검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 20

        1.
        2022.11 구독 인증기관·개인회원 무료
        The government has recently introduced the human rights management system of public institutions in accordance with the OECD guidelines for multinational corporations and the UN guidelines for business and human rights implementation. For this reason, public institutions receive a human rights impact assessment to be reflected in the institutional management evaluation based on the human rights management manual of public institutions issued by the National Human Rights Commission of Korea. Human rights impact assessment is an institution’s management activities that identify and evaluate actual and potential human rights risks in advance and is divided into institutional and business operations. The institutional operation evaluation is conducted in 10 areas, including human rights management system, employment, labor rights, industrial safety, supply chain, and local residents’ protection, and the project operation evaluation is conducted by itself or by a specialized institution by selecting main projects and fields that can affect human rights of stakeholders. This study compares and analyzes the results of the human rights impact assessment of public institutions and specialized institutions and derives how much they contribute to improving human rights risk and respect for human rights, and what will be improved in the future. Therefore, the results of this study are expected to be of great help in the introduction and internalization of the human rights management system of public institutions.
        3.
        2021.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        원자력시설 SPRA 방법으로서 기기 사이 부분 종속 관계를 정확하게 고려하기 위하여 샘플링기반접근법이 개발된 바 있다. 그러나 이는 샘플링 기반 방법이므로 정확한 지진 리스크 산정을 위하여 많은 수의 샘플을 추출해야 하는 단점이 있다. 이에 따라 본 연구에서 는 기존 방법을 개선하기 위한 효과적인 방법을 제안한다. 본 연구에서 제안한 방법의 주요한 특징은 다음과 같다. 기존 샘플링방법인 몬테카를로샘플링(MCS) 방법을 대신하여 다차원에서 효과적인 샘플링이 가능한 라틴하이퍼큐브샘플링(LHS) 방법을 샘플링기반 SPRA에 도입한다. 또한, 기존 지진세기 세분화 정도를 최종 지진 리스크 결과와 연계하여 결정한다. 제안된 방법이 결합된 샘플링기반 SPRA 접근법을 실제 원전 예제에 적용한 결과, 제안된 방법이 기존의 방법과 비교하여 결과 정확도에 있어서 거의 비슷하나 총 샘플 추출수 기준에서 효율성을 약 2배 가량 높이 것을 확인하였다. 또한, 샘플링 개수가 적은 영역에서 LHS 기반 방법이 MCS 기반 방법보다는 해의 정확도를 높이는 것을 확인할 수 있었다.
        4,000원
        4.
        2020.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In general, companies operate systematically in response to financial risks such as exchange rates and liquidity, while they are vulnerable to risks in the manufacturing and sales processes. In particular, logistics refers to the activities for planning, managing and implementing efficient flows from the starting point of goods and products to the point of consumption, The purpose of this study was to develop key risks and key risk management indicators (KRIs) for risks that undermine logistics efficiency so that logistics risks can be effectively prevented and managed. As a result, 40 risk management indicators (KRIs) were developed in a total of six categories in the logistics sector, and the definition, calculation method and early warning grade of each KRI were presented so that companies could prevent risks in advance in logistics activities and contribute to enhancing efficiency of their work.
        4,000원
        5.
        2020.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In this study, we develop a sampling-based seismic probabilistic risk assessment (SPRA) quantification technique that can accurately consider a partially dependent condition of component seismic fragility information. Specifically, the SPRA quantification method is proposed by combining the advantages of two representative methodologies: EPRI seismic fragility and JAERI seismic fragility input-based quantification. The most important feature of the proposed method is that it performs a SPRA using a sampling technique by transforming the EPRI seismic fragility input into JAERI seismic fragility input. When the proposed sampling-based approach was applied to an example of simple system and to a SPRA problem of a nuclear power plant, it was observed that the proposed method yields approximately similar system seismic fragility and seismic risk results as those of the exact solution. Therefore, it is believed that the approach proposed in this study can be used as a useful tool for accurately assessing seismic risks, considering the partial seismic dependence among the components; the existing SPRA method cannot handle such partial dependencies.
        4,000원
        6.
