Equipment and machine of industrial plant are give effect to mechanical-stress of many working-stop or long time operating. Therefore, to be old and decrepit of every king of equipment. As long time operating equipment period into increase conservation and of repair equipment time is efficacious necessity of utility factor gradually that of productivity of diminution and complete equipment expense of increase. Conservation at special skill working and necessity is that will effectually and complete a period prevention management diagnosis can conservation point at issues at in advance.
For the accident prevention, it is necessary to identify common factors and characteristics contributing to the industrial accidents. This study concerned with the accident characteristics by age of injured person in the manufacturing industries. To make the statistical comparisons for the accident characteristics by age group, we derived the distributions of occupational injuries in terms of accident time, accident type, activity at time of accident, injury type, injured part of body, agency of accident, and workday losses. The results show that the characteristics of the occupational injuries by age group are not significantly different in a31 characteristics investigated in this study.
Assignable causes producing temporary deviation from the underlying system can influence on process adjustment and process monitoring in dynamic feedback control system. In this paper, the impact of assignable causes on EWMA forecasts and process adjustment which is based on the EWMA forecasts are derived for optimum control methods.
The consequence analysis for the unconfined vapor cloud explosion(UVCE) accident by the continuous release of butane vapor was performed and effects of process parameters on consequences were analyzed in standard conditions. For the case of continuous release(87.8 kg/s) of butane vapor at 8 m elevated height in the debutanizing process of tile naphtha cracking plant operating at 877 kPa & 346.75 K, we found that combustion ranges of dispersed vapor estimated by HMP model were 11.2~120.2 m and overpressures estimated by TNT equivalency model at 200 m were about 37.35~55.1 kPa. Also, overpressures estimated by Model UVCE I based on advective travel time to XLFL were smaller than those estimated by Model UVCE IIbased on real travel time between XUFL and XLFL. At the same time, damage intensities at 200 m and effect ranges by overpressure could be predicted. Furthermore, simulation results showed that effects of operating pressures on consequences were larger than those of operating temperatures and results of accidents were increased with increasing operating pressures. At this time, sensitivities of overpressures for UVCE accident by the continuous release were about 5 kPa/atm.
국제 공통평가기준(CC)은 정보보호제품의 개발. 평가. 사용을 위한 ISO 15048 국제 표준이다. 국제 공통평가기준의 제 2 부 보안기능 요구사항은 정보보호제품의 보안 기능을 11개 클래스로 분류하였고, 13개국 인증제품 상호승인 협정(MRA)에 의하여 교차 사용이 가능한 평가된 보안제품을 해설할 수 있는 공통 언어로써 사용할 수 있다. 보호프로파일(PP)은 특정형태의 제품군이 지녀야 할 보안 목적을 사용자 그룹에서 요구한 명세서이다. 보호프로파일은
To keep enterprise's competitiveness on condition of the automatic manufacturing system such as FA, FMS and CIM, all the maintenance problems should be considered seriously in not only production and maintenance but also related industrial safety. As we analyze in the surveys for the maintenance management of domestic enterprises and the causes of Industrial accident, there will be necessity of drawing up countermeasures for prevention of industrial accidents and for ensuring expertise maintenance technologies. Based on these analyses, this study studied the safety information system, maintenance management information system, and the machinery condition diagnosis technique by using of the knowledge-based system under the internet environment. This web based knowledge-based diagnosis system can easily provide not only the knowledge of expert about deterioration phenomenon of industrial robot, but also the knowledge of relating safety and facility on everywhere, everytime. Therefore, when we use this system, it is expected to improve the efficiency of business processes in the production and safety.
This study proposes strategical, practical guide to build up ERP system through several case studies to large company and comparative analysis of success and fail factors. Key words in paper .is in summary of previous BPR and ERP studies, try to clarify relationship between BPR and ERP, derivative seeking of practical key success factors through several real cases studies to build up ERP system which is in-house development or customization of commercial package.
Nowadays, every kind of system is changed so complex and enormous, it is necessary to assure system reliability, product liability and safety. Fault tree analysis(FTA) is a reliability/safety design analysis technique which starts from consideration of system failure effect, referred to as “top event”, and proceeds by determining how these can be caused by single or combined lower level failures or events. So in fault tree analysis, it is important to find the combination of events which affect system failure. Minimal cut sets(MCS) and minimal path sets(MPS) are used in this process. FTA-I computer program is developed which calculates MCS and MPS in terms of Gw-Basic computer language considering Fussell's algorithm. FTA-II computer program which analyzes importance and function cost of VE consists. of five programs as follows : (l) Structural importance of basic event, (2) Structural probability importance of basic event, (3) Structural criticality importance of basic event, (4) Cost-Failure importance of basic event, (5) VE function cost analysis for importance of basic event. In this study, a method of initiation such as failure, function and cost in FTA is suggested, and especially the priority rank which is calculated by computer-aided decision analysis program developed in this study can be used in decision making determining the most important basic event under various conditions. Also the priority rank can be available for the case which selects system component in FMEA analysis.
This research aims at the improvement of the manufacturing productivity of . kitchen furniture industry. W company deals with the orders of 2 types - the one is the batch order for mass production, and the other is the order of a customized single set. But, because the company has a single manufacturing system appropriate to mass production despite of the above 2 types-orders, the problems of increasing work-in-process, throughput time and material handling time were resulted in, and the overall productivity was generally low. We proposed a new material handling method to substitute the traditional one, the rearrangement of facility layout, and the introduction of a proper outsourcing method. This research results in about 80% increase in production quantity in the same period.
