검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 107

        21.
        2017.11 구독 인증기관·개인회원 무료
        It is a system that supports efficient sharing of information by real-time communication through application and web-based collaborative work space. IOT / ICT technology into the construction site to manage the entire process in real time. It is possible to predict and prevent accidents by using real time accumulated big data information, and it is necessary to diversify research using data.
        22.
        2017.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.
        4,000원
        23.
        2017.04 구독 인증기관 무료, 개인회원 유료
        This study is intended to evaluate a risk of overseas construction companies. To achieve this, a survey was empirically carried out to overseas construction site experts. The results were as follows. The relative importance of parent factors showed that‘social culture’(0.157) was the highest, followed by ‘institutional regulation’(0.150),‘environment’(0.145),‘productivity’ (0.142),‘economic finance’(0.137),‘market condition’(0.136) and‘political policy’(0.133). As for the above-mentioned findings, the most important risk factor in overseas construction was social culture of entry countries, followed by construction-related legal system. All construction companies, contractors and design companies said that social culture was the most important parent factor, varying from construction industry. And they said that workforce availability was also the most important in the importance of sub-factors, followed by conflict due to the differences in lifestyle. Consequently, it is important to manage risk for socio-cultural factors in overseas construction, risk for double workforce, and risk for the differences in thinking or lifestyle by the participation of multinational workforce.
        4,000원
        24.
        2017.04 구독 인증기관 무료, 개인회원 유료
        The damage caused by dry weather accounts for a great deal of importance throughout the industry. construction safety manager is responsible for the most practical and important task of preventing disasters. Job training is critical to improve the ability of the safety manager. Therefore, an analysis of the operational system and the educational contents of the institution is required. The purpose of this study is to apply a specific training model for occupational training to activate the construction safety task system and improve the job competency of the safety manager. To create a specific educational model, the criteria and units of the construction safety management area presented by the NCS(National Competency Standards) were applied. Based on the task experience, the task experience was divided into four levels of managers, intermediate managers, advanced managers, senior managers, and the class of managers according to the level of duty assigned by each level of staff, organized by each level of class, and determined the method of teaching and assessing teaching methods. In the improvement of job training, the quality of education should be improved by dividing the educational content according to the level of task competency. In addition, it can be expected to increase the effectiveness of training fees and improve the quality of education by enhancing the educational quality of education fees and improving the quality of education by implementing the training sessions to implement the training sessions of the entrusted services to practice the education of the entrusted services. Applying a specific task training model along with these institutional improvements is expected to facilitate the activation of job training, enabling the ability of the safety manager to become a crucial factor in preventing the overall development of the project.
        4,000원
        25.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In construction work, safety accidents often occur in combination with unstable physical and human conditions during preparation and execution of work. In Korea, the accident rate is higher to that of any country in the world. Therefore, it is necessary to take measures by fundamental prescription. In this paper, in the case of construction safety management, we tried to find a reasonable alternative through a questionnaire survey to apply to subcontracting and small-scale construction. In conclusion, workers who are well aware of the task could be able to reduce the accident rate by deploying them as safety management officers after receiving the training.
        4,000원
        26.
        2017.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The scope of this study is the construction conformity assessment system according to the new paradigm of construction management To minimize the differences between domestic and international state, construction Conformity Assessment is subdivided into system certification and product certification. For the former, WASCON(Worldwide Assessment System of Construction Quality Maturity Stage) is applied. For the latter, AQUA(Advanced Quality Assessment System) was developed and adopted to model project for demonstration. Both systems are designed to enable quantified rating, integrated into PQCS(Project Quality Certification), which is an advanced project quality certification system. The construction work observing PQCS will gain quality score on its own quality certificate(Quality mark on construction itself or facilities is also available, if needed or preferred by customers). This Quality Rating System will inspire and encourage any related parties. PQCS score would let supplier/constructor recognize how much themselves are operating effectively and efficiently, offering them the opportunity of redeeming their weaknesses.