        2019.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구는 수중활동에서 나타나는 인체의 생리적 변화와 알코올 섭취로 인한 생리적 변화를 살펴보고 알코올 섭취가 스쿠버다이버에게 미치는 영향을 규명하는데 그 목적이 있다. 미국 내부통제연구소위원회의 내부통제 프레임워크를 기초로 본 연구에 적합하도록 새롭게 정립한 ‘리스크 평가 및 분석(RAA, risk assessment and analysis)’ 기법을 활용하여 알코올 섭취 전과 후의 리스크 분석을 실시하였다. RAA기법은 리스크 간 상관관계를 분석하는 1단계, 리스크를 정량화하고 리스크 데이터베이스를 구축하는 2단계, 그리고 이를 도식화하여 리스크맵을 분석하는 3단계로 이루어져 있다. RAA기법을 통해 알코올 섭취로 인한 수중활동의 리스크수준이 전반적으로 증가하여 고위험군의 비율이 높아진 것을 확인하였고 리스크수준의 정량화와 고위험군 분류를 통해 리스크관리 측면에서 우선통제대상을 지정할 수 있었다. 본 연구 결과는 알코올 섭취 후 행해지는 스쿠버다이빙의 위험성을 명확하게 알리고 이에 대한 스쿠버다이버들의 의식 개선을 도모하여 보다 안전한 스쿠버다이빙 환경을 제시할 수 있을 것으로 기대한다.
        4,000원
        8.
        2016.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The project schedule risk in the engineering and facility construction industry is increasingly considered as important management factor because the risks in terms of schedule or deadline may significantly affect the project cost. Especially, the project-based operating companies attempt to find the best estimate of the project completion time for use at their proposals, and therefore, usually have much interest in accurate estimation of the duration of the projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, and then performing risk assessment with simulation such as Monte-Carlo simulation method. However, since these approaches require the accumulated executional data, which are not usually available in project-based operating company, and, further, they cannot reflect various schedule constraints, which usually are met during the project execution, the project managers have difficulty in preparing for the project risks in advance of their occurrence in the project execution. As these constraints may affect time and cost which role as the crucial evaluation factors to the quality of the project result, they must be identified and described in advance of their occurrence in the project management. This paper proposes a Bayesian Net based methodology for estimating project schedule risk by identifying and enforcing the project risks and its response plan which may occur in storage tank engineering and construction project environment. First, we translated the schedule network with the project risks and its response plan into Bayesian Net. Second, we analyzed the integrated Bayesian Net and suggested an estimate of project schedule risk with simulation approach. Finally, we applied our approach to a storage tank construction project to validate its feasibility.
        4,000원
        9.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The objective of this study is to investigate and evaluate that a roadside tree root intrudes sewer network systems. Two approaches were performed to assess the characteristics of tree root intrusion. First, the characteristics of tree roots that had invaded sewers were directly observed by means of closed-circuit television inspection robot. Second, the intrusion proportions of tree root into rain gutters in the sampling area were investigated. As tree species of low intrusion proportions, the results indicated that Ginkgo biloba Linn. and Acer buergerianum Miq. were 1.7% and 4.3%. On the other hand, tree species of high intrusion proportions were Metasequoia glyptostroboides Hu et Cheng, Ulmus davidiana var. japonica Nakai and Zelkova serrata Makino as 22.2%, 20.4%, and 17.6% respectively. In particular, sewers and gutters around Zelkova species should be the focus of maintenance work because of the high proportion of these trees on roadsides.
        4,000원
        10.
        2014.10 KCI 등재 구독 인증기관 무료, 개인회원 유료
        원전의 항공기 충돌 리스크 평가에 사용되는 대표매개변수를 선정하기 위한 방법론을 개발하였다. 대상 원전은 국내의 대표적인 경수로형 원전 중 하나로 선정하여 3차원 유한요소 해석 모델을 구축하였다. 콘크리트 재료모델에는 소성손상모델이 적용되었으며, 강재는 다중선형곡선거동을 가지는 것으로 모델링하였다. 운동에너지, 전체 충격량, 최대 충격량, 최대 하중 등 4종의 대표매개변수 후보군을 선정하였다. 각각의 매개변수 후보군은 모두 충돌 속도와 질량의 함수로 표현되므로, 충돌속도 50~200m/s, 항공유량 30~90%의 범위에 대하여 매개변수값을 도출하고 충돌 해석을 수행하여, 충돌 시의 구조 응답과의 상관관계를 분석하였다. 모든 해석에서 항공기의 기종은 보잉767 기종으로 선정하였다. 충돌해석에는 Riera의 하중-시간이력 함수를 이용한 해석기법을 적용하였다. 매개변수와 충돌 시 응답의 상관관계 적합성은 결정계수값을 이용하여 분석하였다. 4 종의 대표매개변수 후보군 중 최대 하중값이 가장 직관적일 뿐만 아니라 본 연구에서의 해석 케이스에서는 응답과의 상관성도 가장 뛰어난 것으로 나타남에 따라, 항공기충돌 리스크 평가를 위하여 가장 적합한 매개변수라 할 수 있을 것으로 판단되었다.
