경우 별도의 반력대 및 긴장 시설 이 필요하여 주로 공장에서 제작하고 현장으로 이동 및 설치되고 있다. 도로를 이용한 이동이 필요하 기 때문에 거더의 경간 및 중량의 제한이 발생하게 된다. 따라서, 경간장 25 m 이상의 거더의 경우 포스트텐션을 통한 현장 제작이 주로 이루어 지고 있다. 본 연구에서는 별도의 시설없이 현장에서 프 리텐션 긴장이 가능한 PSC 거더 시공 공법을 제안하였다. 또한, 장경간 PSC 거더 제작을 위한 포스트 텐션 기반의 세그먼트 제작 공법을 제안하고, 그 성능을 검증하였다.
        6.
        2024.02 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : This study aimed to secure the work space in alarm valve rooms to ensure stable working conditions for the engineers. METHODS : We analyzed situations where alarm valve room work spaces were inadequately secured posing a problem. Using the Ovako working posture analysis system (OWAS) method, we measured the body size of adult male technicians and their tools to analyze the actual space needed for them to maintain a healthy posture while working. On this basis, we proposed regulations governing workspace size and acceptable durations for unstable body postures. RESULTS : By measuring valve room work space and technician body size, we found that the workspace was inadequate for technicians. Applying OWAS showed that securing more space in the valve room improved the construction stability. CONCLUSIONS : Regulations on valve room size and appropriate work space for technicians will improve construction and inspection stability. This reduces the probability of poor construction and inadequate inspection, increasing the reliability of the firefighting facility system.
        4,000원
        7.
        2023.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : In this study, the basis for improving the maintenance method of road pavement in Jeju Island, where deterioration is accelerating, was presented through field construction and analysis of various combinations of maintenance methods. METHODS : Construction was performed on Jeju Island's Aejo Road, which has high traffic and frequent early damage, using various asphalt mixtures mainly applied in Jeju Island, with different maintenance cross-sections depending on the level of repair. The quality and performance of the asphalt mixture collected during construction were evaluated, and MEPDG was used to analyze the service life according to the type and maintenance level of the mixture. RESULTS : While the mixture for the surface layer satisfied the quality standards and had excellent rutting and moisture resistance performance, the asphalt mixture for the intermediate and base layer did not satisfy the quality standards such as air voids, so it was judged that quality control was necessary during production. The section repaired to the base layer was found to be advantageous for the integrated behavior of the pavement and had the best structural integrity. As a result of predicting the service life, the estimated life of the section where only the surface layer was repaired was analyzed to be approximately 7 years, the section where the intermediate layer was repaired was 14.5 years, and the section where the entire section up to the base layer was repaired was analyzed to be 18 years. CONCLUSIONS : In Jeju Island, where deterioration is accelerating, it was analyzed that when establishing a maintenance plan, it is necessary to consider repairing the middle and base floors in order to secure the designed life of 10 years.
        4,000원
        12.
        2023.06 구독 인증기관 무료, 개인회원 유료
        4,000원
        14.
        2023.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        완공된 건물과 달리 시공 중인 건물은 설계단계와 다른 하중 작용 및 콘크리트 강도 미발현 등 다양한 요인에 의해 설계단계에서 검 토한 하중을 초과하는 하중이 작용하여 건물의 안전성에 문제가 생길 위험이 있다. 또한 시공 중인 건물에 지진이 발생할 경우 더 큰 피해가 발생할 가능성이 있다. 따라서 이 연구는 전형적인 다양한 규모의 5층, 15층, 25층, 60층 예제모델을 작성하고 골조완성도에 따 른 시공단계 모델을 통해 시공 중인 건물의 지진하중의 영향을 분석하였다. 시공 중인 건물의 시공기간은 완공단계 이후의 사용기간 에 비해 매우 짧으므로 설계단계와 동등한 수준의 지진을 적용하는 것은 과도한 하중이 적용될 수 있으므로 시공단계 모델에 재현주 기 50~2,400년의 지진을 적용하여 지진하중을 검토하고 부재단면성능을 분석하였다. 그 결과 설계단계를 초과하는 하중의 여부 및 구조적 안전성 확보가 가능한 수준의 지진재현주기를 검토할 수 있었다. 또한 각 예제모델의 시공기간을 가정하여 시공기간에 따른 지진재현주기를 선정하고 선정한 재현주기의 설계 적절성을 확인하였다.
        4,000원
        1 2 3 4 5