        4,600원
        28.
        2016.11 구독 인증기관 무료, 개인회원 유료
        Safety accident in Building construction work in the process of preparation and implementation of the insecure human, material status is often caused by combining the reality is that many things. Accident rate is a similar level in the case of Korea and foreign countries than any country in the measures by the higher fundamental prescription is needed. In this paper, construction safety management of subcontracting work and small construction plan to apply through a survey to reach a sensible alternative. I did In conclusion, the educated workers know well, and so on the work schedule then quickly if safety management personnel in disaster will be able to reduce the rate to a miracle appeared.
        4,000원
        29.
        2016.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The objective of this study is to improve safe execution of the management plan in Construction Technology Promotion Act. This research addresses the issue how to prevent the collapse of facilities under construction and after completion, improve the examination system, and execute Improvement of Safety Management Plan. To achieve this goal, research providing insights into understanding the ways in which creating and presenting safety checks and deploying safety training measures effectively is imperative.
        4,000원
        30.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently, the need for asset management(AM) plan introduction to reduce increasing O&M cost with aging water facilities is on the rise. Therefore, asset inventory classification is necessary as the first step for AM plan construction. In this study, all assets of YW water treatment plant(WTP) were classified as 5 steps. In addition, specific code name was given to each asset which can increase compatibility in constructing the AM programs among WTPs. In the future, codes for attribute and status of asset will be allocated, which can facilitate proper AM operation.
        4,000원
        31.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study analyzed the safety management efficiency through input-oriented BCC Model using DEA by making of Models, in which this study selected the number of staff affiliated with the construction site, number of staff members on the construction team, and number of safety personnel as Input Factor, along with the number of disaster victims and zero-accident accomplished hours as output elements, targeting 40-or-so apartment building construction sites which are being built by 3 domestic construction companies. As a result of efficiency, it was 0.643, the number of efficient DMU was 4. In the aspect of returns to scale, 21 construction sites(52.5%) found to be in a state of increasing returns while 14 construction sites(35%) was in a state of Decreasing returns. The reason for inefficiency was found to lie in technical factors in case of 30 construction sites(75%). Lastly, inefficient DMU is in need of 38.9 % and 66% reduction in site personnel and safety personnel. Based on study results, the 29 construction sites accounting for 72.5% of DMU for safety management efficiency evaluation object turned out to do inefficient safety management that doesn't fit the size of each company.
        4,000원
        32.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The objective of this study is to propose a quality control and quality assurance method for use during asphalt pavement construction using non-destructive methods, such as ground penetrating radar (GPR) and an infrared (IR) camera. METHODS: A 1.0 GHz air-coupled GPR system was used to measure the thickness and in situ density of asphalt concrete overlay during the placement and compaction of the asphalt layer in two test construction sections. The in situ density of the asphalt layer was estimated based on the dielectric constant of the asphalt concrete, which was measured as the ratio of the amplitude of the surface reflection of the asphalt mat to that of a metal plate. In addition, an IR camera was used to monitor the surface temperature of the asphalt mat to ensure its uniformity, for both conventional asphalt concrete and fiber-reinforced asphalt (FRA) concrete. RESULTS: From the GPR test, the measured in situ air void of the asphalt concrete overlay gradually decreased from 12.6% at placement to 8.1% after five roller passes for conventional asphalt concrete, and from 10.7% to 5.9% for the FRA concrete. The thickness of the asphalt concrete overlay was reduced from 7.0 cm to 6.0 cm for the conventional material, and from 9.2 cm to 6.4 cm for the FRA concrete. From the IR camera measurements, the temperature differences in the asphalt mat ranged from 10℃ to 30 ℃ in the two test sections. CONCLUSIONS: During asphalt concrete construction, GPR and IR tests can be applicable for monitoring the changes in in situ density, thickness, and temperature differences of the overlay, which are the most important factors for quality control. For easier and more reliable quality control of asphalt overlay construction, it is better to use the thickness measurement from the GPR.