First, in order to improve selecting method of quality characteristic level desired by customers, S/N(Signal-to-Noise) ratio of Taguchi in larger-the-better characteristics was applied. Second, the Matrix classification standard of ACE(Attribute Categorization Evaluation) is presented using KANO model on difference analysis of importance and satisfaction through questionnaire from customers. This is for reflecting the diverse EC which customers want in EC quality sufficiently. Also, establishing sales point will be helpful in business strategy through presenting types that are able to decide planning quality. Third, the important measure of EC about correlation among quality characteristics and a new weight of EC are calculated depending on importance of EC and the weight of customer attribute and materials of relationship matrix through correlation matrix analysis.
The purpose of this paper is to describe a new analytic method of capital budgeting projects that takes into account both customer wants and competitor's status and to give decision makers a tool for goal setting and planning for technology. This model, which is based on quality function deployment(QFD), has used the analytic hierarchy process(AHP) to determine the intensity of the relationship between the variables involved in each matrix of the model and the 0-1 integer programming to determine the allocation of funds to various technological projects. This paper also proposes how to calculate the new weight of columns to consider various strength levels of roof matrix, representing the correlation among the quality characteristics, using Lyman's normalization procedure. To compare this model with Partovi's model, I adapt the same example which is suggested by Partovi and I show that the value of object function, has maximization problem, in this model is larger than that in Partovi's model.
Developing a new commercial product, it is need to connect the end users demand of quality to the industrial technology of company. For this reason, this study is to build up the users demand for the imminent marketing product of a certain company by Analytic Hierarchy Process, analyze quantitatively users subjective thoughts collected by Group Consensus, calculate the added-value of users demands and verify the consistency of users opinions by consistency-exponential-calculation. The added value obtained by this method is substituted into a user-demand item of Quality Function Deployment. And, the technical characteristic data transferred from the extracted essential factor for developing and manufacturing a new product is substituted into a technical characteristic item of QFD. The faculty of quality is firstly finished by this procedure. But, because the relation a technical characterization with users demand do not be known in new product, Wassermans method was introduced for the correlation users demand with technology and for the processing and marketing of a new product. The all assumption on this thesis was based on the reliable real data of a certain company.
QFD (Quality Function Deployment) was defined by the American Supplier Institute in 1987 as a system for translating consumer requirements into appropriate company requirements at every stage, from research, through product design and development, to manufacture, distribution, installation, and marketing, sales and services. Although QFD has complex and tedious procedure to complete, it has now been in use in the world for at least 15 years because QFD enables us to catch a lot of fruitful information on the given system. The objective of this paper is to provide and analyze the trend on the choice of subject courses of university students using QFD. The data are collected by questionnaires. The samples for this study are randomly chosen from the universities in Seoul, Kangnung, and Samchok during 3 months (2000. 3∼2000.5). The results of this study will play an important role not only for service of students but also for opening of courses.
Broadband networks are designed to support a wide variety of services with different traffic characteristics and demands for Quality of Services. Bandwidth allocation methods can be classified into two major categories: static and dynamic. In static allocation, bandwidth is allocated only at call setup time and the allocated bandwidth is maintained during a session. In dynamic allocation, the allocated bandwidth is negotiated during a session. The purpose of this paper is to develop policies for deciding and for adjusting the amount of bandwidth requested for a best effort connection over such as ATM networks.. This method is to develop such policies that a good trade off between utilization and latency using cell delay variation to the forecast the incoming traffic in the next period. The performances of the different polices are compared by simulations.
The molten carbonate fuel cell has conspicuous features and high potential in being used as an energy converter of various fuels to electricity and heat. However, the MCFC which use strongly corrosive molten carbonate at 650℃ have many problem. Systematic investigation on corrosion behavior of Fe/20Cr/Ti has been done in (62+38)mol % (Li+K) CO3 melt at 923K by using. steady state polarization and electrochemical impedance spectroscopy method. It found that the corrosion current of these Febased alloys decreased with increasing Ti content, and this attribute to the formation of LiCrO2 layer at the surface.
Electrochemical promotion of the reaction rate was investigated for CO oxidation in a solid electrolyte catalytic reactor where a thin film of Pt was deposited on the yttria stabilized zirconia as an electrode as well as a catalyst. It was shown under open circuit condition that potential was a mixed potential of O2exchange reaction and electrochemical reaction induced by CO. The effect of electrochemical modification on the CO oxidation rate was studied at various overpotentials and PCOPO2.
ABS sensor ring has been manufactured by powder metallurgy (P/M) method using 400 series ferrite stainless steel. The results are following. It is supposedly sufficient to use for control computer due to good experimental results of magnetic characteristics. Compared with sensor ring made by iron, 400 series ferrite stainless steel has shown a good corrosion resistance without an addition surface treatment. Thus the decreasing production process has been obtained. As a result mechanical characteristics of hardness and tensile test, 400 series ferrite stainless steel shown a good endurance when it is combined to constant velocity joint(C/V), and has a good hardness properties endurable to sand and pebble impact. The products before sintering are much more corrodible in the condition of spray test of salt water and ammonia than humidity and nitrogen condition.
In this paper, we consider an Inventory system with multi-suppliers. A supply agreement is made with one of the suppliers, to deliver a fixed quantity Q evry review period ; That is, adapting to discounts of under the condition of free addition often implies that the timing and sizes of future replenishment orders are less predetermined. The replenishment decisions for the other supplier are governed by a replenishment policy. This paper, multiple suppliers strategy is a combination of a push system (the main supplier delivers every review period a predetermined quantity Q) and a pull system the replenishment orders placed at other suppliers are governed by replenishment policy. The costs are defined as the sum of the ordering, holding, purchasing and opportunity costs. Based on numerical results, conclusions follow about the division of the replenishment volume among the inventory policy.