        4,600원
        11.
        2013.10 구독 인증기관·개인회원 무료
        The project-based business companies usually have much interest in predicting the expected finish date and related probability of project completion to refer at their proposals for projects. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, then performing risk assessment with Monte-Carlo simulation method. However, since these approaches cannot reflect various schedule constraints, the project managers cannot prepare for the project risks in advance of their. This paper proposed a methodology for predicting project schedule risk by identifying and enforcing the constraints which may occur in a storage tank engineering and construction project environment. We applied our approach to a storage tank construction project to validate its feasibility. By using the methodology proposed in this paper, the project schedule risk can be evaluated and predicted more accurately and practically than the PERT/CPM or Monte-Carlo simulation approach.
        12.
        2011.10 구독 인증기관·개인회원 무료
        In the project management context, the impotance of risk management is increasing because the risks in terms of time and cost may significantly affect the result of the project. In general, the management of projects schedule risk is achieved by modeling project schedule with PERT/CPM techniques, then performing risk assesment with monte-carlo simulation method. However, these approach can not reflect constraints, which may be occurred during the project execution, and cope with uncertainty in the future. As these constraints may affect time and cost which are the crucial evaluation factor to the project, they must be identified and evaluated to manage the future project risk before the project is started. This paper proposes a methodology for project schedule risk management by identifying and enforcing the constraints which may be occurred in complex and uncertain project environment. First, project risk constraints are identified and categorized into time, dependancy, and branching. Then, project schedule model with constraints is converted to CPN(Colored Petri Net) which can represent all the identified constraints to assess and predict schedule risk. Finally, the expected risk of the project (in terms of time and cost) is assessed and predicted by performing Petri Net simulation. By using the methodology proposed in this paper, the risk in terms of time and cost in project schedule model can be assessed and predicted more accurately and practically than the PERT/CPM and/or Monte-carlo simulation method. Furthermore, the constraints, which may occur unexpectedly after the project launch, can be evaluated to determine the schedule risk. The expected risk can be used to decide whether risk mitigation or project termination process undertake.
        14.
        2009.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        구조물의 지진취약도 분석을 위해서는 평가용 지반응답스펙트럼의 선택이 중요한 영향을 미친다. 본 연구에서는 기존의 설계응답스펙트럼을 이용하여 평가된 전력설비에 대하여 등재해도 스펙트럼을 이용하여 취약도 변수를 치환하는 방법을 제시하였다. 제시된 방법을 이용하여 기존의 전력설비를 대상으로 도출된 고신뢰도저파손확률값(HCLPF)을 비교하였으며, 최종적으로 지진재해도 곡선을 이용하여 전력설비에 대한 정량적 지진위험도를 도출하였다. 결과적으로 설계응답스펙트럼을 이용한 지진위험도 평가는 전력설비의 지진위험도를 보수적으로 판단할 수 있는 것으로 평가되었다.
        4,000원
        15.
        2006.12 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        원자력시설 해체부지를 재이용하는 과정에서 유발될 수 있는 방사선학적 리스크를 사전에 선별하기 위한 목적으로 단순화된 방사선량 평가모델을 개발하고, 이를 Microsoft 스프레드시트와 내장된 Visual Basic 및 마크로 기능을 활용하여 기능별로 모듈화된 평가도구를 구현하였다. 이와 함께 부지 특성자료가 불충분할 경우 신속한 사전평가를 위해 적용할 수 있는 일련의 입력변수 값 목록을 제안하였다. 동일한 조건에서 이 연구에서 개발된 평가도구를 이용해 유도한 사전 선별준위가 RESRAD Ver.6.2를 이용해 계산된 유도농도지침한계 및 독일 방사선방호령에 규정된 핵종별 부지 재이용 기준농도를 합리적으로 근사할 수 있음을 확인하였다.