        4,000원
        33.
        2015.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        『Act on Facilitation of Purchase of Small and Medium Enterprise – Manufactured Products and Support for Development of Their Markets』 was created and implemented. The act states that the materials designated by the Small and Medium Business Administration are directly purchased from the small and medium enterprises and provided to the construction companies so that the materials can be provided as GFGI (Government Furnished and Government Installed) in the case of a public construction project. This thesis is aimed to analyze the current status on the problems of each project party and understand their improvement requests so that mutually beneficial plans can be sought and improved process is presented for the continuous development of the direct construction material purchase system as well as successful construction projects. And This thesis summarized the purpose of the institutions and their change histories, and related law as well as codes for the better understanding of administrative procedures for the purchase system and the analyses as well as the improved process on the difficulties in complying with the current institutions.
        4,000원
        34.
        2014.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        While Korea had achieved radical growth of construction industry, it also had accumulated problems in material, human and economical loss due to its low quality of safety level. Therefore, not only enterprises but also the nation is putting in a great deal of efforts for construction safety. However, its effect is not satisfiable. This research aims for change of construction cite by introduction of professional Safety Patrol Management System(SPMS) and consideration of its necessity. To consideration of its necessity, we compared and anaylzed average numbers of indicated dangers and safety accident incidences in each construction cites and we researched changes in worker's safety sense. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.
        4,000원
        35.
        2014.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The disaster and safety accidents in any construction site occur inevitably. Since the on-site disaster and accident occurrence became one of major concerning factors in construction site, architects & building executers have been flooded with safety management advices. The purpose of this paper is to survey and analyze the effect of the application of Safety Patrol Management System(SPMS) upon the reduction of disaster & accident occurrences in construction site. In order to estimate and reduce the disaster and accident ratio in construction site, various surveyed data has been analysed. It will establish the suitable design standards and suggest the basic database for estimating disaster and accident ratio.
        4,000원
        36.
        2013.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        On this study, we extracted pending problem and controversial point from management of disaster such as terror for domestic massive performance and then, investigated countermeasure plan against disaster for massive performance through comparison and analysis between anti-disaster strategy of Korea and U.S. U.S are conducting security system actively for passenger of major facilities such as public institution. Nonetheless, In U.S that has the world’s best security system, serious affair such as 911 terror and Boston marathon terror are continued to happen. When considering domestic situation that North Korea and South Korea are antagonistic to each other, it is judged when it is high time to prepare for threat of terrorism. Accordingly, On this study, through analyzing of latest terror attacks in U.S and disaster risk in the nation, we analyzed in detail countermeasure plan classified as legislation, operation of security system, instilling a sense. As the result of this analyzing, using by flow-chart, we suggested domestic optimized disaster management system for massive performance. Consequently, we propose to establish systematized disaster management system such as preliminary survey of disaster influence for massive performance.
        4,000원
        37.
        2013.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.
        4,000원
        38.
        2013.04 구독 인증기관 무료, 개인회원 유료
        Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.
        4,300원
        39.
        2013.03 KCI 등재 구독 인증기관 무료, 개인회원 유료
        Industrial disaster caused the deaths of 2,114, construction workers among them was the highest of 621 deaths. In the construction industry, has established a number of safety alternatives to prevent accidents. But until now, the cause of the accident has stopped being superficial analysis, awareness on the root cause of the acciden did not reflect. In this study, we analyze the characteristics and causes in G contractors' safety accidents. And innovation strategy, organization-wide safety management system and detailed tasks to derive essentially was to prevent the occurrence of large construction companies. A lot of business for accident prevention effect was transient and formal, to reflect a management style and organizational culture, and try to prevent construction accidents. we will strive to prevent the disaster from the construction site through the improvement of these.
        4,000원
        40.
        2012.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.
        4,000원
        1 2 3 4 5