        4,200원
        16.
        2004.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Consumers require various quality characteristics including safety. The reduction of risk concerned on product safety becomes an urgent issue in leading companies. The strategy for customer satisfaction by choosing attractive quality characteristic is not enough for risk reduction in view of producer. This paper presents a method for choosing quality characteristics and risk characteristics by integrating QFD based on quality requirements and AHP based on safety requirements, also shows its application for complex equipment.
        4,200원
        17.
        2015.02 서비스 종료(열람 제한)
        본 연구에서는 토석류 피해가 예상되는 지역의 건물에 대한 리스크 평가방법을 제시하였다. 리스크 평가는 2011년 토석류 피해가 발생한 경기도 용인시 지역을 대상으로 하였으며, 연구지역의 강우 재현빈도를 고려한 강우량 및 토석량 산정, 프로그램을 이용한 토석류 거동모사, 토석류의 높이와 속도를 고려한 충격압 및 취약도 계산, 취약도와 건물가격을 이용한 리스크 평가의 순서로 진행하였다. 그 결과 토석류 피해예상지역의 건물에 대한 정량적인 리스크 평가에 적용이 가능하였다. 또한 토석류 피해예상지역의 건물들의 리스크 순위가 취약도 순위와 같지 않기 때문에 토석류 예방 및 복구대책 등을 수립 시 경제적 손실을 고려한 정량적인 리스크 평가가 이루어진다면 보다 효율적인 대책수립이 가능할 것으로 판단되었다.
        19.
        2014.02 서비스 종료(열람 제한)
        최근 기후변화로 인하여 재해의 빈도 및 강도가 급격하게 증가하는 등 기후변화 리스크가 증대되고 있다. 뿐만 아니라 사회·경제적 리스크와 중첩되어 매우 극단적인 양상을 보이는 등, 재난관리에 있어 기후변화 리스크를 체계적으로 관리하는 것이 핵심과제로 떠오르고 있다. 이에 따라 호주 및 영국을 비롯한 국가에서 기후변화 리스크 관리프로세스를 마련·제시하고 있다. 기후변화 리스크는 리스크 요인별·적응주체별로 주체가 겪는 리스크 영향이 달라지기 때문에, 기후변화 리스크관리프로세스 상에 기후변화 리스크 요인과 적응주체, 그리고 그 영향을 반영하여 다차원적으로 접근할 필요가 있다. 그러나 기존에 제시된 리스크 관리프로세스는 기후변화에 따른 요인별· 적응주체별· 기후변화영향을 파악하고 평가하는 측면에서 단편적으로 접근하고 있다. 또 리스크 평가와 리스크관리를 위한 정책대안을 평가하고 선택하는 단계와의 연계성이 떨어져 실질적인 역할을 기대하기 어려운 측면이 있다. 따라서 본 연구에서는 본 연구에서는 기후변화에 따른 직·간접적 리스크를 구분하고 리스크 적응주체의 특성을 반영할 수 있는 다차원적 리스크 관리 프레임워크를 구축하였다. 그리고 이를 지자체 단위의 방재부문에 적용하여 실제 적용가능성을 검토하였다.
        20.
        2012.09 KCI 등재 서비스 종료(열람 제한)
        상관관계가 높은 복합열화의 완벽한 개별예측모델의 개발은 매우 어려운 문제로, 본 논문에서는 현수교 시스템의 미래열화와 유지 예산을 예측하기 위하여, 10년간의 유지 데이터가 주어진 매개변수(파손지표와 사용성)의 사후 확률 밀도함수를 찾기 위해 베이지언 추론을 적용하였다. 마르코프 연쇄 몬테카를로법을 이용하여 매개변수의 사후 분포를 조사하였다. 감소한 사용성의 모의위험예측은 사전분포와 연간유지 업무에서 업데이트한 데이터의 가능성에 따라 작성한 사후 분포이다. 기존의 선형 예측 모델과 비교하면, 제안된 2차 모델은 교량부품의 사용성, 위험요소, 그리고 유지 예산의 측정 데이터에 대하여 매우 개선된 수렴성과 근접성을 제공한다. 따라서 제안된 2차 추계학적 회귀 모델을 기반으로 복잡한 사회간접설비의 미래 성능과 유지관리예산을 예측하고 제어할 수 있는 기회를 제공할 것으로 기대한다.